You are on page 1of 6

This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N OL1—2G43—2390
SPEC.
A9AP
MATERIAL
CS
RATING
|15O lbs|
(mm)
3
(kg/cm²q)
9
(kg/cm²q)
3 65
(°C) (°C)
25 ‘
(kg/cm²q)
13.5 |
(°C)
N/A
NO
A2 ALL 100% 1 oz
PIECE SIZE
I __
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

K 628
3688 H
1644 1 Pipes (Length),ASME B36.10,ASTM A106 S—XS S—XS 51 CPPOAAUB 2 16752
814 Gr.B,BE,Seam|ess,51
6000
2 90' Elb LR,ASME B16.9,AS'IM A234 Gr.WPB,BW S—XS S—XS 51 CDB66GD6 2 5
'WFW@®@> I\ N)N‘lk)hI \7 3978
E 2 9978 Ends,Seom|ess,51
SUPPORT APSUPP—2CPRO2—O2911 2
SUPPORT APSUPP—2CPR02—O27742
SUPPORT APSUPP—2CPR02—027732
OlU’l~F~b| SUPPORT APSUPP—2CPR02—027722

CEINT. EIN
76 OPPRO2-EN-51981-O1
E 2177824
N 1573390
EL +1137s0
/ill!
PTSC-GJ-001
€IID--__
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,

. Q3
.
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

s ""‘76
,6)‘:/’ WELD SIZE WELD WELD
'¢ NO (IN) TYPE CAT
BW
BW
BW
Q BW
(U 0S5
\D WE F
BW
003M1 76 BW
l
<A> BW
[II] 63 BW
EL +113000 BW
76
® 01SPOO1
BW
@ WE F
BW
WE F
xeuk 4*”””/I//Ill.
Q1; 76 0S5
3A PTSC-GJ-001
5A
ow o o wo —o3 —o oN8

S037 2
o3Oo omwmm9+u»— mn mn mn mn
2
BW
BW
WE
F
F
flm mw m fl m w

APSUPP—2CPRO2—O2911
/ *9 ,6%1/ 008M1
0S5
3A
3A
003M1 2
008M1 2
BW
BW
F
F
STD
SBO4—C—U10-500-600
112970-90-100
PRF 1
wEo1—a-B-4o0—sTn-cs I
/-180 @ °°
(B) 76
<]J>1.4
|"'| I- + - n- 2034 1 @

76--—-—-3
11

1)‘; :
76
BOLT LIST
GD BOLT SIZE LENGTH
Phan Van Thai
Q§§UPP ECPROZ 02774 fig, APSUPP _ 2cPR02 _ 02772 No (IN) (MM)
WEO1—2—B—400—STD—CS <:::7 ST3G01_a_cS __ __ ——— 2022.12.21
/-1s0 , 13:44:14 +07'00'
PRF

1
6000 <:) VE01—2—B—400—STD—CS
/ 180 SUPPORT SYMBOLOGY
<F> SIIIEI COM STD or SPC support common
EEIII stag \\ 2 N to more than one line Y
APSUPP—2CPR02—02773
PRF PRF
e.g.: line support

1:1 E01 —2—B—4UO—STD—CS S STD or SPC support welded to pipe at


/ 180 01 \\\ MRS
workshop during pipe spools prefabrication
Z
X
STD \
\ STD or SPC support device covered
\ INPUT AND OUTPUT
1:lGO1—2—CS S037 by Material Requisition DATA FOR PIPELINE
/ For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
Refer to supp. dwgs collection DW-1360.00

UUUUU
INSULATION COORDINATES AS
cu NT. nu -------- STD IN THE DRAWING
EN— 51 981-01 DRG 02 NPD INS. INS. THK
(inch) TYPE (mm)
Standard Piping Support
E 2 17969 e ——— -- ——— Refer to supp. dwgs collections STC-1391.00 to STC-1398.00
N 1559496 2 NI .00
EL +1l2034
P§u%1(LsG'$'0/V, SB?E & C V TechnipFMC
REASON FOR MODIFICATION BY SUBCONTRACTOR: SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM
CUT AND REWELD DUE TO REPAIR MIS-ALIGNMENT. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Z1 SPOOL ID.

