TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES

Ayala Blvd., Ermita, Manila


COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
CONCRETE WORKS

FOOTING
COLUMN FOOTING
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
CF-1 6.000 3.500 0.500 3 31.500
F-3 3.400 3.400 0.500 11 63.580
TOTAL Volume 95.080
WALL FOOTING
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
WF-1 1.620 0.400 0.200 1 0.130
WF-1 2.750 0.400 0.200 1 0.220
WF-1 0.700 0.400 0.200 1 0.056
WF-1 1.500 0.400 0.200 1 0.120
WF-1 0.850 0.400 0.200 1 0.068
WF-1 0.900 0.400 0.200 1 0.072
WF-1 0.550 0.400 0.200 1 0.044
WF-1 3.650 0.400 0.200 1 0.292
WF-1 3.300 0.400 0.200 1 0.264
WF-1 0.800 0.400 0.200 1 0.064
WF-1 0.800 0.400 0.200 1 0.064
WF-1 1.550 0.400 0.200 1 0.124
WF-1 2.500 0.400 0.200 1 0.200

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
CONCRETE WORKS

No. of
Area 1 Area 2 Volume
Mark Length (m) Structural
(sq. m) (sq.m) (cu. m)
Member
WF-2 0.700 0.100 0.068 1 0.117
WF-2 1.500 0.100 0.068 1 0.251
WF-2 2.700 0.100 0.068 1 0.452
WF-2 0.800 0.100 0.068 1 0.134
WF-2 0.800 0.100 0.068 1 0.134
WF-2 6.700 0.100 0.068 1 1.122
WF-2 0.700 0.100 0.068 1 0.117
WF-2 2.060 0.100 0.068 1 0.345
WF-2 2.920 0.100 0.068 1 0.489
WF-2 2.000 0.100 0.068 1 0.335
TOTAL Volume 5.215
STAIRS FOOTING
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
SF-1 0.600 0.600 0.300 4 0.432
SF-2 0.200 0.200 0.300 4 0.048
TOTAL Volume 0.480
TOTAL Volume of FOOTINGS 100.775

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
CONCRETE WORKS

COLUMNS
FOUNDATION TO GROUND FLOOR
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
C-1 0.435 0.435 1.600 3 0.908
C-2 0.610 0.610 1.600 3 1.786
C-3 0.585 0.585 1.600 11 6.023
C-4 0.150 0.150 1.600 1 0.036
TOTAL Volume 8.754
GROUND FLOOR TO SECOND FLOOR
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
C-1 0.400 0.400 3.200 3 1.536
C-2 0.575 0.575 3.200 3 3.174
C-3 0.550 0.550 3.200 11 10.648
C-4 0.150 0.150 3.200 3 0.216
TOTAL Volume 15.574
SECOND FLOOR TO THIRD FLOOR
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
C-1 0.400 0.400 3.200 2 1.024
C-2 0.550 0.550 3.200 1 0.968
C-3 0.550 0.550 3.200 10 9.680
TOTAL Volume 11.672

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
CONCRETE WORKS

THIRD FLOOR TO FOURTH FLOOR


No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
C-1 0.400 0.400 3.200 2 1.024
C-2 0.450 0.450 3.200 1 0.648
C-3 0.450 0.450 3.200 10 6.480
TOTAL Volume 8.152
FOURTH FLOOR TO ROOF DECK LINE
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
C-1 0.400 0.400 3.200 2 1.024
C-2 0.450 0.450 3.200 1 0.648
C-3 0.450 0.450 3.200 10 6.480
TOTAL Volume 8.152
ROOF DECK
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
C-1 0.400 0.400 1.000 2 0.320
C-2 0.450 0.450 1.000 1 0.203
C-3 0.450 0.450 1.000 10 2.025
TOTAL Volume 2.548
TOTAL Volume of COLUMNS 54.851

