PROYEK PEMBANGUNAN BENDUNGAN MBAY ( Paket 1 )

RESUME PENGUJIAN MATERIAL ZONA INTI ( 1 )

Lokasi Zona inti ( 1 )


Barat Gudang
Borrow Area
Handak
Agent By Sodium
Prope

Natural Water Content % 48,46


Density on OMC rties

Berat Jenis ( Specific Gravity ) g/cm³ 2,456


Wet Density ɣ Wet g/cm³ 1,570
95% Max Dry

Dry Density ɣ Dry g/cm³ 1,173


Void Rasio e 1,093
Saturated Density ɣ Sat g/cm³ 1,696
Submerged Density ɣ Sub g/cm³ 0,696
Degrees of Saturation Sro % 75,93
Gravel % 0,00
Proportion

Sand % 12,17
Grain Size analysis

Silt % 23,89
Clay 63,94
Maximum Diameter mm 4,75
60% mm 0,005
10% mm
Uniformity Coefficient
Dispersive %
Passing #200 % 87,83
Liquid Limit LL % 63,55
Consistency

Plastic Limit PL % 35,72


Plastic Index PI % 27,83
Flow Index 37,44
Unified Claasification MH
Shrinkage Limit % 12,38
Opt. Moisture Content (OMC ) % 33,80
Compaction
Max Dry Density g/cm³ 1,235
Permeability ( Passing 4.75 mm ) K cm/sec
Comp. Strenght qu kg/cm2
Compressive
Strenght
Uniaxial

Modulus Axial Ea kg/cm2


Elasticity Diametral Ed kg/cm2
Poission's Ratio -
Axial Strain %
Cohesion C kg/cm2
Direct Shear
Internal Frction angle ϕ
Cohesion C kg/cm2
UU
Compression

Internal Frction angle ϕ


Triaxial

Cohesion C kg/cm2
Total
Internal Frction angle ϕ
CU

Cohesion C kg/cm2
Efective
Internal Frction angle ϕ
Intial void ratio eo
Consolidation

Preconsolidation load po kg/cm2


Compression index Cc
Coef. of Consolidation Cv kg/cm2
Coef. of vol.comp.mv cm/sec
Coef. of Permeability K
Slake Durability Index Id2
Sluke Durability
Classification
Pinhole Grade
Crummb Tes Grade Grade 1

Di Setujui Oleh : Di Periksa Oleh : Di buat Oleh :


Pengawas Lapangan Konsultan Supervisi Kontraktor
Proyek Bendungan Mbay Paket 1 IK-RSN-SBN, KSO WASKITA - BUMI INDAH, KSO

aaaaaaaaaaaaaaaaaaa
Tofan Zaelani
TA. Material Timbunan Quality Control
PROYEK PEMBANGUNAN BENDUNGAN MBAY ( Paket 1 )
PENGUJIAN NATURAL KADAR AIR
( ASTM D-2216 )

Lokasi : Barat gudang handak


Material : Zona inti Tanggal Pengujian : 05 Juli 2022
(1) Tempat / cawan No 1 2 3
(2) Berat cawan + Tanah basah WW Gr 556,60 597,50 507,60
(3) Berat cawan + Tanah kering DW Gr 404,20 429,60 369,90
(4) Berat air (2) - (3) Ww Gr 152,40 167,90 137,70
(5) Berat cawan TW Gr 86,70 85,30 86,60
(6) Berat tanah kering (3) - (5) Ws Gr 317,50 344,30 283,30
(7) Kadar air (4)/(6)*100 WC % 48,00 48,77 48,61
(8) Rata - Rata % 48,46

Lokasi : #REF!
Material : Tanah Pilihan Tanggal Pengujian
(1) Tempat / cawan No 1 1
(2) Berat cawan + Tanah basah WW Gr 805,00 900,00
(3) Berat cawan + Tanah kering DW Gr 720,00 805,00
(4) Berat air (2) - (3) Ww Gr 152,40 95,00
(5) Berat cawan TW Gr 254,00 254,00
(6) Berat tanah kering (3) - (5) Ws Gr 466,00 551,00
(7) Kadar air (4)/(6)*100 WC % 32,70 17,24
(8) Rata - Rata % 24,97

Lokasi : #REF!
Material : Tanah Pilihan Tanggal Pengujian :
(1) Tempat / cawan No 1 1
(2) Berat cawan + Tanah basah WW Gr 805,00 900,00
(3) Berat cawan + Tanah kering DW Gr 720,00 805,00
(4) Berat air (2) - (3) Ww Gr 152,40 95,00
(5) Berat cawan TW Gr 254,00 254,00
(6) Berat tanah kering (3) - (5) Ws Gr 466,00 551,00
(7) Kadar air (4)/(6)*100 WC % 32,70 17,24
(8) Rata - Rata % 24,97

