Professional Documents
Culture Documents
SHANK LUBRICATION
13 14
SBH
DRILLING ROCK DRILL / ROTARY DRILL
FLUSHING
15
DRILLING ROTATION
(B)
RETURN
16
DRILLING PERCUSSION
RETURN PRESSURE
19 20 21 22
SHANK LUBRICATION
23
BOLTING ROTATION
(B)
RETURN
25
BOLTING PERCUSSION
RETURN
27
PRESSURE
28 29 30
(1)
NOT USED WITH ROTARY DRILL
(2)
NOT USED WITH HH200 DRIFTER
480
A B B A
Inflating
410 411 6 409 port C1 C2 C1 C2
6 P2 P1
Sealing 807 808
6 6 6 4
port 6
6 6 6
807 808 851 852 851
817 818 845
OR 6
6 850 6
6 6 6
6
707 708 707 708
C2 C1 C2 C1
(3)
718 717 715 716 713 714 745 746
477
4 4 6 6 6 6 477 6 6
V2 V1 V2 V1
4 4 4 4 4 4 4 4
622 621 620 619 618 617 615 616(3) 613 614 604 603 607 645 646 605 606 624 625
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
6
6
608
FROM ROD EXTENSION FROM ROD EXTENSION FROM ROD CLAMP FROM AIR PILOTED FROM PILOTED FROM MACHINED DRILLING CONTROL BLOCK (910) FROM MACHINED
CONTROL BLOCK (9080) CONTROL BLOCK (9080) CONTROL BLOCK (929) BALL VALVES CHECK VALVES (943) BOOM BLOCK (1301) IF RHR : (9108) BOOM BLOCK (1301)