-@ WELD PACKAGE A1 - OLEFINS PLANT


1) ALL DIMENSIONS ARE IN MILLIMETERS
2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND )(GD FIELD WELD ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS TRACED ID 2CPRO2—EN—51 981 -01 l 10—2"—EN—519B1—A9AP—N|
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X
POINT ACCORDING TO CONSTRUCTION STRATEGY
SUPPORT CLIENT DWG
4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012 DOC NO
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION CLASS CLASS 2
Page Rev.
0S3
REV
27/ 08/ 2022
21/O8/2020
DATE
ISSUED AS-BUILT MARK UP
FOR CONSTRUCTION
DESCRIPTION
SG
PREP
SD
CHECK
MD
APPR. 11'!
0S4

REV
15 / 09 / 2022

DATE
AS-BUILT MARK UP

DESCRIPTION
111 PREP CHECK APPR.
0S5
REV
15 / 12 / 2022
DATE
AS-BUILT MARK UP
DESCRIPTION PREP
. CHECK APPR.
DRAWING
NO O36909C
Project
ZCPRO2 ISO
MTO Area Num. Doc.Type

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
EN
Service
51
Code
981
Sequence
01
Subline
of 0S5
01060
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N OL1—2G43—239O
SPEC.
AQAP
MATERIAL
cs
RATING
I150 1115' 3
(mm) (kg/cm²q)
9
(kg/cm²q)
3 as
(°C) (°C)
25 ‘ 13.5
(kg/cm²q)
I N/A
(°C) NO
ALL 100% 10%
PIECE SIZE
|_No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

K 1852
6000 H
1297 1 Pipes (Length),ASME B36.10,ASTM A106 S—XS S—XS 51 CPPOAAUB 2 16993
1844 Gr.B,BE,Seam|ess,51 17051
|"'\UOm> N)N‘lk)hI \7 6000
2 90' Elb LR,ASME B16.9,AS'IM A234 Gr.WPB,BW S—XS S—XS 51 CDB66GD6 2 4
B 2 7334 Ends,Seom|ess,51
C 2 1844
SUPPORT APSUPP—2CPRO2—O2821 2
D 2 6021
SUPPORT APSUPP—2CPR02—O28232
D 2 3965
E 2 1349 SUPPORT APSUPP—2CPR02—014-032
0S5 F 2 995 OlU’l~F~b| SUPPORT APSUPP—2CPR02—014002

CEINT. EIN
EN-51981-01 DRG 01
E 2179696
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,

N 1559496
EL +112034
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

0S5
13 WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

2' NS
APSUPP—2CPR02—02821 ' 5
WELD SIZE WELD WELD
STD NO (IN) TYPE CAT
x SB08—A—U12—500—/
U16 — — — —
x\ 110000-180 ‘"3 2 BW
\ srn O14 2
1 11001-2—cs O15 2
F
/‘Nil / w @ SO04 2
PRF 67’ /H ® O16 2
11 ® 1:! E01 -2-B-400—sTn-cs 76 ," SO05 2 F
180 “ O17 2
7e s10 '61“ O18 2
SPO —A1—1—3—HG O19 2
76 “ 109938
3 @ O20 2
S0062 F
'5 S0072 F
& \Q%
O21 2 "'|L!1U)(I /DC7"'l)U(/IUD!/)U
137
3A 015M1 2 BW F
3A 019M1 2 BW F
4525 1844 0S5
5A 048 2 BW F
5A 049 2 BW F
1852 0S5
511?’ 019M1 < C > 1.3
Q
<1J>
APSUPP—2CPR02—02823
1
<A> <19 srn
SB04—C—U16—800—15D0 @ < E > 1.5

