Professional Documents
Culture Documents
II. OBJECTIVE
To cleanse the PPE balances in the financial statement and submit within the
month of July below reports to COA in compliance with COA Circular No. 2020-006
dated January 31, 2020:
i. Inventory Count Form (Annex A)
ii. List of PPEs Found at Station (Annex B) (Completeness)
iii. List of Non-Existing/Missing PPEs (Annex C) (Existence)
iv. Registry of Derecognized PPEs (Annex D)
v. Journal Entries Vouchers
III. COMMITTEE
Special Order No. 01-10-2022 created the inventory committee for the
conduct of PPE cleansing in EMB-X Regional and PEMU office and composed of the
following personnel:
Samih M. Alonto - Head, Inventory Committee
Ruelan Ruben M. Lacre, Jr. - Reconciler
Fatmah Nhehar L. Daluma - Count Validator
Rothelio M. Orgada - Tracer
Jeffrey P. Ceballos - Inventory Count and Tagger
Norman Elcano - Inventory Count and Tagger
Donna Jane T. Lim* - Inventory Count and Tagger
Mohamad Iman B. Alib** - Inventory Count and Tagger
*Replaced Seigfred G. Balta
02/28/22 – 03/02/22 Hostel 2nd Floor Hostel 1st and 3rd Floor
V. BUDGETARY ESTIMATES
ACTIVITY MANDAYS EXPENSES QTY UNIT COST TOTAL COST
Team 1: Team 2:
1. Donna Jane T. Lim (Finance) 1. Mohamad B. Alib (Finance)
2. Jeffrey M. Ceballos (Admin) 2. Norman M. Elcano (Admin)
3. Nershel T. Mora (COA) 3. Arlene B. Sadicon (COA)
Reconciliation
1. Ruelan Ruben M. Lacre, Jr. (Finance)
2. Fatmah Nhehar L. Daluma (Admin)
3. Donna Jane T. Lim (Accounting)
4. Nershel T. Mora (COA)
Due to inevitable circumstances, additional one manpower from finance were
made to create two (2) teams.
VI. OUTPUT
The committee shall adopt the format as prescribed under COA Circular 2020-006
dated January 31, 2021 and the Government Accounting Manual Volume III, but shall make
an amendment to the signatories.
Below will be the list of reports to be submitted on March 3, 2022 with the names of
the accountable persons:
Accountable Person
REPORTS Format
Designation Name
Report on the Physical Count of Appendix GSS Chief Fatmah Nhehar L.
Property, Plant & Equipment 73 Daluma
Report of Physical Count of Appendix GSS Chief Fatmah Nhehar L.
Inventory 66 Daluma
Property Acknowledgement Appendix Property Rothelio M. Orgada
Receipt 71 Custodian
Inventory and Inspection Report Appendix Inventory Samih M. Alonto
of Unserviceable Property 74 Committee
Report of Lost, Stolen, Appendix Inventory Samih M. Alonto
Damaged, Destroyed Property 75 Committee
Property Transfer Report Appendix GSS Chief Fatmah Nhehar L.
76 Daluma
Reconciliation Report Accountant Ruelan Ruben M. Lacre,
Jr.
SAMIH A. ALONTO, JD
Inventory Committee, Head and
Administrative Section, Chief
Noted by:
Availability of Fund:
AGAKHAN M. CABUGATAN
FAD Assistant Division Chief
Approved by:
REYNALDO S. DIGAMO
Regional Director
Pursuant to COA Circular 2020-006 dated January 31, 2020, this plan is
hereby prepared to ensure the efficient conduct of Physical Inventory Taking for
purposes of Recognition of all PPEs found at the regional Office (including PEMU
Offices) and Disposition of Non-Existing/Missing PPE items.
I. Preliminary Activities
The Inventory Committee through the General Services and Supplies (GSS)
Unit, must undertake the following activities:
a. Initiate coordination meetings with the Accounting Unit in sorting out issues on
record discrepancy;
b. Provide Property Tag in conformity with the data requirements indicated in the
Circular for approval of Inventory Committee.
c.4 Copy and Soft copy of data list of Inventory and Inspection Report of
Unserviceable Properties (IIRUP) to verify items that have already
been disposed.
c.5 Copy and Softcopy of data list of items transferred to various
employees through Property Transfer Report
c.6 Segregation of Property Acknowledgment Receipt (PAR) per
employee.
c.7 Preparation of initial list of items for disposal
c.8 Printing of Properties per Office
a. List of PPE Items which are recorded in the PPELCs but NOT included in the
RPCPPE / Asset Registry / Physical inventory Report
b. PPE Items which are included in the RPCPPE but not recorded in the
PPELCs
After the completion of reconciliation between the GSS Unit and the Accounting
Unit, the following reports are required to be submitted to the Inventory
ROLES RESPONSIBILITIES
Counter and Tagger Responsible for laying the final tag based on
the report submitted by the Counter and
1. Ceballos, Jeffrey P. Checker and prepared Property Tags
2. Norman Elcano (Stickers)
3. Seigfred Balta
Countercheck the Inventory Working Paper
based on the number of PPEs, semi-
Reconciler expendable equipment, and those “found at
station” as declared by the Validator and
Lacre, Ruelan Ruben Jr. Checker
WITNESS:
a. The GSS Unit will provide the Inventory Working Paper to Inventory
Committee. The approved Working paper shall be forwarded to the
Inventory Team.
b. Prior to the start of physical inventory, an orientation will be facilitated by
the Supply Officer on various classifications of PPEs and other issued that
may arise during the Inventory Taking.
c. Assigned Checkers and Counters will take the 1 st step on the actual
undertaking, followed by Taggers and Validators taking the last step.
d. All items considered as “Found at the Station” will be appraised and shall
be submitted to the Accounting Unit for recognition as fixed asset if
appraised value is P15,000 above. A PAR will be issued accordingly to the
Accountable Officer. Otherwise, an OCS will be issued to monitor the
accountability.
e. Items not found during the conduct of Physical Inventory Taking BUT was
included in the Inventory Working paper will be checked based on PAR
and ICS on file.
f. All missing items without proof of accountability shall be submitted to the
Inventory Committee for endorsement to COA for derecognition.
BUILDING SCHEDULE
The said report will now be the basis for the Accounting Unit to update its
Property, Plant and Equipment Ledger Card (PPELC) and will serve as the
beginning balance.
Property, Plant and Equipment (PPE) generally constitute a significant portion of the
total assets of the government, usually comprising more than fifty percent (50%) thereof. In
compliance with section 5.2 of the Commission on Audit (COA) Circular Number 2020-006
dated January 31, 2020, “Guidelines or the Procedures in the Conduct of Physical Count of
Property, Plant and Equipment (PPE), Recognition of PPE items Found at the Station and
Disposition for Non-Existing / Missing items for the One Time Cleansing of PPE Account
Balances of government Agencies”, the inventory committee for the Regional and PEMU
Office is hereby made and shall be composed of the following personnel:
All members of the Inventory Committee shall prioritize the inventory count but shall
ensure that the operation of the agency will not be hampered.
This Order shall be effective immediately and shall be automatically revoked after the
end of the inventory.
REYNALDO S. DIGAMO
Regional Director