SCHEDULE OF REINFORCEMENT

SCHEDULE OF REINFORCEMENT
1 360 360 BAR NOS
29 MARK SIZE SPACING SHAPE
BAR NOS
02
02 08 02 08 11 02 08
29 SIZE SHAPE

1050

1050
19 19 01 10 @ 150 c/c MARK SPACING

175

175
14 14
770
22 8 @ 200 c/c
02 12 @ 200 c/c

375

375
06 06
09
770 25 10 @ 200 c/c
09
FLY BACK FLY BACK

175

175
03 12 @ 150 c/c

360

360
27
05 27 26 10 @ 200 c/c
WALL WALL
200
05 27 10 285
12 @ 200 c/c @ 200 c/c

VARIES
275

150

150
8 05 05 8
2
06 12 @ 200 c/c
22 22 2
25
13 13
02 08

1000

1000
19 08 10 @ 200 c/c
26 26 25 28 0 @0
30 c c 30
200
09 10 @ 200 c/c
01 14 200

180

180
29 10 3 Bars in 2
01 10 10 200 Layers
03 03 10 10 @ 200 c/c
B

180
06 200
3 Bars in 2
30 10
9

175

175
14 14
11 8 @ 200 c/c Layers

180
175

175
19
19 B 2 LEGGED H 10 12 @ 200 c/c
360 02 01 12 02 01
360 2 @ 400 C/C
8
HORIZONTAL NOTES:

175

175
STIRRUPS 13 8 @ 200 c/c
1. BAR NO.25 IS ON EARTH FACE.

175

175
4 x 4 Nos.
R/F DETAILS OF BOX 8 5
14 10 2. BAR NO.26 IS ON EARTH FACE.
03
15 0 Onos
MAIN REINF. 22
13
430
16 12 @ 100 c/c 200
02 01 03 02 200
650

BOTTOM
SLAB
200
DETAIL - '1' 1245
17 10 @ 200 c/c 1050
1485
01 02 (FLYBACK WALL R/F NOT SHOWN FOR CLARITY)
MAIN REINF. DISTRIBUTION 18 10 10 x 1 Nos.

SECTION' B-B '

175

175
19 10 @ 200 c/c

902 600

.
12 SCHEDULE OF LAP LENGTH FOR REINFORCEMENT
EXTERNAL
FAVORABLE BOND UNFAVORABLE BOND
WALL
CONCTETE
% OF GRADE M25 M30 M35 M40 M25 M30 M35 M40
14 LAPPED BAR
22 <25%
14 DISTRIBUTION > 25 % & < 33%
> 33 % & < 50%
>50% NOT ALLOWED
D D 13
FOR DETAILS OF FAVOURABLE BOND AND UNFAVOURABLE BONED
DISTRIBUTION
CONDITIONS REFER CLAUSE 15.2.3. OF IRC : 112-2011.
NOTE FOR BOX TYPE STRUCTURES :
02 05 BARS INCLUDING DISTRIBUTION STEEL ON TOP FACE OF TOP & BOTTOM SLAB
BOTTOM SLAB R/F PLAN MAIN REINF SHALL BE CONSIDERED IN UNFAVOURABLE BOND CONDITION AND ALL OTHER
BARS SHALL BE CONSIDERED IN FAVORABLE BOND CONDITION.

MAIN REINF

02 08 06 02
SECTION' C-C '

BOTTOM SLAB REINF.


600 600
BEND AT RIGHT ANGLE BEND WITH CLOSE HOOKS

14 18
EQ

. EQ
11
EQ

EQ
EQ

EQ 17
EQ

EQ

LEGENDS:
SECTION' D-D ' R/F - REINFORCEMENT
TOP SLAB R/F PLAN BENDING OF BARS --------------------- - BOTTOM REINFORCEMENT / FAR FACE
- TOP REINFORCEMENT / SOIL FACE

CLIENT:- TITLE:
AUTHORITY ENGINEER :
PROJECT: BOX CULVERT REINFORCEMENT 1X1.2X1.2
LNM INFRA PROJECTS PVT. LTD.
NATIONAL HIGHWAY (P.W.D) MAHARASHTRA
Ministry of Road Transport and Highways
BHOPAL LANE CONFIGURATION (PACKAGE NO- NH/IAHE/02) IN THE STATE OF MAHARASHTRA ON DRN. A. LAL SCALE
ON (A3)
NTS
Government of India ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) BASIS CONTRACT CHKD. V. AJAL DATE DECEMBER, 2019
CONTRACTOR:- DESIGN CONSULTANT:- DESIGN CHAINAGE - CH. 113+650 TO CH. 115+800
P.K. CONSULTING ENGINEERS PRIVATE LIMITED DESIGN CHAINAGE - CH. 123+100 TO CH. 151+020 APPD. K. PAREEK Rev. R0
TC Tower, Metro Pillar No. 29,Near Mansarover Metro Station,
Jaipur-302019 DESIGN CHAINAGE - CH. 158+020 TO CH. 161+020 DATE REV. CODE PARTICULARS DRAWN CHKD. APPD.
DRG.NO. PKE/015/BOX/CUL-02