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
CONCRETE WORKS

SLABS
FOUNDATION
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
Slab on Fill 18.940 15.000 0.100 1 28.410
SECOND FLOOR
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
S-1 5.100 3.750 0.100 2 3.825
S-1 3.750 3.750 0.100 4 5.625
S-1 3.750 4.000 0.100 2 3.000
S-2 3.750 3.750 0.100 2 2.813
S-3 1.940 3.750 0.100 2 1.455
S-3 2.400 3.750 0.100 2 1.800
S-3 4.340 2.080 0.100 1 0.903
S-4 1.940 5.420 0.100 1 1.051
S-4 5.170 2.080 0.100 1 1.075
S-5 2.000 3.750 0.100 2 1.500
S-6 2.400 1.000 0.100 1 0.240
TOTAL Volume 23.287
THIRD FLOOR
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
S-1 5.100 3.750 0.100 2 3.825
S-1 3.750 3.750 0.100 4 5.625
S-1 3.750 4.000 0.100 2 3.000
S-2 3.750 3.750 0.100 2 2.813
S-3 1.940 3.750 0.100 2 1.455
S-3 2.400 3.750 0.100 2 1.800
S-3 4.340 2.080 0.100 1 0.903
S-4 1.940 5.420 0.100 1 1.051
S-4 5.170 2.080 0.100 1 1.075
S-5 2.000 3.750 0.100 2 1.500
S-6 2.400 1.000 0.100 1 0.240
TOTAL Volume 23.287

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
CONCRETE WORKS

FOURTH FLOOR
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
S-1 5.100 3.750 0.100 2 3.825
S-1 3.750 3.750 0.100 4 5.625
S-1 3.750 4.000 0.100 2 3.000
S-2 3.750 3.750 0.100 2 2.813
S-3 1.940 3.750 0.100 2 1.455
S-3 2.400 3.750 0.100 2 1.800
S-3 4.340 2.080 0.100 1 0.903
S-4 1.940 5.420 0.100 1 1.051
S-4 5.170 2.080 0.100 1 1.075
S-5 2.000 3.750 0.100 2 1.500
S-6 2.400 1.000 0.100 1 0.240
TOTAL Volume 23.287
ROOF DECK
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
S-1 5.100 3.750 0.100 2 3.825
S-1 3.750 3.750 0.100 4 5.625
S-1 3.750 4.000 0.100 2 3.000
S-2 3.750 3.750 0.100 2 2.813
S-3 1.940 3.750 0.100 2 1.455
S-3 2.400 3.750 0.100 2 1.800
S-3 4.340 2.080 0.100 1 0.903
S-4 1.940 5.420 0.100 1 1.051
S-4 5.170 2.080 0.100 1 1.075
S-6 2.400 1.000 0.100 1 0.240
TOTAL Volume 21.787
TOTAL Volume of SLABS 120.058

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
CONCRETE WORKS

STAIRS
GROUND FLOOR
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
Rise and Run 0.300 1.200 0.160 20 0.576
Landing 1.200 2.400 0.150 1 0.432
TOTAL Volume 1.008
SECOND FLOOR
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
Rise and Run 0.300 1.200 0.160 20 0.576
Landing 1.200 2.400 0.150 1 0.432
TOTAL Volume 1.008
THIRD FLOOR
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
Rise and Run 0.300 1.200 0.160 20 0.576
Landing 1.200 2.400 0.150 1 0.432
TOTAL Volume 1.008
FOURTH FLOOR
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
Rise and Run 0.300 1.200 0.160 20 0.576
Landing 1.200 2.400 0.150 1 0.432
TOTAL Volume 1.008
TOTAL Volume of STAIRS 4.032

