TYPICAL CROSS SECTIONS

(Package-IV)
PROPOSED RIGHT OF WAY 60000

500 500
2000 1800 2000 1500 Shyness Shyness 1500 2000 1800 2000
Utility Concrete Earthen Paved 4000 Paved Earthen Concrete Utility
Corridor Varies Drain 500 Varies Shoulder Shoulder 7000 Carriage way Median 7000 Carriage way Shoulder Shoulder Varies 500 Drain Varies Corridor

CL OF ROAD

20694 13000
PROW

PROW
600 600
600 600
3.0% 3.0%
Selected Fill 3.0% 2.5% MCW FRL MCW FRL 2.5% 3.0% Selected Fill

2 2
PROW

PROW
1 1

Fencing
Fencing
Boundary

Boundary
Embankment Fill
BC-40
Wall

Wall
1500

1500
1800 DBM-60
Aggregate Inter Layer-100
HFL
PROW

PROW
G.L CTB-180 G.L
Embankment GSB-150
Concrete Concrete

600

600
SG-500
Drain 100mm Thk. Embankment Drain 100mm Thk.

600 600
FIG-2.4A: 4 LANE DIVIDED HIGHWAY
(FIG. 2.4 OF IRC SP:84-2019-MODIFIED)

PROPOSED RIGHT OF WAY 60000 (MIN TO VARIES)

500
500
2000 Shyness 2000
1000 Shyness 1000
Paved 4000 Paved
Shyoff Shoulder 7000 Carriage way Median 7000 Carriage way Shoulder Shyoff
PROW

PROW
CL OF ROAD

12500 12500
600 600
PROW

PROW
3.0% 3.0%
2.5% MCW FRL MCW FRL 2.5%
2000 2000
Utility Utility
Corridor 15500 15500 Corridor
PROW

PROW
BC-40
DBM-60
Aggregate Inter Layer-100
CTB-180
GSB-150
Fencing
Boundary

Boundary
Re Wall SG-500 Re Wall

Fencing
Embankment Fill
PROW

PROW
Wall

Wall
1800 1500
G.L G.L 1500 1800
G.L G.L Concrete G.L G.L
600

Drain 100mm Thk. Embankment Concrete

600
PROW

PROW
Embankment Drain 100mm Thk.
600
600
FIG-2.4B: 4 LANE VUP/LVUP/SVUP APPROACH SECTION WITHOUT SLIP ROADS
(FIG. 2.4 OF IRC SP:84-2019-MODIFIED)

PROPOSED RIGHT OF WAY 60000 (MIN TO VARIES)

500 500
2000 Shyness Shyness 2000
1000 Paved 4000 Paved 1000
Shyoff Shoulder 10500 Carriage way Median 10500 Carriage way Shoulder Shyoff
PROW

PROW
CL OF ROAD

16000 16000
600 600
PROW

PROW
3.0% 3.0%
1500 2.5% MCW FRL MCW FRL 2.5% 1500
RCC Cover 600 600 RCC Cover
2900 2900
Drain Cum Seperator Seperator Drain Cum
Utility 9000 9000 Utility
Corridor Footpath Service Road Service Road Footpath Corridor
PROW

PROW
BC-40
Boundary

Boundary
DBM-60
Aggregate Inter Layer-100
Wall

Wall
CTB-180
GSB-150
Re Wall SG-500 Embankment Fill Re Wall
PROW

PROW
G.L 2.5% SR FRL SR FRL 2.5% G.L

G.L G.L
PROW

PROW
G.L G.L
BC-40 Embankment BC-40
DBM-60 Embankment DBM-60
Aggregate Inter Layer-100 Aggregate Inter Layer-100
CTB-180 FIG-2.4C: 6 LANE INTERCHANGE APPROACH SECTION WITH SLIP ROADS(WITH RCC COVERED DRAINS CUM FOOTPATH) CTB-180
GSB-150 GSB-150
SG-500 (FIG. 2.4 OF IRC SP:84-2019-MODIFIED) SG-500

CLIENT: CONCESSIONIRE: EPC CONTRACTOR: DESIGN CONSULTANT:- PROJECT: PREPARED G.D.M TITLE : SIZE
Construction of 4 lane Access Controlled New Greenfield Highway A2
an
ga r edd ON
T RA C T OR S ON
SUL TA NT
S DESIGNED P.D
Typical Cross Sections
C

y Section of NH-365BG (Khammam-Devarapalle) of length 27.428 Km


PV
A I N F RA
A N T I KA C
J

( I ) IMIT
gu

Spera Infra Consultants


RABAPvt. Ltd
D
T . LTD

HYDE
CHECKED P.D REV
dem Pr

Door No 8-2-603/23/3&15 , 3rd Floor,


Ltd.

from Recharla Village to Gurvaygudem Village (Design Chainage


Fig-2.4A & Fig-2.4 C
L

1-8-343,MNJ Palace,3rd Floor, R0


ER

National Highway Authority Of India rd


AV

3 Floor, P.No.289, Kakathiya Hills,


.

