Professional Documents
Culture Documents
CLO 1 Discover the application of mechanical and electrical systems in a building. (LOD 1-PLO1-C3)
CLO 2 Reproduce schematic diagram of mechanical and electrical system in a building using appropriate
drawing tools. (LOD5-PLO5-P3)
CLO 3 Display the quality of individual and teamwork in completing the assigned task. (LOD7-PLO9-A5)
Introduction:
The purpose of this project is to provide an exposure to the student on the application of mechanical ventilation
(including air-conditioning ) and electrical distribution system in a simple residential building.
By working in a group, students are required to identify and select the suitable mechanical ventilation and electrical
system to be applied in a typical residential house.
At the end of the project, students should able to compile all information of the selected M&E components and system
(mechanical ventilation and electrical) in a brief schematic drawing.
PROJECT INSTRUCTION:
1. Preparation
Propose ONE (1) design of two-storey residential house as a case study building.
o Develop the layout plan of the house (with area labelling and dimension) by using AutoCAD software.
1
Show all calculation, detailed product specifications (highlight the ventilation rate, price, brand, features
etc.) and justify your selection.
ASSESSMENT
Cognitive 5.0%
Psychomotor 7.5%
Affective 7.5%
Total 20%
DEADLINE
Both report and video must be submitted on week 14 (19 January 2023, Thursday)