TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES

Ayala Blvd., Ermita, Manila


COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

MATERIALS AND ESTIMATED QUANTITIES REQUIRED


ITEM TO BE
COMPUTATION ø 10 mm x ø 10 mm x ø 10 mm x ø 10 mm x ø 10 mm x
ESTIMATED
6.00 m 7.50 m 9.00 m 10.50m 12.00 m
FOOTING BEAMS FOUNDATION
LENGTH (m): 1.305
DIAMETER (mm): 10
TOTAL NO. OF BARS: 580
NO. OF PCS PER CL/L OF BARS
TB-1|TB-2|TB-3 ‫ܮܧ ܰ ܩܶ ܪ ܥ ܱ ܯ ܯ ܧ ܴ ܥܫܣܮ‬
STIRRUPS ‫ܮܧ ܰ ܩ ܶ ܪ‬
6.00 m 7.50 m 9.00 m 10.50 m 12.00 m
4.598 5.747 6.897 8.046 9.195
THEREFORE: USE 10.50 m 8.046
ܱܶܶ
‫ ܱܰ ܣܮ‬Ǥܱ‫ܣ ܵ ܨ‬ ܴ ‫ܤ‬ 580
ൌ 72.086 ;say 73 PCS.
ܱܰ Ǥܱ‫ܥ ܵܲ ܨ‬Ǥܴܲ ‫ܥܮ ܧ‬ 8.046 ൌ
MATERIALS AND ESTIMATED QUANTITIES REQUIRED
ITEM TO BE
COMPUTATION ø 10 mm x ø 10 mm x ø 10 mm x ø 10 mm x ø 10 mm x
ESTIMATED
6.00 m 7.50 m 9.00 m 10.50m 12.00 m
BEAMS GROUND FLOOR TO THIRD FLOOR
LENGTH (m): 0.835
DIAMETER (mm): 10
TOTAL NO. OF BARS: 29
NO. OF PCS PER CL/L OF BARS
G-1|G-3 ‫ܮܧ ܰ ܩܶ ܪ ܥ ܱ ܯ ܯ ܧ ܴ ܥܫܣܮ‬
STIRRUPS ‫ܮܧ ܰ ܩ ܶ ܪ‬
6.00 m 7.50 m 9.00 m 10.50 m 12.00 m
7.186 8.982 10.778 12.575 14.371
THEREFORE: USE 6.00 m 7.186
ܱܶܶ
‫ ܱܰ ܣܮ‬Ǥܱ‫ܣ ܵ ܨ‬ ܴ ‫ܤ‬ 29
ൌ 4.036 ;say 5 PCS.
ܱܰ Ǥܱ‫ܥ ܵܲ ܨ‬Ǥܴܲ ‫ܥܮ ܧ‬ 7.186 ൌ
MATERIALS AND ESTIMATED QUANTITIES REQUIRED
ITEM TO BE
COMPUTATION ø 10 mm x ø 10 mm x ø 10 mm x ø 10 mm x ø 10 mm x
ESTIMATED
6.00 m 7.50 m 9.00 m 10.50m 12.00 m
BEAMS GROUND FLOOR TO THIRD FLOOR
LENGTH (m): 0.935
DIAMETER (mm): 10
TOTAL NO. OF BARS: 29
NO. OF PCS PER CL/L OF BARS
G-2 ‫ܮܧ ܰ ܩܶ ܪ ܥ ܱ ܯ ܯ ܧ ܴ ܥܫܣܮ‬
STIRRUPS ‫ܮܧ ܰ ܩ ܶ ܪ‬
6.00 m 7.50 m 9.00 m 10.50 m 12.00 m
6.417 8.021 9.626 11.230 12.834
THEREFORE: USE 7.50 m 8.021
ܱܶܶ
‫ ܱܰ ܣܮ‬Ǥܱ‫ܣ ܵ ܨ‬ ܴ ‫ܤ‬ 29
ൌ8.021 ൌ3.615 ;say 4 PCS.
ܱܰ Ǥܱ‫ܥ ܵܲ ܨ‬Ǥܴܲ ‫ܥܮ ܧ‬