HSR Summit,Beside No.1 News Channel, Road


ED SP APPROVED R.S.P
t.

105+236 to 132+664) under Inter Corridor Route under Bharatmala


o

SR I
(Ministry of Road Transport & Highways) c t s Pv
je
Indian Airlines Colony,Begumpet,
Government of India Guttala Begumpet, Hyderabad- 500081. No-10, Banjara Hills,Hyderabd Aug-22 DRG.NO.
Hyderabad - 500 016 Pariyojana on Hybrid Annuity mode in the state of Andhra Pradesh DATE SHEET
R0 10/02/2022 Initial Submission
SCALE:
REV. DATE DESCRIPTION (Package-IV). As Shown NHAI/KH-DE/PKG-IV/HW/ TCS/01 1 of 3

Aug 17, 2022 - 10:04am


PROPOSED RIGHT OF WAY 60000

500 500
2000 1800 2500 2000 Shyness Shyness 2000 2500 1800 2000
Utility Concrete Earthen Paved 4000 Paved Earthen Concrete Utility
Corridor Varies Drain 500 Varies Shoulder Shoulder 7000 Carriage way Median 7000 Carriage way Shoulder Shoulder Varies 500 Drain Varies Corridor

CL OF ROAD

20694 14000
PROW

PROW
600 600
600 600
3.0% 3.0%
2.5% MCW FRL MCW FRL 2.5%
3.0% 3.0%
Selected Fill Selected Fill
PROW

PROW
Fencing
Fencing
Boundary

Boundary
2 2
Wall

Wall
1 1
1800 Embankment Fill 1800
BC-40 BC-40
DBM-60 DBM-60
G.L Aggregate Inter Layer-100 Aggregate Inter Layer-100 G.L
PROW

PROW
Concrete Concrete

600

600
CTB-180 CTB-180
Drain 100mm Thk. Embankment GSB-150 GSB-150 Embankment Drain 100mm Thk.
SG-500 SG-500
600 600

FIG-2.4E: 4 LANE BRIDGE APPROACH SECTION


(FIG. 2.4 OF IRC SP:84-2019-MODIFIED)

PROPOSED RIGHT OF WAY VARIES

11000 Roadway Width

2000 1000 1000 1000 1000


Utility 1800 Earthen Paved 7000 Paved Earthen
Corridor Varies Drain Varies Shoulder Shoulder Carriage way Shoulder Shoulder Varies

600
600

e% 0.5% to 3.0%
3% to e%

PROW
PROW

2 2
1 1

Varies
Varies

BC-40

PROW
PROW

Fencing
Embankment Fill DBM-60
Fencing
Boundary

Aggregate Inter Layer-100


CTB-180
Wall

GSB-150 1800
1800 SG-500
G.L
G.L

PROW
Concrete

600
PROW

Concrete
600

Embankment Drain 100mm Thk.


Embankment
Drain 100mm Thk.
600
600
FIG. 3X: RAMP CROSS SECTION
(AS PER CLAUSE 3.3.2 OF IRC SP:84-2019 - ADOPTED)

CLIENT: CONCESSIONIRE: EPC CONTRACTOR: DESIGN CONSULTANT:- PROJECT: PREPARED G.D.M TITLE : SIZE
Construction of 4 lane Access Controlled New Greenfield Highway A2
an
ga r edd ON
T RA C T OR S ON
SUL TA NT
S DESIGNED P.D
Typical Cross Sections
C

y Section of NH-365BG (Khammam-Devarapalle) of length 27.428 Km


PV
A I N F RA
A N T I KA C
J

( I ) IMIT
gu

Spera Infra Consultants


RABAPvt. Ltd
D
T . LTD

HYDE
CHECKED P.D REV
dem Pr

Door No 8-2-603/23/3&15 , 3rd Floor,


Ltd.

from Recharla Village to Gurvaygudem Village (Design Chainage


Fig-2.4E & Fig-3X
L

1-8-343,MNJ Palace,3rd Floor, R0


ER

National Highway Authority Of India rd


AV

3 Floor, P.No.289, Kakathiya Hills,


.

HSR Summit,Beside No.1 News Channel, Road


ED SP APPROVED R.S.P
t.

