(Note:- The applicant should hand over this A&A form to local office of HPSEBL in the area in which the
supply is required along-with a non-judicial stamp paper of Rs. 10/- dully crosses with words “Agreement for
supply of Electricity/Power” on stamp paper)
The Assistant Engineer/Assistant Executive Engineer/Executive Engineer,
Electrical Sub- Division, HPSEBL Limited,
________________
Sub:- Application and agreement for new connection/revision of load or CD/change of name
for other than domestic electric connection.
A) Particulars of Applicant/Consumer & premises
i) Name of applicant/Company/Firm/Establishment……....................................
ii) Name of authorized signatory/Proprietor/firm/Partner …………………………………..
iii) S/o, D/o, W/o..........................................age...........
iv) PAN No. …………………………………… Aadhar No(optional)…………………………………
v) Mobile No.__________________ Tel. No………………………………………..
vi) Email………………………………………………………………….
vii) Number of shifts ……………………………………
viii) The wiring work will be/has been carried out by (Name of licensed
contractor/wireman)............................................................
Full Address of Premises where connection is required:
House /Plot No. Village /Town/City
Floor No District
Landmark Pin Code
Sector/Colony/Street Whether MC/NP/TCP
area (Y/N)
Description of premises [ No of rooms,
floors, other area where supply of to be
given]
B) Details of load/class of application etc.
i) Schedule of energy consuming apparatus to be connected:
Description Lamps, Tubes etc. Fans Heaters and Motors
of Refrigerators etc.
apparatus
No. Total No. Total No. h. p. each Total KW
Wattage
Wattage
kW kW
1-Ø 3-Ø 1-Ø 3-Ø
1 2 3 4 5 6 7 8 9 10 11 12
Total
[In case of Extension in load, the existing & additional Load is to be indicated separately]
This agreement for the Electricity connection shall be effective from the date the connection is
released and shall remain effective till such time as it is either replaced by fresh agreement or it is terminated
as per provisions of H.P. Electricity Supply Code.
P.T.O.
[4]-CS-1(b)
(FOR OFFICE USE ONLY)- Other than Domestic Connection
Name of Consumer:
1. a) Standard Supply Voltage .............................. Volts b) Availed Supply Voltage…………..
c) Metering Voltage……………………………………………….
2. Name of Feeding Sub-Station………………………………………..
3. Category applicable as per Tariff Order..............................
4. Details of Amount deposited by the applicant:-
a) Security deposit
Sr. Amount Receipt No. Dated Purpose[New load/addl.
No. CD/Load/revision of security
based on average tariff]
i)
ii)
iii)
b) Normative IDC
Sr. Amount Receipt No. Dated Purpose[New load/addl.
No. CD/Load/revision of security
based on average tariff]
i)
ii)
iii)
c) Cost of Service line/Estimate i) Amount(Rs)…………ii) Receipt No. ……………. Dt…………….
Sr. Amount Receipt No. Dated Purpose[New load/addl.
No. CD/Load/revision of security
based on average tariff]
i)
ii)
iii)
[5]-CS-1(b)
7. Sanctioned Signatures……………….
Feeding arrangement sanctioned Designation SE/Dy.CE
Dated:…………………….
Checklist for Other than Domestic Consumers/Applicants[CS-1(b)]
iii) Crossed Non-Judicial Stamp paper of Rs.10/- attached with A&A form
iv) Valid Power Availability Certificate issued by HPSEBL (in case contract demand for new and
additional load of more than 100 kVA)
v) Approval of Chief Electrical Inspector in case of HT/EHT installation energisation.
vi) Brief Project report [In case of industrial connection]
ix) Undertaking on Annexure-A on Plain paper (where “NOC is not available with consumer)
(For Temporary Connection under TMS Category of Tariff)
B) Identity/Ownership
i) Identity Proof ( any one of the documents given below)
PAN
Adhaar Card
Driving License
Passport
Voter ID Card
Sale Deed
Lease Deed
i) Initial Security
iii) Cost of Service Line or Departmental Charges as the case may be.
* Those consumers who are covered under Regulation-6, 5(3) & 5(9) of HPERC(Recovery of
Expenditure for supply of Electricity),Regulations,2012 as amended from time to time shall
have to bear the cost accordingly.
