Professional Documents
Culture Documents
Tender for
Consultancy Services for Preparation of
Detailed Masterplan
VOLUME - 2
SCOPE OF SERVICES
JULY 2022
______________________________________________________________________________________________________
This document outlines all the tender and Contract agreement requirements in addition
to those specifically mentioned elsewhere in the compiled tender document, including the
Schedule of Remuneration.
This document mainly outlines the scope of services and responsibilities of the Tenderer
in a wide spectrum, but not limited to.
2
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Volume - 2
SCOPE OF SERVICES
3
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
TABLE OF CONTENT
1.2.5 PLANNING LEVEL 4: HAIMA CONCEPT & DETAILED MASTERPLAN (HDMP) .............................. 14
SECTION 02 - THE SITE ........................................................................................................... 15
2.1 HAIMA OVERVIEW ........................................................................................................................ 15
SECTION 03 - PROJECT AIMS ................................................................................................. 16
3.1 AIMS OF UPDATING HAIMA URBAN CHANGE PLAN (UCP) ........................................................... 16
4
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
LIST OF FIGURES
Figure 1 National Planning Level Map, Oman National Spatial Strategy,2022 ........................... 9
Figure 2 Regional Strategy Map for Al Wusta .......................................................................12
Figure 3 Urban Map For Haima ...........................................................................................13
Figure 4 The Project Stage Diagram ...................................................................................17
5
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
The Ministry of Housing & Urban Planning (MoHUP) was established by virtue of the Royal
Decree No. 93/2020 on August 18, 2020 amending the name from Ministry of Housing to
Ministry of Housing and Urban Planning, as well as re-defining its mandate and approving
its organizational structure.
While throughout the first fifty years of the Sultanate’s modern period from 1970-2020,
urban development was driven by quantitative growth, with the major achieve
meant of creating a homeowner society in Oman, the coming period’s focus is on the
quality of urban development as being a key component for the country’s overall
progress. Therefore, the Ministry of Housing and Urban Planning is pursuing a ‘Paradigm
Shift’ towards coherent and integrative urban planning and sustainable development of
cities, neighbourhoods, and buildings.
6
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Recognising the need for a cohesive vision for the spatial development of Oman, the
Oman National Spatial Strategy (ONSS) was initiated in 2017 by the Supreme Council for
Planning (now integrated within the Ministry of Housing and Urban Planning (MoHUP)-
completed by the end of 2020 and approved by the Cabinet in early 2021 - to guide the
future population and employment growth of Oman.
The ONSS was prepared in alignment with the United Nations Sustainable Development
Goals (UN SDGs) a global guidance on delivering inclusive and equitable societies through
a process of rigorous sustainability assessment.
The Oman National Spatial Strategy (ONSS) provides the planning framework for the
sustainable development of Oman over the next 20 years and beyond. The ONSS draws
on the guidance of the Oman Vision 2040 to overcome challenges, keep pace with
regional and global changes, and generate and seize opportunities to foster economic
competitiveness and social wellbeing.
“The Strategy was developed as a 20-year planning framework aiming to deliver a better
balance between social, economic, environmental and physical development at a strategic
scale. It ensures that cities are future-proofed against climate change and competitive in
nature. It provides clear answers to the residents of Oman, on where they should live,
where they should work, what kind of employment opportunities they will have, how they
will travel and what kind of environment they will be living in, as basis, for the generations
to come.”
(Extracted Statement of His Excellency Dr Khalfan Al Shueili, Minister of Housing and
Urban Planning.)
The Oman National Spatial Strategy introduced a four-level planning hierarchy where
each level - national, regional, city-wide and local - addresses a different scale and level
of detail.
While the first and second level of planning were successfully completed and approved
through the Oman National Spatial Strategy as well as the eleven Regional
Spatial Strategies for each Governorate, the next phase is now to develop the third and
fourth level of planning.
The ONSS is Oman’s new National Framework for guiding spatial development in the
country for the next 20 years. It is the highest spatial planning document and takes its
guidance from the new Oman Vision 2040. It is structured around 7 Core Themes (the
ONSS Strategic Goals) which are:
Strategic Goal #1: Sustainability and Response to Climate Change
Strategic Goal #2: Delivering Spatial Strategic Development
MINISTRY OF HOUSING & URBAN PLANNING
VOLUME 2: SCOPE OF SERVICES
HAIMA DETAILED MASTERPLAN
7
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
8
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
2:National
Figure 1 NationalPlanning
PlanningLevel
LevelMap,
Map,Oman
Omann National
National Spatial
Spatial Strategy,2022
Strategy,2022
9
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
In general, The RSS policy framework follows the same seven policy themes as described
in the ONSS. Each set of regional policy is linked to its corresponding national-level policy,
and is focused on a specific or cross-cutting aspect of spatial development.
