You are on page 1of 20
1 Namo ofte Doparmont 2 Nae ofne Wonk ‘Yate of Contact Orgna/Suplmeta scope onactr Split Dae of Capleton of Work 10 Design +1 Operation & Maina EXPERIENCE CERTICATE _bATED.._1]\V]2031- ‘esenBhoraa fale Si & Staton) Prong Ding We Say anton LUD Kr Reva Serer Poa Dining eo ina nar sone ate gat OUP pom waren Yn Rat a sit Lt, Fab fo: Pt N31 629. Avr. Aen Ss, Maw Ho 08 1. uNeAEIONSP RMD Nh grab ed 1215 tm Stn Ege: ORE Cree Koger? ithonearonaotoawt greens ee! 101-017 a Samar canon YOWEE Cre ‘crm cn UE uo eu 8S ah esr ors 8 So Ror: a 1.83 Ces es Seemann Ameen) 9062010, c0T wpeasosze2 aia) a uci se, opead essen una. ce fen pane etn ‘cnn tb tarnvagaanoauq Sapna Man tueanastussweaa Septet TONS) Superintending Engiheer, $E0r, Karmann, “Te agency iS nr) Ld_has successuly executed & completed the following works tam Dessrtion Physical Progress year ane 78 ee aH620 ign Constucton Teg, Conmisering ad maa jechnical specications inausie 0! consnton of #)sling Ice tes surtaco ana measuring device. 3) Fash Moar oh ge disposal pipe shal be minimum of 450 rm cath ‘components shal be provded win Salees sta of grade (oot sia. (wil only for misceleneous works) by araty 10)Clsnacodator bse incudng surge seapping ing OT Water Treatment Pant of Rapid Sand Fes ‘Chamber and Aveaon cascade win side sacs tes amber 4)Clariuculto be ete 304 fora height of 0.90mts 12)Patn ways in ier beds or & flocculation ane wth ed surface of walk vay Site burface of at oor area and water ow area, chemical Nous, Alum sce, labeatry office room chirnaton plan roam, tlt te. (Al ein shal be under RCC foo! ony). [Separate Islated chemical house & chlonstor room has tobe prvided 6)Seperate Wash wal tank of eutabl capacy. 7A he door and windows ae of aluminum 1, eke: Sl pipes anc valves in iter beds ae of D.|, make & cannecion fem Flash mir to Tube seer Flacculton fan, surge depos pipes are ot D1 | pipe.) The btm level fhe clear vate contro chamber must be above GL so as to depose the leakage water rangement shal bo wih staless ste! of Grae 304 for chomcalresitanes and duran ‘Mile pathway: Mirimam af Sots, Side pathway {Minimum of 120m 13}Forg in filer house sha be with T2mm thick Norsk es. 14)Back wash water tank shat be consroted at a minsmum haght of Som above (30 Grae at head wars as speci ih Wor No, 33 af — finishing 2\Ventuy fume channel ih Irs beiom ona house wih tea ‘make The sizeof 1) Rang or the 1 | Water Tresmert Plant of 08 MLO Capecty st Elagandal wo | 35% 4% 108% 19% 100% al | 2 [wate Teamar Pian of 25 LD Copy Ksmnager me fam i om 100% 3, |WaerTeamen Pint 125.MLD Capacity st LMD Clon No ame a 10% 1% 00% (Construction of 14.0 mts da Coletion wollJackwell at a P " Etagandal No oom oO 10% 07% 1n [Ponstustin o 00 Dia RC pip ne $20 Ms is ie ee oe a eo {Connecting tain from Collection Welt Jackwell Cousler Seqred” prin oe, g am Description Prysical Progress yearwse aes? irae aes 71820 Isructre for water tghtness ec, complet for finshed tem |consiuctan of Clearwater sump's (CWS) in he ste elcid by He de (c) and as spectedn technica specications (volume | Pat 8 incding eartwork excavation lang out wate cost and conveyence of all mates, fiaturs, labour