105+236 to 132+664) under Inter Corridor Route under Bharatmala


o

SR I
(Ministry of Road Transport & Highways) c t s Pv
je
Indian Airlines Colony,Begumpet,
Government of India Guttala Begumpet, Hyderabad- 500081. No-10, Banjara Hills,Hyderabd Aug-22 DRG.NO.
Hyderabad - 500 016 Pariyojana on Hybrid Annuity mode in the state of Andhra Pradesh DATE SHEET
R0 10/02/2022 Initial Submission
SCALE:
REV. DATE DESCRIPTION (Package-IV). As Shown NHAI/KH-DE/PKG-IV/HW/ TCS/02 2 of 3

Aug 17, 2022 - 10:04am


Proposed Right of Way 60000

Road Way 12500 Road Way 12500


1500 1500
1500 Paved 7000 7000 1500
PROW

PROW
3000 Paved
500 Footpath 500 500 Shoulder Carriage way 500 500 Median 500 500 Carriage way Shoulder 500 500 Footpath 500

Shyoff

Shyoff

Shyoff

Shyoff
Pedestrian Railing/ Pedestrian Railing/
Pedestrian Railing/ Parapet/Crash Barrier Parapet/Crash Barrier Pedestrian Railing/
Parapet/Crash Barrier CL OF ROAD Parapet/Crash Barrier

e% e%

FIG-7.2A: 4 LANE BRIDGE AT DECK LEVEL WITH FOOTPATH


(FIG. 7.2A OF IRC SP:84-2019-MODIFIED)

Proposed Right of Way 60000


PROW

PROW
Road Way 11000 Road Way 11000
2000 2000
Paved 7000 3000 7000 Paved
500 500 Shoulder Carriage way 500 500 Median 500 500 Carriage way Shoulder 500 500

Shyoff

Shyoff

Shyoff

Shyoff
Crash Barrier CL OF ROAD Crash Barrier
Crash Barrier Crash Barrier

e% e%

FIG-7.2B: 4 LANE BRIDGE AT DECK LEVEL WITHOUT FOOTPATH


(FIG. 7.2B OF IRC SP:84-2019-MODIFIED)

Proposed Right of Way 60000


PROW

PROW
Road Way 11000 Road Way 11000
2000 2000
Paved 7000 3000 7000 Paved
500 500 Shoulder Carriage way 500 500 Median 500 500 Carriage way Shoulder 500 500
Shyoff

Shyoff

Shyoff

Shyoff
Crash Barrier CL OF ROAD Crash Barrier
Crash Barrier Crash Barrier

e% e%

FIG-7.8A: 4 LANE GRADE SEPARATED STRUCTURE (VUP/LVUP/SVUP) AT DECK LEVEL


(FIG. 7.8A OF IRC SP:84-2019-MODIFIED)

Proposed Right of Way 60000


PROW

PROW
Road Way 14500 Road Way 14500
2000 2000
Paved 10500 3000 10500 Paved
500 500 Shoulder Carriage way 500 500 Median 500 500 Carriage way Shoulder 500 500
Shyoff
Shyoff

Shyoff
Crash Barrier CL OF ROAD Crash Barrier
Crash Barrier Crash Barrier
e% e%

FIG-7.8B: 6 LANE INTERCHANGE STRUCTURE AT DECK LEVEL


(FIG. 7.8B OF IRC SP:84-2019-MODIFIED)

CLIENT: CONCESSIONIRE: EPC CONTRACTOR: DESIGN CONSULTANT:- PROJECT: PREPARED G.D.M TITLE : SIZE
Construction of 4 lane Access Controlled New Greenfield Highway A2
an
ga r edd ON
T RA C T OR S ON
SUL TA NT
S DESIGNED P.D
Typical Cross Sections
C

y Section of NH-365BG (Khammam-Devarapalle) of length 27.428 Km


PV
A I N F RA
A N T I KA C
J

( I ) IMIT
gu

Spera Infra Consultants


RABAPvt. Ltd
D
T . LTD

HYDE
CHECKED P.D REV
dem Pr

Door No 8-2-603/23/3&15 , 3rd Floor,


Ltd.

from Recharla Village to Gurvaygudem Village (Design Chainage


Fig-7.2A,7.2B,7.8A & 7.8B
L

1-8-343,MNJ Palace,3rd Floor, R0


ER

National Highway Authority Of India rd


AV

3 Floor, P.No.289, Kakathiya Hills,


.

HSR Summit,Beside No.1 News Channel, Road


ED SP APPROVED R.S.P
t.

105+236 to 132+664) under Inter Corridor Route under Bharatmala


o

SR I
(Ministry of Road Transport & Highways) c t s Pv
je
Indian Airlines Colony,Begumpet,
Government of India Guttala Begumpet, Hyderabad- 500081. No-10, Banjara Hills,Hyderabd Aug-22 DRG.NO.
Hyderabad - 500 016 Pariyojana on Hybrid Annuity mode in the state of Andhra Pradesh DATE SHEET
R0 10/02/2022 Initial Submission
SCALE:
REV. DATE DESCRIPTION (Package-IV). As Shown NHAI/KH-DE/PKG-IV/HW/ TCS/03 3 of 3