PROPOSED TRACK WORK ON SECTION - 4 (30KM)

RESOURCE REQUIREMENT
Description
S.No Remarks
Section-1 Section-2
Manpower: PWI-1,Picow-4, Manpower: PWI-1,Picow-
Manpower-35, lookout -4, 4, Manpower-35, lookout -4,
Safety-1, ATW welder-1 with 5 Safety-1, ATW welder-1 with
1 helper, TMT-4 5 helper, TMT-4

Machinaries: Machinaries:
Escavator-2,JCB-2,Compactor-1, Escavator-2,JCB-2,Compactor-
Crane lorry -1,Tipper lorry-2, 1, Crane lorry -
2 Tools lorry 7 ton-1,Hilux-2, 1,Tipper lorry-2, Tools lorry
Van-2,Cab lorry-1 7 ton-1,Hilux-2, Van-
2,Cab lorry-1

3 FBW-Welder-1,Manpower-20(Plant)

4 IFBW (Optional)

Note: All other requirements such as QA/QC,Planning,ect.to be added