0 10999e—1a0—300 E'- +108034 1'


srn 76 4»'1 (E9
76fi%
21/ @ '2?
79 SP03—B1—1—3—HG
111300
PRF
11 < E > 1.6 AP SUPP—2CPRO2—01403
STD
Phan Van Thai
2535 048 UGO 1—2—CS
WE01 —2—B—400—STD—CS 049 / 2022.12.21
/ 130 13 191’
PRF
015M1 49 13:44:58 +07'00'
76 <D> 1.4
V E01—2—B—400—STD—CS
49 / 180
0S5 5

131-1
EL +110030
76 <0 50
0 <0
30
25
(Q 4
BOLT LIST
E SUPP—2CPR02—01400
STD / 9'4/‘P % 5
BOLT SIZE LENGTH
wa01-2-cs
I G31 \ No
_ (IN)
_ (MM)
i
PRF 940 \
\
111 E01—2-B-4D0—STD—CS ‘\
/ 180 ‘

CEINT. EIN
EN 51981 01 DRG 03
E 2187145
N 1553344
EL +108034
COM

PRF

MRS
1
STD or SPC support common
to more than one line
e.g.: line support
SUPPORT SYMBOLOGY

STD or SPC support welded to pipe at


workshop during pipe spools prefabrication

STD or SPC support device covered


Z
Y

INPUT AND OUTPUT


X

by Material Requisition DATA FOR PIPELINE


For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
Refer to supp. dwgs collection DW-1360.00

UUUUU
INSULATION COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00
2 NI .00

P§u%1(LsG'$'0/V, SB?E & C V TechnipFMC


REASON FOR MODIFICATIONS BY SUBCONTRACTOR:
CUT AND REWELD DUE TO SHOP FABRICATION ERROR
ADD JOINT AS PER SITE CONDITIONS. SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM
Z1 SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
-0 WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS
2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND X6) FIELD WELD ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS TRACED ID 2CPRO2—EN—51 981 -01 l 10—2"—EN—51981—A9AP—N|
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X
POINT ACCORDING TO CONSTRUCTION STRATEGY
SUPPORT CLIENT DWG
4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012 DOC NO
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION CLASS CLASS 2
Page Rev.
0S3
REV
27/ 08/ 2022
21/O8/2020
DATE
ISSUED AS-BUILT MARK UP
FOR CONSTRUCTION
DESCRIPTION
SG
PREP
SD
CHECK
MD
APPR. 11'!
0S4

REV
15 / 09 / 2022

DATE
AS-BUILT MARK UP

DESCRIPTION
111 PREP CHECK APPR.
0S5
REV
15 / 12 / 2022
DATE
AS-BUILT MARK UP
DESCRIPTION PREP
. CHECK APPR.
DRAWING
NO 0369090
Project

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
ZCPRO2 ISO
MTO Area Num. Doc.Type
EN
Service
51
Code
981
Sequence
01
Subline
O2 of O6 0S5
O
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N OL1—2G43—2390
SPEC.
A9AP
MATERIAL
CS
RATING
|150 Ibs|
(mm)
3
(kg/cm²q)
9
(kg/cm²q)
3 65
(°C) (°C)
25 ‘
(kg/cm²q)
13.5 |
(°C)
N/A
NO
A2 ALL 100% 10%
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

K 6000
6000 H
6000 1 Pipes (Length).ASME B36.10.ASTM mos s-xs s-xs 51 CPPOAAUB 2 36000
6000 Gr.B,BE,SeamIess,51 35075
6000
SUPPORT APSUPP—2CPR02—01 394 2
'WFW@®@> I\ N)N‘lk)hI \7 6000
SUPPORT APSUPP—2CPR02—01 389 2
A 2 11884
SUPPORT APSUPP—2CPRO2—O1 407 2
B 2 11605
C 2 11586 SUPPORT APSUPP—2CPR02—014-04 2
SUPPORT APSUPP—2CPR02—01 385 2
SUPPORT APSUPP—2CPR02—01 396 2
SUPPORT APSUPP—2CPR02—O1 384 2
<oc \|o><.n4>u~ SUPPORT APSUPP—2CPR02—014-05 2

