FIT OUT -HOT WORK PERMIT EHD RDT -FOR– 024
Date of
Application
_ _ /_ _ _/_ _ _ _
Permit No: EHD-RDT/HWP/00/…………
Section A: TENANT DETAILS
Project Name:
Floor: Unit No: Retail Name:
Section B: PERMIT PURPOSE (Please select from the below options)
Checklist • Available sprinklers, hose reels & portable fire extinguishers are all in
service and operatable
Gas cutting
Welding
• FIRE WATCH / HOT WORK AREA MONITORING
Brazing
• Trained / Certified fire watch shall be provided during and for 30 mins.
After work, including breaks
Grinding
• Fire watch is supplied / equipped with fire extinguishers
• Fire watch is trained in use of this equipment and in sounding alarms.
• Fire watch may be required for adjoining areas, above and below.
• Combustible on other side of walls, ceilings or roofs is moved away
• Danger exists by conduction of heat into another area Enclosed
equipment cleaned of all combustible Containers purged of flammable
liquids/vapors
Section C: SCOPE OF WORKS (Please give detailed scope of works)
Documents attached: Method Statement Risk Assessment List of machinery / operators & certificates Drawing / layout plan Toolbox Talk Other Documents
EQUIPMENT TO BE USED:
Section D: CONTRACTOR DETAILS
Company Name (Main Contractor):
Project Manager: Supervisor on site: Mobile No:
Safety In-Charge (day): Safety In-charge (night): Mobile No:
Required Documents (mandatory): CPR Card / Visa page copy CR COPY Contractor's All Risk (CAR) Insurance
DECLARATION: I confirm that a safe system of work is in place and a full risk assessment and method statement has been reviewed & approved by the Project Management team and the controls will be briefed
to the crew before start of the activity. Necessary supervision will be available for the task.
Name of Applicant: Designation: Mobile No.: Signature:
INSTRUCTIONS:
a) The Project Manager/ Engineer shall confirm that all required safety equipment & procedures are in place prior to proceeding with the work and is fully responsible for its implementation.
b) Ensure that a copy of this permit is always available at the work location (s)
c) Ensure that all applicable Legislations, Rules and Regulations are followed at all times. The work shall be stopped, and the violator may be removed from the mall for non-compliance
MALL MANAGEMENT USE ONLY
Section E: RECEIVING/ PRE-CHECK & VALIDATION OF ALL COMPLIANCE DOCUMENTS & PROCEDURES
OPERATION MANAGER EHD RDT REVIEW & APPROVAL
Authorized Manager (Name): Authorized Manager (Name):
Date: Signature: Date:
EHD HEALTH & SAFETY REVIEW & APPROVAL
Health & Safety Representative (Name): SAYED
Date:
PERMIT CLOSE OUT STATUS
PERMIT VALIDATION: ISSUE DATE: EXPIRY DATE: PERMIT / OPEN CLOSED
Comments:
Terms & Conditions
A/ This permit is for Hot works only and the job execution and associated controls is the responsibility of the Contractor and the Project Team
B/ This permit is not a substitute for any other permit(s) to work that is necessary to execute the task, which shall be managed by the Project Team. Internal arrangements for the same to be managed by the Contractor
C/ Permit approval process time shall be up to 48hrs and valid as per approved dates.
D/ This permit to access is STRICTLY for the works stipulated in Section B & C of this form
E/ Contractor needs to ensure adequate protection, housekeeping safe area, and safety compliance during the Hot Works
F/ The issuance of permit by The Mall shall not be construed as the mall management being responsible in anyway, for any incident / accident that may arise from the contractor's activities