WC = Ww / Ws x 100 %

Di Setujui Oleh : Di Periksa Oleh : Di buat Oleh :


Pengawas Lapangan Konsultan Supervisi Kontraktor
Proyek Bendungan Mbay Paket 1 IK-RSN-SBN, KSO WASKITA - BUMI INDAH, KSO

aaaaaaaaaaaaaaaaaaa Tofan Zaelani


Quality Control
TA. Material Timbunan
PROYEK PEMBANGUNAN BENDUNGAN MBAY ( Paket 1 )
PENGUJIAN BERAT JENIS ( Spesific Gravity Test )
( ASTM D 854-00 )

Lokasi Barat gudang handak Barat gudang handak


Material Zona inti Zona inti Tanggal Pengujian : 07 Juli 2022

1 Nomor Piknometer gram 1 2 3

2 Berat Piknometer gram a 48,9 56,6 62,2

3 Massa Piknometer + Sample kering gram c 98,9 108,9 114,7

4 Berat Tanah gram Wt


c -=aW2 - W1 50,0 52,3 52,5
5 Berat Piknometer + Sample + Air gram d 187,9 194,0 196,9
6 Berat Piknometer + Air gram b 158,10 163,20 165,70
7 Temperatur suhu b °C T1 22 22 22

8 Temperatur suhu d °C T2 22 22 22

9 Faktor Koreksi suhu ( T1 ) 1,0007 1,0007 1,0007

10 Faktor Koreksi suhu ( T2 ) 1,0007 1,0007 1,0007

11 Berat Jenis 4 / (( 6 - 2 ) X 9 )-(( 5 - 3 ) X 10)) 2,474 2,431 2,463

Rata - rata 2,456

T° C koreksi
18 1,0016
19 1,0014
20 1,0012
21 1,0010
22 1,0007
23 1,0005
c-a
24 1,0003
Gs =
( b - a ). T1 - ( d - c ).T2
25 1
26 0,9997
27 0,9995
28 0,9992
29 0,9989
30 0,9986
31 0,9983

Di Setujui Oleh : Di Periksa Oleh : Di buat Oleh :


Pengawas Lapangan Konsultan Supervisi Kontraktor
Proyek Bendungan Mbay Paket 1 IK-RSN-SBN, KSO WASKITA - BUMI INDAH, KSO

aaaaaaaaaaaaaaaaaaa
Tofan Zaelani
TA. Material Timbunan Quality Control
PROYEK PEMBANGUNAN BENDUNGAN MBAY ( Paket 1 )
Pengujian Kepadatan kering Laboratorium ( Compaction Test ) standard Proctor
( ASTM D 698-00a )

Lokasi : Barat gudang handak Spesific Gravity ( Gs ) 2,456 00 Januari 1900

Material : Zona inti Mould Weight ( g ) 4070 Inside Diameter ( cm ) 10 Capasity ( cm ³ ) 939,70
1,300
Tanggal Pengujian : 13 Juli 2022 Rammer Weight ( kg ) 2500 Height of drop ( cm ) 30 Blows Per Layer 25
Number of Layer 3 1,290

1,280
A SAMPLE No. 1 2 3 4 5 6

B MOULD No.
1,270
C WEIGHT OF MOULD + WET SAMPLE 5521 5569 5608 5638 5655 5640

D WEIGHT OF MOULD 4070 4070 4070 4070 4070 4070 1,260

E WEIGHT OF WET SAMPLE (C-D) 1451 1499 1538 1568 1585 1570
1,250
F VOLUME OF SAMPLE 939,70 939,70 939,70 939,70 939,70 939,70
MDD 1,235 g/cm3

DRY DENSITY gram/cm3


G WET DENSITY E 1,544 1,595 1,637 1,669 1,687 1,671 1,240
F
H MOISTURE CONTENT Q 28,15 30,52 32,57 35,79 38,46 40,01
1,230
DRY DENSITY G x 100 1,205 1,222 1,235 1,229 1,218 1,193
I
100 + H
1,220

1,210

MOISTURE CONTENT 1,200

OMC 33,800 %
J CONTAINER No. 1 2 3 4 5 6
1,190
K WEIGHT OF CONTAINER + WET SAMPLE 368 399,6 429,3 477,4 450,9 833,3

L WEIGHT OF CONTAINER + DRY SAMPLE 306,2 326,1 345,1 373,9 348,9 666,8
1,180
M WEIGHT OF CONTAINER 86,7 85,3 86,6 84,7 83,7 250,7