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
CONCRETE WORKS

BEAMS
FOUNDATION BEAM
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
FB-1 7.500 0.300 0.400 5 4.500
FB-1 2.080 0.300 0.400 5 1.248
FB-1 5.420 0.300 0.400 4 2.602
FB-1 5.100 0.300 0.400 3 1.836
FB-1 4.340 0.300 0.400 4 2.083
FB-1 3.750 0.300 0.400 4 1.800
FB-1 3.750 0.300 0.400 4 1.800
TOTAL Volume 15.869
FOOTING TIE BEAMS
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
TB-1 1.600 0.300 0.500 1 0.240
TB-2 4.300 0.300 0.500 1 0.645
TB-2 3.850 0.300 0.500 1 0.578
TB-2 6.650 0.300 0.500 1 0.998
TB-2 3.165 0.300 0.500 1 0.475
TB-2 3.165 0.300 0.500 1 0.475
TB-2 4.600 0.300 0.500 1 0.690
TB-2 7.300 0.300 0.500 1 1.095
TB-3 1.600 0.300 0.500 1 0.240
TB-3 6.600 0.300 0.500 1 0.990
TB-3 4.300 0.300 0.500 1 0.645
TB-3 3.830 0.300 0.500 1 0.575
TB-3 3.165 0.300 0.500 1 0.475
TB-3 3.165 0.300 0.500 1 0.475
TB-3 6.600 0.300 0.500 1 0.990
TB-3 6.600 0.300 0.500 1 0.990
TB-3 3.165 0.300 0.500 1 0.475
TB-3 3.165 0.300 0.500 1 0.475
TB-3 3.830 0.300 0.500 1 0.575
TOTAL Volume 12.098

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
CONCRETE WORKS

STAIR BEAMS
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
STB-1 1.200 0.200 0.400 80 7.680
STB-2 2.400 0.200 0.400 16 3.072
TOTAL Volume 10.752
SECOND FLOOR
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
G-1 2.000 0.300 0.400 1 0.240
G-2 2.000 0.300 0.450 2 0.540
G-3 2.080 0.300 0.450 2 0.562
G-3 7.500 0.300 0.450 1 1.013
G-4 3.750 0.400 0.400 6 3.600
G-5 4.340 0.400 0.500 5 4.340
G-6 5.100 0.400 0.400 4 3.264
G-6 5.420 0.400 0.400 2 1.734
G-7 7.500 0.400 0.500 7 10.500
G-8 7.500 0.400 0.500 4 6.000
TOTAL Volume 31.793
THIRD FLOOR
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
G-1 2.000 0.300 0.400 1 0.240
G-2 2.000 0.300 0.450 2 0.540
G-3 2.080 0.300 0.450 2 0.562
G-3 7.500 0.300 0.450 1 1.013
G-4 3.750 0.400 0.400 6 3.600
G-5 4.340 0.400 0.500 5 4.340
G-6 5.100 0.400 0.400 4 3.264
G-6 5.420 0.400 0.400 2 1.734
G-7 7.500 0.400 0.500 7 10.500
G-8 7.500 0.400 0.500 4 6.000
TOTAL Volume 31.793

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
CONCRETE WORKS

FOURTH FLOOR
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
G-1 2.000 0.300 0.400 1 0.240
G-2 2.000 0.300 0.450 2 0.540
G-3 2.080 0.300 0.450 2 0.562
G-3 7.500 0.300 0.450 1 1.013
G-4 3.750 0.400 0.400 6 3.600
G-5 4.340 0.400 0.500 5 4.340
G-6 5.100 0.400 0.400 4 3.264
G-6 5.420 0.400 0.400 2 1.734
G-7 7.500 0.400 0.500 7 10.500
G-8 7.500 0.400 0.500 4 6.000
TOTAL Volume 31.793
ROOF DECK
No. of
Thickness Volume
Mark Length (m) Width (m) Structural
(m) (cu. m)
Member
G-3 2.080 0.300 0.450 2 0.562
G-4 3.750 0.400 0.400 6 3.600
G-5 4.340 0.400 0.500 5 4.340
G-6 5.100 0.400 0.400 4 3.264
G-6 5.420 0.400 0.400 2 1.734
G-7 7.500 0.400 0.500 7 10.500
G-8 7.500 0.400 0.500 4 6.000
TOTAL Volume 30.000
TOTAL Volume of BEAMS 164.096

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A