10 Grounding lug 2 1
APSUPP-BCPR02-01389
STD
cE|N"|'_ UN V601-2-CS
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,

1-:11-51981-01 0120 02 /
1-N: 2187145
1553344
PRFWEU1-2-B-400-STD-CS
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

1-:1. +108034 /718° WELD LIST


Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

\\ 98,3 WELD SIZE WELD WELD


NO (IN) TYPE CAT
\ ‘)- APSUPP—2CPR02—01407 S006 2 WE F
0S5 \ 8'
My
G
68> PRF
VE01-E-B-400-STD-CS
O22 2
S009 2
BW
WE F
10.1 4525
\ /-180 SO10 2 WE F
1 F4; 96 STD O23 2 BW
APSUPP—2CPR02—01404
01sP005 . % 5‘ 141501-2-08 STD
SO11 2 WE F
/ WGD1-2—CS
O24 2 BW
abs /
S012 2 WE F
025 2 BW
PRF
APSUPP—2CPR02—01394 VE01-8-B-400-STD—CS
SO13 2 WE F
STD 240 SO14 2 WE F
/—180
1:lG01—2—CS 656 O26 2 BW
/
PRF
<29 4260
S015
O27
2
2
WE
BW -"I(/L!7l/)(I"'(/71l!)-"I(/l )(l
F
HE01—2—B—900—STD—CS @ 356.9 APSUPP—2CPROE—01396
/-180 STD
STD ws01-2-cs
IIS01-2-150—CS /
/ eye PRF
<B) [E1 1 4500 wE01—2-B—400—sTn-cs
/-180
1'C) % @318

01SP006 @
2845
9s
® ‘ S)
APSUPP—2CPR02—01385 1680 APSUPP—2CPR02—01384
PRF 1 19 gs PRF ___ _ _
WE01 ———
/-180
STD
2 B 400 — STD - CS
<B>
i 9 111-:012B400sTncs
/-180
STD
w@01—2—¢s
/
@ 1'1,5 111001-2-cs
/
Phan Van Thai
APSUPP—2CPR02—01405 2022.12.21
STD 13:45:15 +07'00'
6&5 $1301-2-03

I1
4450
PRF BOLT LIST
89 wE01-2-8-40o—sTn—cs
"1 /-180 BOLT SIZE LENGTH
01sP007 Q3 No (IN) (MM)
< C > 1.3

8» % 980
CEINT. DN
EN—51981—01 DRG

1
E 2187145

2 ~11‘ N 1517344
EL +108034
SUPPORT SYMBOLOGY

0
COM STD or SPC support common
\ to more than one line Y
\
\ e.g.: line support
\ PRF
\
\
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition

UUUU
DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF

U
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00
2 NI .00

P§u%1(LsG'$'0/V, SB?E & C V TechnipFMC


REASON FOR MODIFICATION BY SUBCONTRACTOR: SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM
ADD GROUDING LUG AS PER TSI 0551 TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Z1 SPOOL ID.

-8 WELD PACKAGE A1 - OLEFINS PLANT


1) ALL DIMENSIONS ARE IN MILLIMETERS
2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND X6) FIELD WELD ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS TRACED ID 2CPR02—EN—51 981 -01 l 10—2"—EN—51981—A9AP—NI
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X
POINT ACCORDING TO CONSTRUCTION STRATEGY
SUPPORT CLIENT DWG
4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012 DOC NO
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION CLASS CLASS 2
Page Rev.
0S3
O
REV
27/ 08/ 2022
21/O8/2020
DATE
ISSUED AS-BUILT MARK UP
FOR CONSTRUCTION
DESCRIPTION
SG
PREP
SD
CHECK
MD
APPR. 11'!
0S4

