You are on page 1of 1

PRODUCTION FOR MONTH OF NOVEMBER 2022

Water Sources Rate of Discharge (LPS) Power/Kwh used Production (cu.m.)


SPRING
Cabigaan 1.5LPS Gravity 7,776.00
Patong 20LPS Gravity 12,960.00
Kadaop 30LPS 15810 50,473.00
Togawe 1-2LPS 1213 484.96
71,693.96
DEEP WELL
Ariman 0 -
Bagacay-contod 1635 724.63
Beriran 1469 587.31
Cabigaan 870 401.42
Cabiguhan 939.54 386.53
Carriedo 967 386.61
Cogon 2120 670.98
Jupi 667.5 266.87
Nazareno 1162 464.57
Paco1 1 to 2 LPS 1248 498.95
Paco2 1195 654.14
Patag 798 401.55
Payawin 1771 708.05
Rizal-Bongsaran 1006 406.73
Sta Ana-apgo 1601 640.08
Sta Ana - Banyo 929 371.41
Tiris1 - taas 1078 548.49
Tiris2 - baba 1196 478.16
Villareal 1329 668.75
9,265.22
PURCHASED WATER AT CASIGURAN WD FROM OROK SPRING
CWD 3" pipe 10LPS Gravity 21,033.00
CWD 4" pipe 10LPS Gravity 14,518.00
CWD 8" pipe 30LPS Gravity 32,036.00
67,587.00
Summary
Total Gravity Production 20,736.00
Total Pumping Production 60,223.17
Total Purchased Water 67,587.00
Total Production 148,546.17
Total billed for the month 112,573.00
Non Revenue Water % 24%

You might also like