N WEIGHT OF WATER (K-L) 61,8 73,5 84,2 103,5 102 166,5 1,170

O WEIGHT OF DRY SAMPLE (L-M) 219,5 240,8 258,5 289,2 265,2 416,1
1,160
P N x 100 28,15 30,52 32,57 35,79 38,46 40,01
MOISTURE CONTENT
O
1,150
R ZAV ( ZERO AIR VOID ) 1,452 1,404 1,364 1,307 1,263 1,239
27,00 29,00 31,00 33,00 35,00 37,00 39,00 41,00 43,00

- ʏ Dry Max : 1,235 Gr/cm3 Moisture Content %


OMC : 33,80 %
Di Setujui Oleh : Di Periksa Oleh : Di buat Oleh :
Pengawas Lapangan Konsultan Supervisi Kontraktor
Proyek Bendungan Mbay Paket IK-RSN-SBN, KSO WASKITA - BUMI INDAH, KSO
1

aaaaaaaaaaaaaaaaaaa Tofan Zaelani


Quality Control
TA. Material Timbunan
PROYEK PEMBANGUNAN BENDUNGAN MBAY ( Paket 1 )
PENGAMATAN DAN PERHITUNGAN BATAS CAIR DAN BATAS PLASTIS
(LIQUID AND PLASTIC LIMIT TEST)
( ASTM D 4318-00 )
Lokasi : Barat gudang handak
Material : Zona inti Tanggal Pengujian : 08 Juli 2022

LIQUID LIMIT / BATAS CAIR : PLASTIC LIMIT / BATAS PLASTIS :


Penentuan No. Penentuan No.
(1) Jumlah ketukan 16 21 27 33 38 (1) Tempat / cawan No 2C 1A 4C
(2) Tempat / cawan No 3A 5C 2B 3C 1C (2) Berat cawan + Tanah basah Gr 25,30 26,40 27,80
(3) Berat cawan + Tanah basah Gr 49,10 35,30 48,30 40,20 37,30 (3) Berat cawan + Tanah kering Gr 21,80 22,00 23,50
(4) Berat cawan + Tanah kering Gr 33,60 25,50 33,90 29,60 27,90 (4) Berat air (2) - (3) Gr 3,50 4,40 4,30
(5) Berat air (3) - (4) Gr 15,50 9,80 14,40 10,60 9,40 (5) Berat cawan Gr 10,90 11,10 11,10
(6) Berat cawan Gr 11,00 10,90 11,10 11,00 10,90 (6) Berat tanah kering (3) - (5) Gr 10,90 10,90 12,40
(7) Berat tanah kering (4) - (6) Gr 22,60 14,60 22,80 18,60 17,00 (7) Kadar air (4)/(6)*100 % 32,11 40,37 34,68
(8) Kadar air (5)/(7)*100 % 68,58 67,12 63,16 56,99 55,29 (8) Batas Plastis rata-rata % 35,72
68,58 67,12 63,16 56,99 55,29

Grafik Batas Cair Catatan :


80
75 y = -0,6592x + 80,029
70 R² = 0,9695
KAdar Air ( % )

65
60
55
50
45
40
35
30
10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44
Jumlah Ketukan Liquid Limit Plastic Limit Plasticity Index
63,55 35,72 27,83

Di Setujui Oleh : Di Periksa Oleh : Di buat Oleh :


Pengawas Lapangan Konsultan Supervisi Kontraktor Flow Index
Proyek Bendungan Mbay Paket IK-RSN-SBN, KSO WASKITA - BUMI INDAH, KSO 37,44
1

aaaaaaaaaaaaaaaaaaa
Tofan Zaelani
TA. Material Timbunan Quality Control
PROYEK PEMBANGUNAN BENDUNGAN MBAY ( Paket 1 )

PLASTICITY CHART

PLASTICITY CHART
70,00

U LINE

60,00
Inorganic clays CH
of high plasticity

50,00 Inorganic silt of


low compressibility
Inorganic clays A LINE
Plasticity Index (PI)

40,00
of medium plasticity
SAMPLE
Inorganic silt of A LINE
30,00 high compressibility U LINE
Inorganic clays and organic clays CL-ML
of low plasticity
CL
20,00

MH
Inorganic silt of
10,00
medium compressibility
Conhesionless A LINE
ML and organic silts
soil
0,00
0,00 10,00 20,00 30,00 40,00 50,00 60,00 70,00 80,00 90,00 100,00
Liquid Limit (LL)
GRAIN SIZE ANALYSIS TEST
Astm ( D 422 - 63 )