REV
15 / 09 / 2022

DATE
AS-BUILT MARK UP

DESCRIPTION
111
PREP CHECK APPR.
0S5
REV
15 / 12 / 2022
DATE
AS-BUILT MARK UP
DESCRIPTION PREP
. CHECK APPR.
DRAWING
NO

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
0369090
Project
ZCPRO2 ISO
MTO Area Num. Doc.Type
EN
Service
51
Code
981
Sequence
01
Subline
0S5
03 of O60
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
NK OL1—2G43—2390
SPEC.
AQAP
MATERIAL
CS
RATING
|150 Ibs|
(mm)
3
(kg/cm²q)
9
(kg/cm²q)
3 65
(°C) (°C)
25 1
(kg/cm²q)
13.5 |
(°C)
N/A
NO
A2 ALL 100% 10%
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)
6000
6000 H
6000 1 Pipes (Length).ASME B36.10.ASTM mos s-xs s-xs 51 CPPOAAUB 2 36000
6000 Gr.B,BE,SeamIess,51 46145
6000
SUPPORT APSUPP—20PR02—01 388 2
'WFW@®@> I\ N)N‘lk)hI \7 6000
SUPPORT APSUPP—2CPR02—01 392 2
A 2 11595 SUPPORT APSUPP—2CPRO2—O1 383 2
B 2 11590
SUPPORT APSUPP—2CPR02—01 402 2
C 2 11575
D 2 11385 SUPPORT APSUPP—2CPR02—01 380 2
SUPPORT APSUPP—2CPR02—01 381 2
SUPPORT APSUPP—2CPR02—O1 387 2
<oc \|o><.n4>u~ SUPPORT APSUPP—2CPR02—01 395 2
CEINT. EIN
EN-51981-01 DRG 03
E 2187145
N 1517344
EL +108034
APSUPP-2CPR02—01388
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,

PRF
“E°1‘3‘B‘4°°‘3TD‘C$ APSUPP—2CPR02—01392
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

/-180 STD
WELD LIST
e3,43525
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

\\\ W1/ /11001-2-cs


WG01-2-CS WELD SIZE WELD WELD
PRF NO (IN) TYPE CAT
\\
.\ G686 WE01—2—B—400—STD—CS S016 2 WE F
/-180 O28 2 BW
S017 2 WE F
4500 SO18 2 WE F
APSUPP-2CPR02-01383 029 2 BW
Cqj
PRF S019 2 WE F
969 111-:01-2-13-400-811:-cs 030 2 BW
® % /-180 S020 2 WE F
01SP008 3570 STD
031 2 BW
“>5 905 111301-2-08 S021 2 WE F
/ S022 2 WE F
6 032 2 BW
S6 4500 <B> S023 2 WE
81 , 1 91
5, APSUPP—2CPR02—01402
srn
033 2 BW -"I(/L!7l/)(I"'(/71l!)-"I(/l )(l

w501-2-cs
\ 81 / S7.
029 O6 PRF APSUPP—2CPR02—01381
4500 VE01—2—B—400—STD—CS STD
/— 80 WG01-2-CS
6% 8%: 1 /
FCJ PRF

01SP009 1
5 \
96$1685
6
VE01-2-8-400—STD—CS
/-180
V 2820
@111 0; 859 PRF
<B> HE01—2—B—400—STD—CS
/-180
.. STD
DUI 11:»SUPP—2CPRO2—01380 15015-53
PRF 41>‘?
WE01-2-B-400-STD-CS
/-180
STD APSUPP—2CPR02—01395
111301-2-cs STD
/ 01SP010
8» 4280
as
11lG01—2—CS
/
PRF BOLT
No
BOLT LIST
SIZE
(IN)
LENGTH
(MM)
-94 215 11lE01—2—B—400—STD—CS
<C> /-180
91Os
4» 4500

wig] ®
033

<D>
<F>
<0
\
\
\
\
\
\
COM

PRF

MRS
1
STD or SPC support common
to more than one line
e.g.: line support
SUPPORT SYMBOLOGY