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

MATERIALS AND ESTIMATED QUANTITIES REQUIRED


ITEM TO BE
COMPUTATION ø 10 mm x ø 10 mm x ø 10 mm x ø 10 mm x ø 10 mm x
ESTIMATED
6.00 m 7.50 m 9.00 m 10.50m 12.00 m
BEAMS GROUND FLOOR TO FOURTH FLOOR
LENGTH (m): 0.835
DIAMETER (mm): 10
TOTAL NO. OF BARS: 29
NO. OF PCS PER CL/L OF BARS
G-3 ‫ܮܧ ܰ ܩܶ ܪ ܥ ܱ ܯ ܯ ܧ ܴ ܥܫܣܮ‬
STIRRUPS ‫ܮܧ ܰ ܩ ܶ ܪ‬
6.00 m 7.50 m 9.00 m 10.50 m 12.00 m
7.186 8.982 10.778 12.575 14.371
THEREFORE: USE 6.00 m 7.186
ܱܶܶ
‫ ܱܰ ܣܮ‬Ǥܱ‫ܣ ܵ ܨ‬ ܴ ‫ܤ‬ 29
ൌ7.186 ൌ4.036 ;say 5 PCS.
ܱܰ Ǥܱ‫ܥ ܵܲ ܨ‬Ǥܴܲ ‫ܥܮ ܧ‬
MATERIALS AND ESTIMATED QUANTITIES REQUIRED
ITEM TO BE
COMPUTATION ø 10 mm x ø 10 mm x ø 10 mm x ø 10 mm x ø 10 mm x
ESTIMATED
6.00 m 7.50 m 9.00 m 10.50m 12.00 m
BEAMS GROUND FLOOR TO FOURTH FLOOR
LENGTH (m): 1.035
DIAMETER (mm): 10
TOTAL NO. OF BARS: 87
NO. OF PCS PER CL/L OF BARS
G-4|G-6 ‫ܮܧ ܰ ܩܶ ܪ ܥ ܱ ܯ ܯ ܧ ܴ ܥܫܣܮ‬
STIRRUPS ‫ܮܧ ܰ ܩ ܶ ܪ‬
6.00 m 7.50 m 9.00 m 10.50 m 12.00 m
5.797 7.246 8.696 10.145 11.594
THEREFORE: USE 10.50 m 10.145
ܱܶܶ
‫ ܱܰ ܣܮ‬Ǥܱ‫ܣ ܵ ܨ‬ ܴ ‫ܤ‬ 87
ൌ 8.576 ;say 9 PCS.
ܱܰ Ǥܱ‫ܥ ܵܲ ܨ‬Ǥܴܲ ‫ܥܮ ܧ‬ 10.145ൌ
MATERIALS AND ESTIMATED QUANTITIES REQUIRED
ITEM TO BE
COMPUTATION ø 10 mm x ø 10 mm x ø 10 mm x ø 10 mm x ø 10 mm x
ESTIMATED
6.00 m 7.50 m 9.00 m 10.50m 12.00 m
BEAMS GROUND FLOOR TO FOURTH FLOOR
LENGTH (m): 0.533
DIAMETER (mm): 10
TOTAL NO. OF BARS: 87
NO. OF PCS PER CL/L OF BARS
G-4|G-6
‫ܮܧ ܰ ܩܶ ܪ ܥ ܱ ܯ ܯ ܧ ܴ ܥܫܣܮ‬
SUPPLEMENTARY
TIES ‫ܮܧ ܰ ܩ ܶ ܪ‬
6.00 m 7.50 m 9.00 m 10.50 m 12.00 m
11.257 14.071 16.886 19.700 22.514
THEREFORE: USE 7.50 m 14.071
ܱܶܶ
‫ ܱܰ ܣܮ‬Ǥܱ‫ܣ ܵ ܨ‬ ܴ ‫ܤ‬ 87

14.071ൌ6.183 ;say 7 PCS.
ܱܰ Ǥܱ‫ܥ ܵܲ ܨ‬Ǥܴܲ ‫ܥܮ ܧ‬

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

MATERIALS AND ESTIMATED QUANTITIES REQUIRED


ITEM TO BE
COMPUTATION ø 10 mm x ø 10 mm x ø 10 mm x ø 10 mm x ø 10 mm x
ESTIMATED
6.00 m 7.50 m 9.00 m 10.50m 12.00 m
BEAMS GROUND FLOOR TO FOURTH FLOOR
LENGTH (m): 1.235
DIAMETER (mm): 10
TOTAL NO. OF BARS: 116
NO. OF PCS PER CL/L OF BARS
G-5|G-7|G-8 ‫ܮܧ ܰ ܩܶ ܪ ܥ ܱ ܯ ܯ ܧ ܴ ܥܫܣܮ‬
STIRRUPS ‫ܮܧ ܰ ܩ ܶ ܪ‬
6.00 m 7.50 m 9.00 m 10.50 m 12.00 m
4.858 6.073 7.287 8.502 9.717
THEREFORE: USE 7.50 m 6.073
ܱܶܶ
‫ ܱܰ ܣܮ‬Ǥܱ‫ܣ ܵ ܨ‬ ܴ ‫ܤ‬ 116
ൌ ൌ19.101 ;say 20 PCS.
ܱܰ Ǥܱ‫ܥ ܵܲ ܨ‬Ǥܴܲ ‫ܥܮ ܧ‬ 6.073

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A