You are on page 1of 1

Doc.

No SITE CLOSURE

DAY:
DATE:
TIME:

CHECKS YES NO N/A REMARKS

Make sure all workers are out from construction area

Make sure all heavy equipment / vehicle is parked safely


Working area housekeeping is clear

Make sure all electrical equipment is turned off


Make sure the fire at all area of hot work is off
Make sure the construction area (fench, door etc) is locked

Notes:

Prepared by, Checked by,

Contractor HSE / Supervisor RHDHV HSE / Supervisor

PM-103 Rev.01

You might also like