STD or SPC support welded to pipe at


workshop during pipe spools prefabrication

STD or SPC support device covered


Z
Y

INPUT AND OUTPUT


X

CEINT. IIIN by Material Requisition

UUUU
2‘NS DATA FOR PIPELINE
EN-51981-01 DRG 05 For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
E 2187145 Special Piping Support ARE BASED ON
N 1481344 S- SYSTEM OF

U
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
EL +108034 STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00
2 NI .00

P§u%1(LsG'$'0/V, SB?E & C V TechnipFMC


SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM
Z1 SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
-8 WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS
2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND X6) FIELD WELD ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS TRACED ID ZCPR02-EN-51 981 -01 1 10-2"-EN—51981—A9AP—NI
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X
POINT ACCORDING TO CONSTRUCTION STRATEGY
SUPPORT CLIENT DWG
4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012 DOC NO
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION CLASS CLASS 2
Page Rev.
0S3
REV
27/ 08/ 2022
21/O8/2020
DATE
ISSUED AS-BUILT MARK UP
FOR CONSTRUCTION
DESCRIPTION
SG
PREP
SD
CHECK
MD
APPR. 111
0S4

REV
15 / 09 / 2022

DATE
AS-BUILT MARK UP

DESCRIPTION
111PREP CHECK APPR.
0S5
REV
15 / 12 / 2022
DATE
AS-BUILT MARK UP
DESCRIPTION PREP
. CHECK APPR.
DRAWING
NO

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
0369090
Project
ZCPR02 ISO
MTO Area Num. Doc.Type
EN
Service
51
Code
981
Sequence
01
Subline
04 of 06 0S5
O
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N OL1—2G43—2390
SPEC.
A9AP
MATERIAL
CS
RATING
|150 Ibs|
(mm)
3
(kg/cm²q)
9
(kg/cm²q)
3 65
(°C) (°C)
25 1
(kg/cm²q)
13.5 |
(°C)
N/A
NO
A2 ALL 100% 10%
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

K 6000
6000 H
6000 1 Pipes (Length).ASME B36.10.ASTM A106 S—XS S—XS 51 CPPOAAUB 2 36000
6000 Gr.B,BE,SeamIess,51 34740
6000
SUPPORT APSUPP—2CPR02—01 391 2
'WFW@®@> I\ N)N‘lk)hI \7 6000
SUPPORT APSUPP—2CPR02—01 401 2
A 2 11585
SUPPORT APSUPP—2CPR02—01 390 2
B 2 11570
C 2 11585 SUPPORT APSUPP—2CPR02—01 382 2
SUPPORT APSUPP—2CPR02—01 386 2
SUPPORT APSUPP—2CPR02—01 393 2
SUPPORT APSUPP—2CPR02—01 379 2
<oc \|o><.n4>u~ SUPPORT APSUPP—2CPR02—01 398 2

cum. 1:111
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,

EN-51981-01 nae 04 APSUPP—2CPR02—01391


PRF SGII
E 2187145
N 1481344 VEO1—2—B—400—STD—CS §$§UPP‘?CPR°2‘°14°1
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

4500
EL +108034 Eb STD/-180 8001 _ 2 _ cs WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

‘\\ 11 I1IG01-2-CS WELD SIZE WELD WELD


\\ \ / PRF NO (IN) TYPE CAT
VE01-2-B-400-STD-CS S024 2 WE F
,~ \ 6,686 /-180 O34 2 BW
4510
S025 2 WE F
SO26 2 WE F
APSUPP-ECPRO2-01390 O35 2 BW
U” C: 63, PRF S027 2 WE F
wEo1-2-B-400-srn-cs 036 2 BW
2375 /-180 AP SUPP—2CPR02—01382 S028 2 WE F
STD 037 2 BW
013F011 <3) 4230 2100 w001-2-cs PR5E01—2—B—500—STD—CS S029 2 WE F
/ /-180
1 686 STD
IIG01-2—CS
S030 2
038 2
WE
BW
F

