D2A/19 NOTE & LEGEND

C5B/19
2 G

D7

D6
19a 19 18 17 16 15a 15 14 13a 13 12 11 10 9 8 7a 7 6 5a 5 4 3 2 1 1a 1b

D7a

D5 1c 1d

D4 D4
D3a
D3 D3
PT PC PC PC PC PC PC PC PC PC PC PC C1b
D2 P18 P18 P18 P18 P17 P17 P17 P17 P19 P19 P19 P19
D1a
D1b
D1 D1

680
Da
D D
C7a
C7 C7

C6 PT PC PC PC PC PC PC PC PC PC PC PC
P18 P18 P17 P17 P17 P17 P17 P17 P18 P18 P18 P18 PC PC
C5 P17 P17

2000 C4

C3

C2

C1

B
A1 A1
A

18a 13b 7a

D16-100 (T3)

D16-100 (T4)
12-D16 mm OWNER :

1800
Ø10-150/200 Kawasan KJIE
Jl Trans Heksa, Kavling B6 ~ B8, Komplek Industri Bintang Puspita Dwikarya
Desa/Kel. Wanasari, Kec. Teluk Jambe, Kab. Karawang 41361 - Jawa Barat

2000
APPROVED BY

PROJECT MANAGER MADI SUNGKONO

D16-100
CONSULTANT :

D16-100 (T3)
D16-100

APPROVED BY

400 D16-100 (T4)

CONTRACTOR : PT KHARISMA GUNAMAKMUR


2000 Jl. Raya Bekasi KM.28 Kp. Cibuntu
RT.001/RW.001, Waringinjaya
Kec. kedungwaringin,
Bekasi, Jawa Barat
17540 PHONE : (021) 22160607

PROYEK :

SUPORT STRUCTURE
FOR SPRINKLER PHASE - 1

DRAWN BY GANANG C.

900
CHECKED BY DENI S.

Cutting List Pembesian Pondasi Telapak_Pedestal P18 APPROVED BY AGUS H.

No Kode Jenis Sketsa Tulangan Formula Jumlah Panjang P Total 680 GAMBAR SKALA

DENAH PONDASI 1 : 800


1 T1 Ø10 5d + 4*(580) + 5d 13 2.420 31.460
580
12-D16
580 (T1) JUDUL GAMBAR :
Detail Fabrikasi Pembesian PT/P18

680
2 T2 D16 2100 2100 + 16d 12 2.820 33.840 Ø10-150/200 NO GAMBAR :
SFA-ED-STR-00
640 (T2)
-
No. TANGGAL REVISI TTD
-

3 T3 D16 200 + 1900 + 200 40 2.300 92.000 1 _ _ -

200 1900 200 -

4 T4 D16 300 300 300 + 1900 + 300 40 2.300 92.000


1900