Professional Documents
Culture Documents
EARTHEN SHOULDER
EARTHEN SHOULDER
PAVED
KERB SHYNESS
KERB SHYNESS
SHOULDER SHOULDER
METAL BEAM CRASH BARRIER CL OF PROPOSED ROAD METAL BEAM CRASH BARRIER
BOUNDARY PILLAR
BOUNDARY PILLAR
2.5% 2.5%
2000
2000
3.000 3.000 3.000
EARTHEN DRAIN
3.000 3.000
500
3.000 3.000
1000
2.500 2.500
SIDE SLOPE
EARTHEN SHOULDER
CARRIAGEWAY
6.10 MEDIAN
CARRIAGEWAY
EARTHEN SHOULDER
SIDE SLOPE
1000
2.500 2.500
500
3.000
3.000 3.000 3.000
2000
NOTES
1. ALL DIMENSION IN MM MILLIMETERS UNLESS
NOTE:- PLANTATION SHOULD BE DONE AS PER AVAILABLE ROW OTHERWISE MENTIONED ONLY WRITTEN DIMENSIONS
DIMENSIONS ARE TO BE FOLLOWED
2. TREE PLANTATION SPACING DETAIL AS PER
IRC :21-2009 ANNEX-E (MP REGION)
CLIENT: AUTHORITY ENGINEER : EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : SAFETY CONSULTANT : PROJECT : DRAWING TITLE :
DRG. NO. CIPL/D1055/HW/DWG/MISC/ 001
FOUR LANING FROM KM. 100.757 TO KM.
107.350 GWALIOR SHIVPURI SECTION OF TREE PLANTATION AND LANDSCAPING DATE : APRIL 2023 REV: R1
R1 APR 2023 AS PER AE OBSERVATIONS
NH-03 PASSING THROUGH MADHAV
R0 MAR 2023 SUBMISSION OF TREE PLANTATION & LANDSCAPING NATIONAL PARK IN THE STATE OF MADHYA DESIGNED DRAWN CHECKED APPROVED
NATIONAL HIGHWAYS HINDUSTAN CONSTRUCTION & PRADESH ON EPC MODE BASIS
LEA ASSOCIATES SOUTH CIVIL MANTRA INFRACON PVT LTD. EARLTECHNO CONSULTANTS PVT. LTD AK AK SB AA
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA ASIA PVT. LTD KRC INFRA PROJECT PVT LTD. INFRASTRUCTURE CONSULTANTS SCALE : AS SHOWN PAPER SIZE : A3