charges, elo! & overflow ppe arrangements as specie by of work The work shall be exeovted based on the approves design and drawings othe department patent with ai 1 FORTS coment Sonera MIO? inal ypes of sos except rock requing blasting n wel or dry the department and 108 shown nthe @awinge (ValTPat conditions incuding testing he 000. Capsety @ LMO Cotny ve 79% 0 1% 70 HOOK Capac @ Manado Contraction of Ove 200k for above 200K capaciy Doglegged stacase with fg ew of Ime |p) Ughtenng arrestor of apcoved pater 1 No completo including conducorearng Rate foot dome.) Rating wit Saress Stoo of grado 304 into rows around OHSR fed in RCC (124 of paso ie (ontop af OHBR ete, compet for nied tom of work The work sal bo Head Balancing Reserviour(OHBR) (Column or Sha type) sing a0 Grade Design mi cone rhs ate selected ny te Department ing vibrated renereed coment conrete ans po the approved desyne ana savings (Part pecteaton (Part B of Volume) wih rat funda, pasting wi CMCt 2 surface ofthe reservoir including oof dome, lee as per Dept Drecton SiFo! the Cl IF Pipes vereas aves, Execten a 72 Dep, ncuing the cost and conveyance ofthe all matral, Bends, Specials Ee complet jab loveib) D1 man ola covrs wih Fame of s2= 0.60 X00 mis -2 Nos {CC Phin wih copper er Saross sol fyproof mesh e) RCC precast ladder or Aum ladder of O45 mis wit) 2 nos.) RCC spl sla ease wh ang handing Upto 2nd landing of? 2s and S$ Handaling upto mt) Water 3) 2 coats of Weather prot emulsion pa ‘vec bated ont tha a ‘of Volumes) and sf ing for extra suracos. ard 3 cots Selacod by the department, or Head patios in toesnca epony paint to pot Deeg ana drawn approved by Including the folowing 430 Grade Conerete a) Balcony of © Tsmts with at oor {ight duty) c) 0! Swan Neck vetisos sal be povided in Top domesiab wh fyprootmesh level indestor of epproved pattem 1 No. csv ot tires coats of epoxy panto nner eros of the resevor nckudng “Doar 78mm th te approved designs and drawings of he department. “mm tena aroun the pherbhary 220K. Capacy 1m supa hag OHER Kamarpur 2% 250 RL Capocy 201m sgh hgh -OHBR Subssnape 120 Capt, 20m sagna heght-OHBR Josugua ‘Consrscton of Ground Level Balancing Reserviour (GLBR's) nthe ste selec by te department wih vibrated reforcd cement cone W-S0 Grade as shown inthe lravings (Val Part) and as spected in tocnialepeieatone (volume | Par 8) incudng earhwer excavabon nal ypes of sos excep ook requng astng in wet oF lr conto incuing bang out water cost and conveyance ofl materials, ture, about charges, lt cute & ave ow pipe arrangements as spoced by the department land testing the ttre for water Yghtness et, complete for fished tem of werk. The werk shallbe sxecutd based onthe approved designs and drawings of he cepartment wee i jeer “MB. Unison, HUZURABAD. Physical Progress year-wve Imasonary, ex masonry wall, placteing ih Cement mortar and using leaving (Par of Voi) and as speciied in tem of Techical specfeaton (Pat B of Vo) incudng cost. Conveyance oa mates, 28 per epecticalios and as per nswuctons of Enginer The work shai be exeeted based onthe approved designs and drawings best county wood doors and windows and cement concrete semen ost teat sa mie mire me ec + fone