(ED 0S5 4510 / S031 2


039 2
WE
BW -"I(/L!7l/)(I"'(/71l!)-"I(/l )(l
539 SEIII 87.1
@ 9 Qg§UPP-BCPROE-01386 APSUPP—2CPR02—01393
035 STD
I1IE01-2-B-500-STD—CS 1,1501-3-[jg
570? /-180 /
4525 3TB PRF
r V601-E-08 wE01-2-B—500—sTn-cs
0) A33 / /— 1 80
Q "1
<B> G 450 APSUPP—2CPR02—01379
@ 656 PRF
01SP012 VE01—2—B—500—STD—CS
4020 /-180
<A> -\S’ STD
C3 694 VG01—2—CS Phan Van Thai
/
2022.12.21
*1150 13:45:28 +07'00'
SEII
APSUPP—2CPR02—01398
037 6'56 STD
3100 WG01—2—CS
/ BOLT LIST
Q
ma
-9
81¢ 1425
PRF
wE01 2 -8-500-STD—CS
IL’
01SP013
<B>
F5)

S
/-130

4500
BOLT
No
SIZE
(IN)
LENGTH
(MM)

CEINT. EIN

1
7/‘ EN—51981—01 DRG
88 E 2187145 SUPPORT SYMBOLOGY
UV‘?J4iE’ N 1445344
039 EL +108034 COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
<C> workshop during pipe spools prefabrication X
Z
CEEI MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition

UUUU
DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF

U
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00
2 NI .00

P§u%1(LsG'$'0/V, SB?E & C V TechnipFMC


REASON FOR MODIFICATION BY SUBCONTRACTOR:
REMOVE JOINT 034 AS PER ACTUAL SITE SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM
Z1 SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
-8 WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS
2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND )(GD FIELD WELD ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS TRACED ID ZCPR02-EN-51981-01 1 10-2"-EN—51981—A9AP—NI
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X
POINT ACCORDING TO CONSTRUCTION STRATEGY
SUPPORT CLIENT DWG
4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012 DOC NO
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION CLASS CLASS 2
Page Rev.
0S3
O
REV
27/ 08/ 2022
21/O8/2020
DATE
ISSUED AS-BUILT MARK UP
FOR CONSTRUCTION
DESCRIPTION
SG
PREP
SD
CHECK
MD
APPR. 111
0S4

REV
15 / 09 / 2022

DATE
AS-BUILT MARK UP

DESCRIPTION
111PREP CHECK APPR.
0S5
REV
15 / 12 / 2022
DATE
AS-BUILT MARK UP
DESCRIPTION PREP
. CHECK APPR.
DRAWING
NO

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
0369090
Project
ZCPR02 ISO
MTO Area Num. Doc.Type
EN
Service
51
Code
981
Sequence
01
Subline
0S5
05 of 060
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N OL1—2G43—2390
SPEC.
A9AP
MATERIAL
CS
RATING
|150 Ibs|
(mm)
3
(kg/cm²q)
9
(kg/cm²q)
3 65
(°C)
25
(°C)
1
(kg/cm²q)
13.5 |
(°C)
N/A A2
NO
ALL 100% 10%
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

K 6000
6000 H
6000 1 Pipes (Length),ASME B36.10,ASTM A106 S—XS S—XS 51 CPPOAAUB 2 23915
3067 Gr.B,BE,SeamIess,51 15897
|"'\UOm> N)N‘lk)hI \7 2848
2 90' Elb LR,ASME B16.9,AS'IM A234 Gr.WPB,BW S—XS S—XS 51 CDB66GD6 2 2
A 2 3885 Ends,SeomIess,51
CIIINT. IIIN B 2 9164 SUPPORT APSUPP—2CPR02—01 408 2
EN—51981—01 DRG 05 C 2 2848 SUPPORT APSUPP—2CPR02—01 399 2
E 2187145
N 1445344
Sill SUPPORT APSUPP—2CPR02—01 406 2
EL +108034
APSUPP—2CPR02—01408 SUPPORT APSUPP—2CPR02—01 397 2
PRF
\\\ 4500 VE01—2—B—500—STD—CS \|mU'|-z-01 SUPPORT APSUPP—2CPR02—01 378 2
\\ /-180
:1 Q STD 8 Grounding lug 2 1
‘ e 59¢ ws01-2-cs Sill
My / APSUPP—2CPRO2—O1399
STD
WG01—2—CS
/
as3
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,