Lokasi : Barat Gudang Handak

Nama Sample : Zona Inti


Item Pekerjaan : Timbunan Zona inti * Setelah dicuci
Tanggal : 13 Juli 2022 Massa Jumlah Persentase
NO.MESH Saringan tertahan Massa Keterangan
Tertahan Lewat
mm Tertahan

3/4" 19,100 100,00


MASSA TANAH KERING : 60 gram NO.4 4.75 100,00
Berat Jenis : 2,456 NO.40 0,420 0,70 0,70 1,17 98,83
Type Hydrometer : 152 H NO.200 0,075 6,60 7,30 12,17 87,83
0,075 1,67 8,97 14,95 85,05

* Hydrometer Test
Pembacaan Koreksi
Waktu Waktu Suhu Hidrometer Diameter Faktor Persentase Keterangan
P = ( R.a/W)x100
T D = K √L/T
(menit) ToC R K L √L/T mm a
18,01
15:31:00 0,5 24 55 0,01388 7,3 3,8210 0,05304 1,040 95,33 83,73
15:32:00 1 24 51 0,01388 7,9 2,8107 0,03901 1,040 88,40 77,64
09.32 2 24 50 0,01388 8,1 2,0125 0,02793 1,040 86,67 76,12
09.35 5 24 49 0,01388 8,3 1,2884 0,01788 1,040 84,93 74,60
09.45 15 24 47 0,01388 8,6 0,7572 0,01051 1,040 81,47 71,55
10.00 30 23 45 0,01404 8,9 0,5447 0,00765 1,040 78,00 68,51
10.30 60 23 42 0,01404 9,4 0,3958 0,00556 1,040 72,80 63,94
13.30 240 22 25 0,01404 12,2 0,2255 0,00317 1,040 43,33 38,06
09.30 1440 25 7 0,01372 15,2 0,1027 0,00141 1,040 12,13 10,66

Catatan :
Grafik
UKURAN SARINGAN
HIDROMETER

No.200

No.40

NO.4

3/4 ''

1/2
100
95
90
85
80
Jumlah Lewat Saringan %

75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0,001

0,01

0,1

10

100

1000
Lempung lanau pasir kerikil Boulder

lempung lanau Pasir Kerikil D60 Satuan


63,94 23,89 12,17 0,00 0,005 %
Di Setujui Oleh : Di Periksa Oleh : Di buat Oleh :
Pengawas Lapangan Konsultan Supervisi Kontraktor
Proyek Bendungan Mbay Paket IK-RSN-SBN, KSO WASKITA - BUMI INDAH, KSO
1

Tofan Zaelani
TA. Material Timbunan Quality Control
PROYEK PEMBANGUNAN BENDUNGAN MBAY ( Paket 1 )
PENGUJIAN SRINKAGE LIMIT ( SHRINKAGE LIMIT TEST )
( ASTM D-4318 )

Lokasi Barat gudang handak


Material Zona inti Zona inti Tanggal Pengujian 14 Juli 2022

10 Blows 10 Blows
1 Shringkage Dish No

2 Wt. of Dish + Wet Soil ( gr ) 31,8 32,5


3 Wt. of Dish + Wet Dry ( gr ) 22,9 22,6

4 Wt. of Dish ( gr ) 11,1 11,1

5 Wt. of Water ( 2 - 3 ) ( gr ) 8,9 9,9


6 Wt. of Dry Soil ( Wo ) = ( 3 - 4 ) ( gr ) 11,80 11,50

7 Moisture Content ( 5 / 6 x 100 ) (%) 75,42 86,09


8 Vol. Shrinkage Dish ( V ) ( cc ) 14,40 14,41

9 Vol. Dry Soil ( Vo ) ( cc ) 6,78 6,11

10 V - Vo = ( 8 - 9 ) ( cc ) 7,62 8,30
V - Vo
x 100 = 10 / 6 x 100 64,56 72,19
11 Wo
12 Shrinkage Limit ( 7 - 11 ) 10,87 13,90

13 Srinkage Ratio ( 6 / 9 ) 1,74 1,88

SRINKAGE LIMIT ( SL ) 12,38

Di Setujui Oleh : Di Periksa Oleh : Di buat Oleh :


Pengawas Lapangan Konsultan Supervisi Kontraktor
Proyek Bendungan Mbay IK-RSN-SBN, KSO WASKITA - BUMI INDAH, KSO
Paket 1

aaaaaaaaaaaaaaaaaaa
Tofan Zaelani
TA. Material Timbunan Quality Control

You might also like