………………………………………………………………………………………………Cut here…………………………………………………………………………………………………………………..
ACKNOWLEDGEMENT
HPSEB Ltd.
Date Name of Applicant Tariff Category Application No. Load(kW)
THAT the Applicant has requested the Himachal Pradesh State Electricity Board Ltd. (HPSEB Ltd.)
(hereinafter referred to as “ The Licensee”) to provide an electricity service connection at the
above mentioned premises in the Applicant’s name for the purpose mentioned in the Application
and Agreement Form and the applicant is unable to produce No Objection Certificate( NOC) for
electrical connection from [Name of respective concerned Authority]....................
1) that the licensee may disconnect the electricity connection , in the event of a
legally binding order issued by the Statutory Authority(ies) for disconnection of
supply owing to any default /non –compliance of the statutory provisions;
2) that such connection released under temporary metered supply category, on the
basis of this undertaking /deceleration shall be regularized, in the respective
category , only after submission of either floor wise or entire building completion
plan sanction letter issued by the concerned Statutory Authority(ies). This shall be
without prejudice to any other rights of HPSEBL, including of getting its payment
due as on the date of disconnection.
THAT in furnishing the present undertaking/ declaration, the Applicant has clearly understood that
if any of the statements in this undertaking/ deceleration proves to be false or incorrect at any
later stage, the licensee shall be within his lawful rights to disconnect supply to the premises
without any prior notice and proceed to adjust electricity supply dues payable by the applicant
against consumer security deposit and /or recover the same in accordance with Law.
THAT I, Applicant shall be held responsible, if the contents of the undertaking/deceleration are
proved false at any stage and I/We indemnify HPSEBL of any consequences arising out of release
of electrical connection to my premises.
Applicant
SELF VERIFICATION:
I/We, the above named Applicant(s) do hereby verify that the content of undertaking/deceleration
are true to the best of my knowledge and nothing material has been concealed therefrom.
Verified on …………………..
Applicant
HPSEBL Form CS-10( Page-1)
HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED
(A STATE GOVERNMENT UNDERTAKING)
WIRING CONTRACTOR'S TEST REPORT
AND
HPSEBL'S INSTALLATION TEST ORDER
Name and Address of Premises where connection is required:
Name of Applicant ………………………Address…………………………………………………Description
of Premises………………………………………………………………………………………………………………..
From (Wiring Contractor)
Name and Address:……………………………………………………………………..
……………………………………………………………………………………………….
License No…………....... Dated --/--/---- Valid up to --/--/----.
To
The AE/AEE/EE/ ESD, HPSEBL ………………….
REPORT
Please test the installation detailed on pages 2, fill in columns 18 to 22 and report as
below. It may, however, be ensured that the intimation regarding the date on which you intend to visit the
consumer’s premises for the above said purpose is given to the consumer or his representative well in
advance, so as to enable him to be present at the time of Inspection. Also please ensure that for any
subsequent visit for testing of the said installation necessitated by the consumer on the previous visit or due
to defective installation, the consumer is asked to pay the requisite charges as per the schedule of general &
service charges and receipt No./date vide which the charges are paid by him is quoted in the report.
Signature of Consumer
Name( in case of representative): ………………
Dated:_ _/_ _/_ _ _ _/ Signature
Junior Engineer/Addl. A.E.
Dated:_ _/_ _/_ _ _ _/
P.T.O.
SCHEDULE OF ENERGY CONSUMING APPARATUS TO BE CONNECTED HPSEBL Form CS-10( Page-2)
Description Lamps / Fans, Heaters, Motors INSULATION RESISTANCE [MEGA-OHMS]
No. Total No. Watts Total No. h.p/ Total kW Wiring Contractor’s HPSEBL Test
kW each kW kW each Test
Conductors
Conductors
& earth
& earth
Between
Between
Conductors
Between
Between
Conductors
lamp or apparatus
lamp or apparatus
lamp or apparatus
lamp or apparatus
lamp or apparatus
lamp or apparatus
After connecting any
installations
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
No.1
No.2
No.3
No.4
No.5
And so