olan @ Pao we o me 7 @ 7 2 fron ch @ esse 5 oO we moe oe “0 nation of Pamphoosol Fis is SEC) pret wh ROG Farad ae, mcs ance vv eave cena ona aa looting wih RCC rea la a pot labour charges et, fr frshed tom of ofthe department 7 Fn LO Caley EDS Ne a oe o 1% 1% 2 PRO SPREE (aes om = 2% ° ‘00% > a aa TE 5 om | oe wx | ow lv conveyance of ai mat, secur charges et, for fnshed pofoved designs and dravings ofthe depacmant (Consnicton of Watchman quartrin the ae slociod by ne department wih ROC framed sbuctr, wih vibrated Imasonary, rick masonry wal, pestering with Cement mora, and using bast country wood doo and wedons, cement concrete oong wih RCC ro siab, Pung work, Sanitation Work, electes werk ad al aner mise works spor drawings (Par of Vol) and om of work 3 reinfoead coment conerte & necessary a8 speciedn Techniea! pecticaton (Part of Vol!) excluding taxes er specicatons and as perinstuctons of Engineer The work shal be executed based onthe ‘undaions and RR TER Ta (SH pe Ceara TO Cay OES om “10% [BIN a OT pe GOST OD Cy IS ow om 2% (Ghat Roads Excavaton nha areas nara rock requring lasing, by mecharical means inuding taming of slopes and posal of cut tera with a Ws and ead uo foao mews a per Ten Speceston 01 NORTH a *e ‘woe wm % o% “0m ——— No om 100% om o% 100% Cones Sigua Executive Superintending Lnision, | a # feces Kosmnena tam Description Pe Pye Progress year wbe Ianufacture,caply and devery of WS Pipes conferming 1S 358972007 noting NSIDE {ricky shariretng or gunetng duly prov wire mesh of sze 50x 50 x Sm eusing cost dng ates & dues, e.Incudng earth werk excaaton in al Ypes of als excep requ welding, ring materi and cost of transportation of water ncsing [wort as cect by departmental officer (hner gamete of pipes ony) Epony Panting shoud emptying pipe ine a of al materi bo fer comietin of ek EPOKY COATING 408 mires and ot coating wih coment mortar (73) Som ur charges, wanspotaton i anyarore i basting, cost of ayn, jontng,hyresatic fed test pressure, ntudng cost of i esting, feing of tench, ee, complete fr fished tam of be of RALISO171005 and shal have WRAS approval & commissioning of pipe he State, but 4+ |1509mm ia tan ik Sis nt ¥ om Genta Bot er wa = me ery et 3 er as = [| Tesing oe Sal 80 Censors S 8 ‘Sup a8 iz [308 Gemting 3 3198 yng er ad ry Tesing Bm oF aa Comer 23 HOO mm ia 14mm ik Sup fw Sid Te oe Gunateg Ret Sas ae re Catal a 3 375 Tesing a To aE Tar Superintending Engi, "MB Circle, Kerimnagar.g, Physi Proges year in tar Deserition nt Tota a anee Ed mae 201820 Conmsonne Re E es é wa 4 | 00mm bia 12 mm ick ‘oy aa 7a 7 : i co et 4 7a = E wom Layne et var Tr 5 som Testa Rat =) a : som ‘Conmsorina Rat ar 3 om | 1900 mm Dis 10mm mick ‘Srey Rt = Bree Ea unre Rt = 0 a a oe al = a 7 aa Tesira et ma bial |e {1000 mm ie 10 mm tek 5 = 7305 wr a = ‘unre Rot a oa =e 18298 Layne Rat bad oer ma 15290 Testa Rt basal eet = 5208 Conmsonra nt = 5200 Executive. AaB. Urdsion, Copotes Gignac” othe bee are isc Farmnegz, Physica Proges years tem Deseton ot Tot ies ire 18.18 19.30 ‘Sy et si = z 3158 orn ee ase 3138 ‘oie fe SE = z a8 Tesine re = z 38 Cormeen Bee 5 : re z 188 «| 0mm Oa 10mm mek Sa ae E A ae 76 ayes fe 5 ae 5 76 (cia ft a aa [2 [FT comeisoora Re = nif =a) aie [350 in men ck : T 1 ‘Supely ent = 4 aa Rat 5 ma Tera nt : 5 1 19 Conmonna Rt zal z i a [aie [Forte volowing fel et pressures (he manutachie snat design he pipes ae per the Cade 784-3001) [re-stressed (Cytinder type ) concrete pipes confoming to 18 7642001 @ exact cost of pipes, ncudng ansportaon lying, joining, tectng bonds, ees, speci et. | 80mm Di POGP-T6 Wick hisses a 5 a 5 co In Excnton aig ng nt = oy : 8 ly aru tostg nt = a : ms IM Conmssning Rat a : 5. Gogh Sqn erceer super ei Oe ete CREA) “isc, Kariagary, Pyscl Progress year we al om Desertion sit ‘ota oi owes orra8 anes ze20 (Construction of ppoines for water sup wih DI cankfopally cat pun) Ductile ron SIS pipes wth cement mortar ning nae ho pipe a po 1S 6329.2000 wah Rs mendmens an evsionstoroon and wt ber gases as per IS: 4179, nding supply pes and uber gaskets, Ton ots as pr (13982-1982 ad Dl specials as y_ Porte rsuirements, wen, ying and setng of pipes te fo aignment and gradient excavation af Ppkine onch (Eathwerk excavation inal sls upto SOR using machine rato fr 25rd and anual ate fo 1/34 af quanta) of plpline in also excope rock requing Blasting and efiingonches wih excavated ea other than rocky Boulders ard BC Sos) wih watering and tamping and removing surplus earth rom se of work ad fling pipeline wih water and tng to the required pressure & ammisining of Pipe ine 70 meni 1K Pipe ne 9 Ss a oar a7 Erevan apg ang Fe a Ed sor i yruic arg Rat a2 3 was 7 IM Conmissonna te oene Ri rs 6 Bes 7 [7 a OIKS Pipe ine T inswey et 86 ee 380 in Exon Lara ana ee 70 eares aa 43350 fi ut og Ret 78 361536 ez 43360 iviconmssonr te here nt | eat 5360 | 0m is DIKS Pipeline T in supiy Ra sas Hore i am in Exar tag Esa ne 295.6 “erat eT 0000 in arate tstng nt om05 26853 rex 0000 |e conmssnns a shane nt i 02 w 00 |[F [ 60 mm is OTK? Pipe ine (prsieni at m0 Eo} in econ Lang ona et 2 2 300) Tents sing Rt 10 0 300 I Comming a ea ae 0 300. 5 | 600mm Dis O1KS Pips ine psu at 00 Eo Excevaion, Lay & Jong en 087 8 "x00 Executioe Pogincer MB. Union, Superintending Bagineet, "UB Circe, Kerimnagarg, ysl Progress yearwe lan tiem Dsciton ne ot x anew mare 849 ane20 in yr ang Rat 2103 rear ooo In Conmissonnrg hi sane Re Eo} Eo & | 50 mn Os DIKT Pipe ine inswety et an 7 7 0 inexenton, Layo sora nt tz 2 70 00 in aru sina et 37 ro 1095 0 fui Censsonra ti chene Ree 8 co 0 [450mm i OK Pipe tne insweiy Ret ares 7s ae in exanatn apna org Re ‘wos 5 705875 Eo ln tore sing Re eesne ac00 sa. fe Conmesonrg he chore Rt Es eas sue 3 | 400 mm bia OK Pipe tine h sie Ft ar a0 (fp eestor Lara aning Ret asset ord sr80 ia aru tstng Ret ‘5125 ur 5 = "10 i) Commesinins i chon Tent 00 780 9 | 350 mm Dia OKO Pipetine hn sue at 7 7s i) eestor Laying ong ot 73 Tes, irae sing Ret 73 76 wi cemmssionng te shar et 7 7, “| 380, Dia 1K Pipeline Sup a 0 = Jo Excavation, Laying & Joning Ret 380 3390, ‘ayer sing et 300 sso [a canmssonng fe shane Ra Eo 320 1 30 mm Bia 1K Paine S68 at 08 ae eign suit Ege ‘yup Circe, Karimnagar. aia ae Physi Progress youre s ral 201647 17-38 2018-19 201920 sa (Excavation Lavina & Joning nt 8108 = aie [rousing nt 18108 "e108 [i Gorisioning a hana nt Tes 738 75108 7 | 200 mm