F4) 6 PRF
WE01—2—B—60D—STD—CS
4480 /-180
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

01SPD14 @ %
WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

G es, WELD SIZE WELD WELD


IHEEUEEIEEEEIEIUIIOEI NO (IN) TYPE CAT
PRF
1180 HE01—2—B—600—STD—CS S032 2 WE F
/-180 O40 2 BW
Cg) 11$? 3330 STD S033 2 WE F
w001-2-cs SO34 2 WE F
/ O41 2 BW
S0352 WE F
555 SBID 042 2 BW
F8) APSUPP—2CPR02—01397 S0362 WE F
<:::7 685 STD 043 2 BW
VG01—2—CS 044 2 BW
047 3940 / O45 2 BW
PRF 046 2 BW "'1 /)-"1(/DC/71l!)-"I(/l )(I
<3) G591 WE01—2—B—600—STD—CS
5A 047 2 BW F
/-180
<C> 1B LUG001 2 UD F
eqk APSUPP—2CPR02—0 1 378
FZU
PRF 0S5
3900 VE01—2—B—600—STD—CS
/-180
01SP015 ® 5.91 31'];
8 VG01—2—CS
600 /
<B>
77
@ ‘-0) >91

8.1
LUG001 <0 E]
Phan Van Thai
2022.12.21
Bui Van Hoi

0S5
7s-——————-L///
1
<0 1/ 2022.12.22
13:45:41 +07'00' 09:11:54 +07'00'

1
1I

01SP016 BOLT LIST


BOLT SIZE LENGTH
No (IN) (MM)

<A>

[II]
EL +105D34
2848

11
III!
<E>
COM

PRF

MRS
1
STD or SPC support common
to more than one line
e.g.: line support
SUPPORT SYMBOLOGY

STD or SPC support welded to pipe at


workshop during pipe spools prefabrication

STD or SPC support device covered


Z
Y

INPUT AND OUTPUT


X

by Material Requisition
/4IED

UUUU
M DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01
75-—————~» SPC EFFORT ANALYSIS
ARE BASED ON
II
._55.1% S-
Special Piping Support
SYSTEM OF

U
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00
76 2 NI .00
CEINT. EIN
2CPR01—EN—51981—01
E 2187145
N 1424124
P§u%1(LsG'$'0/V, SB?E & C V TechnipFMC
EL +105034

REASON FOR MODIFICATION BY SUBCONTRACTOR: SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


ADD GROUDING LUG AS PER TSI 0551 TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Z1 SPOOL ID.

-8 WELD PACKAGE A1 - OLEFINS PLANT


1) ALL DIMENSIONS ARE IN MILLIMETERS
2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND )(GD FIELD WELD ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS TRACED ID ZCPR02-EN-51981-01 1 10-2"-EN—51981—A9AP—NI
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X
POINT ACCORDING TO CONSTRUCTION STRATEGY
SUPPORT CLIENT DWG
4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012 DOC NO
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION CLASS CLASS 2
Page Rev.
0S3 27/ 08/ 2022
21/O8/2020 ISSUED AS-BUILT MARK UP
FOR CONSTRUCTION 0S4 15 / 09 / 2022 AS-BUILT MARK UP 0S5 15 / 12 / 2022 AS-BUILT MARK UP DRAWING
NO 0369090 ZCPR02 ISO EN 51 981 01 0S5
06 of 060
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP
I CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia

You might also like