DAILY PLAN SCHEDULE MAINTENANCE SERVICE

SITE SUPPORT EQUIPTMENT


Issue Date : Senin, 09 Januari 2023
Actual Service Yesterday_ Minggu, 08 Januari 2023

START Washing & TOTAL Actual Washing & Service, Include delay Actual Backlog & FUI, Include delay TOTAL LAST
No CN HM PS PS TYPE BL & FUI Est rfu time Hm Aktual Dev Time REMARK ACTIVITY FUI HM UPDATE
TIME PS PLAN START TIME FINISH TIME TOTAL START TIME FINISH TIME TOTAL ALL ACTIVITY UPDATE

Action FUI ;
Action PS, Take Sample PAP
1 TF199 23250 250 8:00 2,0 2,0 4,0 12:00 00:00 00:00 0,00 00:00 00:00 0,00 0,00 -4,00 18230 06/01/2023
Replace Handle Operator Seat

Action FUI ;
Action PS, Take Sample PAP
2 ST043 11250 250 20:00 2,0 6,0 8,0 4:00 00:00 00:00 0,00 00:00 00:00 0,00 0,00 -8,00 Replace Vibration Engine LH 11296 06/01/2023
Replace Air Spring FR LH

Action FUI ;
Action PS, Take Sample PAP
3 TL382 PS Montlhy 250 8:00 2,0 2,0 4,0 12:00 00:00 00:00 0,00 00:00 00:00 0,00 0,00 -4,00 Replace VDO (Ready Container) 38562 06/01/2023
Replace APAR ( Ready Toolroom)

Action FUI ;
Action PS, Take Sample PAP
4 TL538 PS Montlhy 1000 10:00 4,0 1,0 5,0 15:00 00:00 00:00 0,00 00:00 00:00 0,00 0,00 -5,00 38562 06/01/2023
Replace Spring Gas ( R.Planner)

Action FUI ;
Action PS, Take Sample PAP
5 TL271 PS Montlhy 1000 13:00 4,0 0,0 4,0 17:00 00:00 00:00 0,00 00:00 00:00 0,00 0,00 -4,00 Replace APAR ( Ready Toolroom) 38562 06/01/2023
Replace Spring Gas ( R.Planner)

Action FUI ;
Action PS, Take Sample PAP
6 TL526 PS Montlhy 250 15:00 2,0 0,0 2,0 17:00 00:00 00:00 0,00 00:00 00:00 0,00 0,00 -2,00 20757 06/01/2023
Replace V-Belt

Action FUI ;
Action PS, Take Sample PAP
7 CM522 PS Montlhy 250 20:00 2,0 0,0 2,0 22:00 00:00 00:00 0,00 00:00 00:00 0,00 0,00 -2,00 20757 06/01/2023
Action Follow Up FUI

Plan Service Today_ Senin, 09 Januari 2023


Work Order Number WR Service Document WR Backlog & FUI Document
START Washing TOTAL LAST
No CN HM PS PS TYPE BL & FUI Est rfu time Remark Activity FUI HM UPDATE
TIME & PS PLAN PS BL SM UT BP SM UT BP UPDATE

Action FUI ;
Action PS, Take Oil Sample PAP 1. Lakukan Flushing fuel tank & Resample
Replace Seal Output Transfer Gear before after
161879 M34958 Replace Bracket Link Transmisi 1. Lakukan Penggantian Oli Hydraulic
163732 161886 E35135 Replace Lever Control Transmisi
1 TF152 28750 250 8:00 2,0 14,0 16,0 0:00 F35348 L35286 Resample sesuai schedule 28734 06/01/2023
161875 K34888 Replace Gasket Cyl Head 6
161880 K34889 Welding Maintank Fuel Bocor
Program Kuras Tanki Tahunan

Action FUI ;
159982 1. Lakukan Penggantian Oli F/D rear Left
Action PS, Take Oil Sample PAP
161649 M34916 Resample sesuai schedule
2 ST030 33000 1000 20:00 4,0 4,0 8,0 4:00 163701 E35509 L35278 Replce Cover Air Cleaner 33010 31/12/2022
161655 G34703 1. Lakukan Penggantian Oli Hydraulic
Replace Tensioner Belt
161657 Resample sesuai schedule

Action FUI ;
Action PS, Take Oil Sample PAP 1. Lakukan Penggantian Oli F/D Front Left
163283 M35231 Repair Lockdor Cabin Resample sesuai schedule
3 CT117 24750 250 20:00 2,0 6,0 8,0 4:00 164209 K35370 B35670 24739 06/01/2023
161490 B35144 Replace V-belt 1. Lakukan Penggantian Oli Hydraulic
Replace Rubber Mounting Engine (ready kontainer) Resample sesuai schedule