Dia OKT Pipetne Sa it es 3a085 58 9 Exava, Laying & Joma fmt "0678s “z018s = 2596 irae ng nt 50086 e025 a st6 |i Gorissen ie eho Re ar aes 586 5 [250 mm Dia 1K Pietne Si it as 508 ) Beara. Lang Bong nt 6508 6508 iH etr mt os 6808 Cormissining te scheme Fmt co 6808 {4 | 200mm Di BK Pipetne sure nt 70a} “aot 9) cn, Lay & ang Ft sooco | 0000 [nH iosing int 0000 "0000 5) Conmisssnng he shee rt eal “0000 “0000 1 | 200mm Dia 1K7 Pipeline i a a nt 000 [e000 fi evaion Lang ng mt ooco | 10000 i erates "ant 000 “0000 iv Commissioning te severe nt 7060 “0000 76 | 160 en Bia IK Pipeline in svom it } “oot in Excavaon Laing & Jaring Ft “ | ——reo2o i) rau es Re ‘co 10000 jw Commissioning te scheme Rt 7060 10000. 77 | 10 en Dis DIK Pipeline Executive | IAB. Unison, Coy 5 sepinteling Eee rad” * up Cirle Karina, tem Desesi nit Gaetlee eal Total a a me ‘errs aore8 2820 psy mat 2s “to aa fect pie ft Et esr 50 Ee ising ft 205 10 60 Fl consasnrg 7a amr oa 60 5 oo wn i Pte bseoy [rr a ra ast jest eet [re ae oa a siete [at a a cones oe [fee a 5 onsructon of pipelines for water supply wit HDPE PE-100 grade pipes rk and ling ppeine wih water and testing to the required pressure & Ci 2 par 4084-105 amisionng oFPipe ine whe amendments and rvisons thereon and inciing SuPevng ot [pes necessary specials suchas bends, Tees, etc as pe se requirements, lowering, laying and joining of pipes (wih but ison welding) Yue fo ligament and graient, ton of Pipsine tench (Earthwork excavston mal sls upto SOR using machine ate for 20rd an mana alo fr 133 of uany) of pies ial ots except rock Fequing basing an rofing Wrenches wth excavated earth (other than rocky eas, bulers and OC Sols) wih watecng and tampig and Yemoung Surplus ert am st of mm a HOPE PE0 puts Kowen2 roo ft Executive MAB i non ay rine [eee se me sos i Hrrieina [eee S aa "ee Conmisnna shone Fat [ee rz a0 Sony sepa eat, PL) sos | S = 15052 In Excavation Laying & Jina [at | teose = x) jin Hydraute testing ra | mt 115052 - 15062 I Conmisonna ne shone [ee =m 12 a[fsrm a HOPE P- aaco-16 Kone I Cab Sige” SuperintenitgHngincer, ag ile, Kagan, Physical Progress years ies ee aie ba ae od Ey ane20 meat [seen Ft 1000 10000 in Ecoatontayngomtrg Ft 1000 16000 (ny aroutctsg Ft 1000 16000 i Conmsscnng he sehen Ft "e008 16000 [5 rm dla HOPE Poo grade 125 Kgsen sire nt 00 520 10008 (nEcovaten Laying Jonna Ft 10000 1000 ln aru ting Ft 11000 10000 Commissioning tesa nt Tea za. 10000 175mm ca HOPE PE00 grade 6 Kasten 67 Fo 70 zit 10000 in Bcovaten Layne 8 Jong nt 0 an. 10000 in rrroue eng Ft 658 oust "con ji Conmissenng He eehone i oa 8 "e000 "75mm da HOPE PE-100 grade Kglema uy ot 10000 76000 Eseaveton aya & Jorg et oy 8 "000 inertia nt 0 ey 7000 Iv Canmisnng fe eione nt 7 et 7000 [75mm ia HOPE PE-00 grade 10 Kiem inser ant 00 cy ue. IRABAD. superna Elie, ce, Kanes gt ~ Executive {2 Phyl Peas yore i. om Dscton| ne “oa A 167 arse zore8 180 [nescnaton tpea Jere ee a 5 00 oo fet a 5 zi 200 hn commesonna tascam re Ei = Ei 00 | les ia HOPE Pe-06 gra 125 Kutna [pwr rt 198 rai 00 In exenton ayo & nina re a 200 lrraeseng re a 200 T frcinmescana ta aerana fee = a ‘00 | Sho mm ss HOPs Pee grade Salon [pecs fe 10000 10200 [fp ecenaten ayes