Professional Documents
Culture Documents
SUMMARY
OF
LABORATORY TEST
CV. GEOTEKNIK JAYA MANDIRI
PROJECT : PEMBANGUNAN RUKO 3 LANTAI
SUMMARY OF LOCATION : SANGIANG JAYA, PERIUK, TANGERANG, BANTEN
JOB NO. : 234/S/GJM/23/VI
LABORATORY TEST DATE : 07-06-2023
RESULT
Sample No. 1 2
Bore Hole No. DB 1 DB 1 Unit
Sample Depth (m) 1.50 - 2.00 3.50 - 4.00
Gravel 0.000 0.000 %
Sand 3.686 4.004 %
Gradation
Silt 38.744 38.830 %
Clay 57.570 57.166 %
Liquid Limit (WL) 91.727 89.725 %
Atterberg
Plastic Limit (WP) 47.806 47.831 %
Limit
Indices Plasticity Index (IP) 43.921 41.894 %
Shrinkage Limit (WS) %
Specific Gravity (Gs) 2.387 2.396
Dry Density (yd) 0.818 0.846 t/m3
Coefficient of Permeability (k) cm/sec
Water Content (wn) 64.807 62.123 %
Wet Density (ym) 1.348 1.372 t/m3
Natural
State Void Ratio (e) 1.918 1.831
Porosity (n) 0.657 0.647
Degree of Saturation (Str) 80.639 81.282 %
Unconfined Compressive Strength kg/cm2
Comp. Test Sensitivity
Cohesion ( c ) 0.138 0.142 kg/cm2
Triaxial Cohesion Eff. 0.139 0.152 kg/cm2
Test Angle of Internal Friction (φ) 13.178 14.691 o
o
Angle of Internal Friction Eff. 15.777 24.793
Direct Shear Cohesion kg/cm2
Test Angle of Internal Friction o
cm2/sec
-5 -5
Consolidation Coeff. of Consolidation 5.3 x 10 5.0 x 10
Test Compression Index ( Cc ) 0.981 0.857
Compaction Optimum Moisture Content %
Test Max Dry Density t/m
3
Sample Condition
Test Condition
CBR
Test Water Content %
Dry Density t/m3
CBR %
Remarks :
LAMPIRAN – II
HASIL
ATTERBERG LIMIT TEST
Project No : 234/S/GJM/23/VI ATTERBERG
CV. GEOTEKNIK JAYA MANDIRI Project : PEMBANGUNAN RUKO 3 LANTAI
Soil Division Location : SANGIANG JAYA, PERIUK, TANGERANG, BANTEN Page 1 / 2
Bore No : DB 1 Sample Id :1 Date : 07-06-2023
JAKARTA
Layer No :1 Depth : 1.50-2.00 Wn : 64.807 %
Test No :2 Test By : KL Gs : 2.387
98
96
Water Content (%)
94
92
90 Flow Curve
88
86
84
82
80
5 10 15 20 25 30 35 40 45 50 60 70 80 90100
Number of Blows, N
80
70
Plasticity Index, IP
60
H
O
50 or
CH
40
30
O L
20
L or MH or OH
C
10
CL-ML ML or OL
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Liquid Limit (%)
RESULT:
Liquid Limit : 91.727 % Plasticity Index : 43.921
Plastic Limit : 47.806 % Flow Index : -19.489
Shrinkage Limit : 15.300 % Toughness Index: 2.254
Water Content : 64.807 % Water-Plasticity Ratio: 38.708 %
Project No : 234/S/GJM/23/VI ATTERBERG
CV. GEOTEKNIK JAYA MANDIRI Project : PEMBANGUNAN RUKO 3 LANTAI
Soil Division Location : SANGIANG JAYA, PERIUK, TANGERANG, BANTEN Page 1 / 2
Bore No : DB 1 Sample Id :2 Date : 07-06-2023
JAKARTA
Layer No :2 Depth : 3.50-4.00 Wn : 62.123 %
Test No :2 Test By : KL Gs : 2.396
98
96
Water Content (%)
94
92
90 Flow Curve
88
86
84
82
80
5 10 15 20 25 30 35 40 45 50 60 70 80 90100
Number of Blows, N
80
70
Plasticity Index, IP
60
H
O
50 or
CH
40
30
O L
20
L or MH or OH
C
10
CL-ML ML or OL
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Liquid Limit (%)
RESULT:
Liquid Limit : 89.725 % Plasticity Index : 41.894
Plastic Limit : 47.831 % Flow Index : -19.512
Shrinkage Limit : 15.300 % Toughness Index: 2.147
Water Content : 62.123 % Water-Plasticity Ratio: 34.115 %
LAMPIRAN – III
HASIL
GRAIN SIZE ANALYSIS
Project No : 234/S/GJM/23/VI GRAIN SIZE
CV. GEOTEKNIK JAYA MANDIRI Project : PEMBANGUNAN RUKO 3 LANTAI
Soil Division Location : SANGIANG JAYA, PERIUK, TANGERANG, BANTEN Page 1 / 1
Sample Id : DB 1 Depth : 1.50-2.00 USCS :
JAKARTA
Test Date : 07-06-2023 Soil Wgt : AASHTO :
Test By : KL LL : 91.730 % PL : 47.810 %
100
90
80
PERCENT FINER
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001 mm
RESULTS :
% Rock : 0.00 D85 : 0.043 Cu : 19.487