Action PS, Take Oil Sample PAP Action FUI ;


L35395 Replace Gasket Solenoid Cut Off 1. Lakukan Flushing fuel tank & Resample
4 TL134 PS Montlhy 250 8:00 2,0 2,0 4,0 12:00 164323 164236 K35389 E35638 before after 38562 21/12/2022
G35212 Replace V-belt
K35405 Replace Terminal Battery
Action FUI ;
1. Lakukan Flushing fuel tank & Resample
5 TL554 PS Montlhy 500 10:00 3,0 1,0 4,0 14:00 164326 - M35428 Action PS, Take Oil Sample PAP 38562 21/12/2022
H35334 before after

Action FUI ;
1. Lakukan Flushing fuel tank & Resample
6 TL451 PS Montlhy 500 13:00 3,0 0,0 3,0 16:00 164327 - J36016 Action PS, Take Oil Sample PAP before after 38562 21/12/2022
1. Lakukan Flushing fuel tank & Resample
before after

Action FUI ;
1. Lakukan Change Oil Engine & Resample
Action PS, Take Oil Sample PAP
7 TL464 PS Montlhy 1000 15:00 4,0 0,5 4,5 19:30 164328 163013 M35429 K35390 1. Lakukan Flushing fuel tank & Resample 20757 22/12/2022
Replace Cap Radiator
before after

Action FUI ;
1. Lakukan Change Oil Engine & Resample
8 CM585 PS Montlhy 500 20:00 2,0 0,5 2,5 22:30 164329 - H35335 Action PS, Take Oil Sample PAP 1. Lakukan Flushing fuel tank & Resample 20757 22/12/2022
before after

Plan BAP Today_ Senin, 09 Januari 2023

START PLAN PLAN HM LAST


No CN TYPE Est rfu time Work Order Number WR Document Remark Activity
TIME DAY HOURS UPDATE UPDATE

1 TL270 BAP 08:00 3,0 72,0 08:00 164236 _ REKONDISI UNIT & REPLACE ENGINE 29654 04/01/2023

Plan Service Next Tomorrow_ Selasa, 10 Januari 2023

START Washing BL & TOTAL Work Order Number WR Service Document WR Backlog & FUI Document HM LAST
No CN HM PS PS TYPE Est rfu time Remark Activity FUI
TIME & PS FUI PLAN PS BL SM UT BP SM UT BP UPDATE UPDATE

Action PS, Take Oil Sample PAP Action FUI ;


158885 E34567 Replace Bushing Lever T/M
157658 H33990 Replace Steering Gearbox
1 TW171 30750 250 8:00 2,0 7,0 9,0 17:00 164484 H35355 L35398 30685 06/01/2023
158932 B34626 Replace Bearing Antiroolbar
157658 L34358 Replace Screw Bracket RD
Replace APAR (toolroom)

Action PS, Take Oil Sample PAP Action FUI ;


164485 161270 J35420 Replace Air Bellow
2 LO123 23000 1000 20:00 4,0 5,0 9,0 5:00 C36016 J36037 22944 06/01/2023
159285 C34968 Replace Torsion Bar
Action PS, Take Oil Sample PAP Action FUI ;
161867 B35214 Rebushing Bogie
3 LO077 32250 250 20:00 2,0 7,0 9,0 5:00 163733 152868 F35349 K35280 F33088 38269 05/01/2023
Replace Shackle Assy
158386 F34218 Replace Cylinder
Action FUI ;
4 WP845 9500 500 8:00 3,0 0,0 3,0 11:00 164486 No Part Action PS, Take Oil Sample PAP 9399 06/01/2023

Action FUI ;
5 TL552 PS Montlhy 500 10:00 3,0 0,0 3,0 13:00 164487 C36017 Action PS, Take Oil Sample PAP 38562 21/12/2022

Action FUI ;
6 TL553 PS Montlhy 500 13:00 3,0 0,0 3,0 16:00 164488 E35642 Action PS, Take Oil Sample PAP 38562 21/12/2022

Action FUI ;
7 GS686 PS Montlhy 1000 15:00 4,0 0,0 4,0 19:00 164489 J36038 Action PS, Take Oil Sample PAP 20757 22/12/2022

Action FUI ;
8 CM522 PS Montlhy 250 20:00 2,0 0,0 2,0 22:00 164490 Ordinary Action PS, Take Oil Sample PAP 20757 22/12/2022

PRODUCTION DEPT HEAD PLANT EXPERT COORDINATOR LIFE CYCLE EXPERT

TONYKO MATSU AGUS NOVI INDRIYANTO AHMAD KHOIRUL ANAS