nina fre tes 735 oo 12000 1 nists fe em 281 SS 12000 Cannan ahora fe 0 rasa 12000 {o)tomem dis HOPE PE-0 grade -# Kolo So ft 1000 5 |e Jpenton Lay orig ft 10220 “2000 touting fet a ni “e000 scorns ohne fet : wee 738 “0000 1; ome i HOPE P00 grade 10 Koen De ft ‘2200 = 72000 Benn Laing org ft ‘13508 08 “2000 Combs Signed Saperintening Bhp, oa gece a isn ‘tem Description Unit ee ree Total men mnie es 8 ined wna nt costs sims a0 reaming Renae at ae a ram 120m di HOPE PEE ade 125 Kannd [hss nt 3100) 21 Ea nnn Lara org a a ailaies aus ra re sal os [oe csmnsong ee a Ei aaa ae or {50m sa HOPE E00 ge Raven? ey ra a wa ean Len ria re al as co nyande wing re a we censors ret _ oo 107 a HOPE E00 grade Ranend po re aa [oe ewan ea a re aaa = intrewse wns cI aa [ee ba crm chane et 0 no {507m a HOPE P60 grade 10K SuRpIY - Rm 6000 = ‘6000 yen Lea ora ne a om rome wna ne aa om Cooke ST Executive | MB. Leon, AUZURABAD. siperstndng ie, agporee Fann Physical Progress year vie lax] am Description vit ‘ou x mea mara owes 2nez0 [i Carmissong te shee ot co 2 00 110mm la HOPE PE-100 grace 125 Kslom2 Suir Bt Ent : 30 [Berton Lang ining ot Eat 76 ra 300 aac tra ot eral EI Fall 00 Comming eae ot a fa 00 17 125m la HOPE PE100 grade 6 Kgsem’ psn ca os rss : Eran Lapa sng ~ et zi rae 20 z 9 young co 04 eon EJ 8 in Conmnssonrg he arene Rt 66 Fra "125m la HOPE PE-100 grade 8 Kasim? I insieey Ret a. : 00 (Extn Lana aanang Rt co 3 000 intra tsing Ret cal E 00 |v Conmssonrs he heme Ret om = om 19125 a HOPE PE-100 grade 10 Kuen insure a 00 E om in Exton Laying Romina ae ne al : som ly aru ting at = = 2 000 I Comming te scheme Rt m1 a o00| “SAB. Unison HUZURABAD Couple See” Supeiataing ger i Gre, Karman, Execut MB. "HUZURABAD. 5 Pry Prooet yearvise i eae a mie? serra ea 1830 a 29) !281 i HOPE PE-100 grade 2.5K? bse ft = " oe aig Rot = 2 "50 rcermisenng ne stems at Ear 1509 | Mo mm a HOPE E100 rade Koon 0 ie = "ase caval Lay ori at “2ss0 on “ws i yout etna [a 700 ona | jo canessanng te stems [ee a 259 | 1am ia HOPE PE 100 grade 8 Kosta | ry nt i m0) 0 Baton Lara oreo [ee aa 000 mn aauctetra nt 00 3000 iv.Conmssonra he atene fine 00 000 72 MOmm al HOPE PE-00 grade 10 Kanone i seb fmt oe eo I xcaron ra rena fine ea rl 00 [rasa nt 69 2007 oo I Conmsionina he schere Ft a 00 10 mm a HOPE P00 grade 125 Kalen? Gols ty Superintending Bnghncer, “AMB Circle, Karimnacer’,. ‘ ‘tem Description Unit eopsest ves eee Total jen me a8 a wee ber a aa Filion Penal oa fa eal 2500 Ina ie Te a a 2500 fr coming ee Te a 2500 7s tone ds ore PE ge Aan ea a oa = rox nan a re Tt ral Fa 00 ea sig co “ st 00 pce ae Te aa a 00 7g fit oP. re Kone Supply Pont 330, a ane LS we ra ED al 0 vasa ea we a 0 br connscang aaa Te a 0 ls NOPE P80 gre ao pases ia a a er een roa mre ft aa a a T8e Inmate ft a ea 7 760 ~ fi Commissioning te wcheme nt “788 =) ‘1988 7a mn a OPE Pn prado S Kon? bay at aa a * Goob tending ‘ Seyi Physical Progress yearwie len hennangt vet [ae wo mee a oo pearan trea mre a = ae oa farms a ee = 0 ho conser ane ts =) soto {itm PEPE 10 gh uo psey a = = Tao een ira me te = = a0 latredcraea tes ms a = a0 fconraonen ene te i a0 [aes na OPE 0 ge Sand paxer a a a = a0 pen ce ie a = cere 00 nice