% Gravel : 0.00 D60 : 0.020 Cc : 0.051
% Sand : 3.69 D50 : 0.001
% Finer : 96.31 D30 : 0.001
% Silt : 38.74 D15 : 0.001
% Clay : 57.57 D10 : 0.001
MATERIAL DESCRIPTION:
CH
Project No : 234/S/GJM/23/VI GRAIN SIZE
CV. GEOTEKNIK JAYA MANDIRI Project : PEMBANGUNAN RUKO 3 LANTAI
Soil Division Location : SANGIANG JAYA, PERIUK, TANGERANG, BANTEN Page 1 / 1
Sample Id : DB 1 Depth : 3.50-4.00 USCS :
JAKARTA
Test Date : 07-06-2023 Soil Wgt : AASHTO :
Test By : KL LL : 89.720 % PL : 47.830 %
100
90
80
PERCENT FINER
70
60
50
40
30
20
10
0
100 10 1 0.1 0.01 0.001 mm
RESULTS :
% Rock : 0.00 D85 : 0.043 Cu : 19.024
% Gravel : 0.00 D60 : 0.019 Cc : 0.053
% Sand : 4.00 D50 : 0.001
% Finer : 96.00 D30 : 0.001
% Silt : 38.83 D15 : 0.001
% Clay : 57.17 D10 : 0.001
MATERIAL DESCRIPTION:
CH
LAMPIRAN – IV
HASIL
TRIAXIAL TEST
Project No : 234/S/GJM/23/VI TRIAXIAL TEST
CV. GEOTEKNIK JAYA MANDIRI Project : PEMBANGUNAN RUKO 3 LANTAI
Soil Division Location : SANGIANG JAYA, PERIUK, TANGERANG, BANTEN Page 1 of 2
Sample Id : DB1 Depth : 1.50-2.00 Calib. Disp : 0.025
JAKARTA
Test Date : 07-06-2023 Test Type : UU Calib. Load : 0.133
Test By : KL Sample Type : Undisturbed
Description : CH
2.50
SAMPLE NO 1 2 3
UntWgt,t/m3 1.348 1.348 1.348
2.25
WtrCon, % 64.807 64.807 64.807
Y,dry t/m3 0.818 0.818 0.818
INITIAL
2.00 Gs 2.387 2.387 2.387
Void ratio 1.918 1.918 1.918
Sat. % 80.639 80.639 80.639
Deviator Stress (kg/cm2)
1.20
0.80
0.40
0.00
0.00 0.30 0.60 0.90 1.20 1.50 1.80 2.10 2.40 2.70 3.00 3.30 3.60 3.90 4.20 4.50
Normal Stress, kg/cm2
Project No : 234/S/GJM/23/VI TRIAXIAL TEST
CV. GEOTEKNIK JAYA MANDIRI Project : PEMBANGUNAN RUKO 3 LANTAI
Soil Division Location : SANGIANG JAYA, PERIUK, TANGERANG, BANTEN Page 1 of 2
Sample Id : DB 1 Depth : 3.50-4.00 Calib. Disp : 0.025
JAKARTA
Test Date : 07-06-2023 Test Type : UU Calib. Load : 0.133
Test By : KL Sample Type : Undisturbed
Description : CH
2.50
SAMPLE NO 1 2 3
UntWgt,t/m3 1.372 1.372 1.372
2.25
WtrCon, % 62.123 62.123 62.123
Y,dry t/m3 0.846 0.846 0.846
INITIAL
2.00 Gs 2.396 2.396 2.396
Void ratio 1.831 1.831 1.831
Sat. % 81.282 81.282 81.282
Deviator Stress (kg/cm2)
1.20
0.80
0.40
0.00
0.00 0.30 0.60 0.90 1.20 1.50 1.80 2.10 2.40 2.70 3.00 3.30 3.60 3.90 4.20 4.50
Normal Stress, kg/cm2
LAMPIRAN – V
HASIL
CONSOLIDATION TEST
Project No : 234/S/GJM/23/VI CONSOLIDATION
CV. GEOTEKNIK JAYA MANDIRI Project : PEMBANGUNAN RUKO 3 LANTAI
Soil Division Location : SANGIANG JAYA, PERIUK, TANGERANG, BANTEN Page 2 / 11
Bore No : DB 1 Sample Id :1 Date : 07-06-2023
JAKARTA
Layer No :1 Depth : 1.50-2.00 DRC : 1.000
Test No :1 Test By : KL LRC : 5.000
Description : CH
1.400
1.300
1.200
1.100
1.000
0.900
0.800
0.700
0.600
0.500
0.400
0.300
0.200
0.100
0.000
0.1 0.20 0.5 1.0 2 3 4 5 6 8 10 20 50 100 1000
Pressure (kg/cm2)
10.00
Cv (x0.00001 cm2/sec)
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
0.1 0.20 0.5 1.0 2 3 4 5 6 8 10 20 50 100 1000
+ Square Root
Pressure (kg/cm2)
x Log Fitting
Project No : 234/S/GJM/23/VI CONSOLIDATION
CV. GEOTEKNIK JAYA MANDIRI Project : PEMBANGUNAN RUKO 3 LANTAI
Soil Division Location : SANGIANG JAYA, PERIUK, TANGERANG, BANTEN Page 2 / 11
Bore No : DB 1 Sample Id :2 Date : 07-06-2023
JAKARTA
Layer No :2 Depth : 3.50-4.00 DRC : 1.000
Test No :2 Test By : KL LRC : 5.000
Description : CH
1.400
1.300
1.200
1.100
1.000
0.900
0.800
0.700
0.600
0.500
0.400
0.300
0.200
0.100
0.000
0.1 0.20 0.5 1.0 2 3 4 5 6 8 10 20 50 100 1000
Pressure (kg/cm2)
10.00
Cv (x0.00001 cm2/sec)
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
0.00
0.1 0.20 0.5 1.0 2 3 4 5 6 8 10 20 50 100 1000
+ Square Root
Pressure (kg/cm2)
x Log Fitting