te = 2 a 00 [poematons sane Te ee a 00 [tm a OPE PE ce Basen? ro ta i a 00 [7 Jicaraton, Lyng & Janta et a 7285, 70000) in roma tn "enn 00 Icomssoma ie dere te a 00 Execut ae HUZURABAD sSuperinterding ace Sone Re = ‘hysia Progress yarwise : te Ea ao1e8 e206 tad erostng by adopting tenchlss Technology tunneling work trough specialized pipe Jacking msthod by erecting Wie equipment to te to te alignment and gradient, By reuse pipe jacking technique complete ncludng tunnaing excavation na pes fsa Ineliding har rock. nsertng easing ppesand construction of RCC chambers abe to casing pipe pis.andconvayance charges of machinery and cher requred matrls but excusing cost of encasing pipe, co ordnaon withthe concarned Autores 2s per approve cravings and cect by the Engnaerin -ChargeFOR B00 MM DIA £1000 Mil Da TUNNEL at LocatonsCamanput Gutta Odra Colony- (Osera Colony Man RO Kamanpur Guta Osdera Colny-Baskipay X RD Karmanput Gutta Osdera Colony-Oddera Colony Main RD Ray Nagar - Padanagar) corm aa ACCP Class ot : @ “ 130 a! = “ross by adoping renchlas technology tunneling work Hough spsciized pipe jacking metiod by eecing he equpmnt wo Tue the alignment and gradient, by hydraulic pipe Jacking technique complet inuding tunneing, excavation in all types of sols eluding had Tock, leering casing pipesand eonsucton of RCC chambers Iutabie to easing pipe pls.and convejance charges of machinery and cher required mates but excudag cost of encasng pipe, M cooranaton wth the concemed utories as per approved cravings and dreced by the Engneer-n “Charge Kathapaly canal Jn, Kondapur Shanjgaram Matmadapec X road, Mahmadarcovllage 4 HManmadapoorvilage 2 {coonmdaRco-NPs Case = ] ee rac eel aus | | l | away costing by adoping Wenshlass teindbogy unnsing work Whroughspadilzed pipe jacking mead By eecing he equipment We to The slgnment sd gradient by raul pipe jacking teehngue complet Insudg tnneing. exeavaton in al pes of sous Including had tock, meering casing Ppssand constucion ot RCS chambers tablet casing pp pis.and conveyance charges of machinery and oer requred materia But excudng cost of encasng Pre, co-oranation wih the concamed autores 2s per approved drawings and drecte by tha Engneersn Charge, [o0sia-tamm at KM CH 332/1820 between OPL. JMKT stations & at KM CH 342/12-14 between MKT -OPL ne : 11250 atone [Stations (Areal) & at KM CH 4802-03 betweerkRIMN- | Ft 10 \kPHt Stabors (00st, at KM CH 3705-06 batveenkKRWN-KPHI 1 = | Conk Sq” Superintending Bhginee, Hic, Karimnagay” oy ar omen os ve a ai yu Sein Btn SCs ay Fe On a ag ang one atc es Sg Pot bar Po Ge sey ttle ape rego Sra tn Caen Re etd wa ay sr shy nck ore ny ase Come gn Per Eeipesot betes Sen rean chan geo Sry sat com noe nga gece el aioe carat crmingrar wm coney rst | gp ao a | je bm Ppstne Oren Ona San co000M stein Some a teprn4Da mt yp | som] cose |> petoremere ee gore “ cate te lancom ra hatin fbn OD Pee yp wos] ares (messmo Spn tae ‘ax na Lt has Sucasstly commision the works Upto te extent. inthe wor of Providing Drinking Water Supply o Hebilations in LMO-Karrnagar Ramadug Segments & Manakondur ‘Musrabas Huzurabad Segments (TOWSP) “Gon srt Superintending Eigincer, poe i

You might also like