Each RSS contains a vision for the relevant area of concern. In the case of Al Wusta, it is
envisioned to become:
“In 2040, Al Wusta is a region characterised by modern and well-
connected centres amidst a vast territory of deserts and the coast. Duqm,
designated as one of the National Gateways of Oman, is a vibrant city that
offers a full range of urban amenities for its residents and the wider region.
As an efficient port and business hub, Duqm’s primary focus is on
generating added value from manufacturing, petrochemicals and a new
modern large-scale fisheries complex. Haima is further developed as a
Regional Hub offering modern facilities for government administration and
the private sector. Other local centres in the region offer an above average
level of facilities to compensate for the relatively large distances in this
part of the Sultanate. The region uses its specific geographical advantages
to boost the transition of the energy landscape from oil and gas to
renewables. Al Wusta’s vast natural wilderness is carefully protected, well-
managed and promoted as adventure tourism destination”.
Al Wusta Governorate Regional Spatial Strategy (RSS) provides a strategic-level guide on
the future spatial growth of the Governorate to the target year 2040. It provides a road
map for where and how population and employment growth will be accommodated and
guides the direction of investment in socio-economic infrastructure. The policy framework
includes the instruments and mechanisms through which the RSS will be implemented
over the next 20 years.
Al Wusta Governorate is literally the central part of Oman, a vast and largely empty
governorate between the main population centers in north and south Oman. Although
the majority of the nomadic population has permanently settled in an in a couple of rural
centres, there is still a traditional way of life, with herding camels and goats over large
distances across the Governorate and far beyond, evidenced by dispersed encampments
spread over its territory.
Al Wusta has a population of 45,156 as of 2018, with the majority living in the coastal
areas, where the climate is somewhat more moderate than in the desert interior.
Hayma is the administrative capital of Al Wusta, while the Special Economic Zone of Ad
Duqm is a major urban and economic development project at the coast. The other main
coastal settlements are Mahawt (Hijj) and Al Jazer (Al Kahil). The majority of Al Wusta’s
10
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Omani population is of Bedouin origin and social life is strongly organised around tribal
relations. Their traditional way of life involved pastoral camel herding and fisheries.
The Governorate has a number of major economic assets. The rich fisheries grounds
being the traditional source of food and income and the provider of jobs in towns and
hamlets along the coast. In addition, the Governorate has some of Oman’s largest oil and
gas exploration fields and production sites around Mukhaizna and near Haima. Finally,
the development of the Port and Special Economic Zone at Duqm (SEZAD) is to play a
major rule in diversifying the regional economy. The plans for Duqm reveal a new city
that not only becomes a place to work, but also promises an urban lifestyle in the
predominantly rural governorate.
The RSS strategy encourages steady economic growth in Al Wusta, through further
development of those main economic assets and to generate more downstream economic
effects of natural resources. The quality of life in Al Wusta is to be improved through
further investment in existing villages and to ensure that community facilities are
accessible and within reach of all citizens. While development is spread across wider parts
of the governorate, respect for its cultural heritage and traditions remain core values of
such development.
Since such events or structural changes can only be fully understood after they have
happened, it is hard to plan ahead of them. The approach is therefore to ensure strategic
plans are flexible so that they can adapt to such unexpected major changes. This helps
to increase the resilience of spatial plans and development projects. Examples covered
by RSS policies include:
Increasing the regional and national levels of food self-sufficiency (FS policies).
Ensuring availability of fresh water and improving the resilience to flooding and
natural
disasters (WR policies).
Development of renewable energy projects to ensure long-term energy self-
sufficiency (EN policies).
Attracting private sector financing for delivering infrastructure and urban
development projects (GP policies).
Implement structured sustainability assessment considering social, economic
and environmental aspects for all major projects to be taken forward as part
of the RSS (SU policies).
11
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
The Wilayat of Haima represents an important hub for the oil and gas activities in the
Sultanate. In addition to its intermediate position among the regions eligible for
renewable energy production sources, the economic activities in the Wilayat of Haima
benefit from its central location, which links the main population centers in the north and
south of the Sultanate. The main development process also contributes to supporting the
economic movement in the Wilayat.
While most policy layers in the RSS have a sectoral approach, the Urban Change Plans
offer integrated maps showing how sectoral issues play out in Al Wusta’s key settlements
and together outline the future of those places. It is in these key settlements that the
discussion over the use of urban lands is the most urgent and potentially has a far-
reaching impact on daily lives of citizens.
The UCP of Haima provides a visual representation of spatial developments over the next
two decades and incorporate improved urban planning principles. The map focus on
major changes in land-use, thus indicating where urban expansion or infill development
within existing towns should be situated.
12
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
The UCP shows the current 2020 development boundary, as well as the proposed 2040
settlement boundary. As a general rule, all major development proposals should be
situated within this 2040 boundary.
The land uses on the maps use a specific colour for each distinctive land-use, yellow
indicating primary residential areas, purple showing industrial sites, and red indicating
commercial and mixed-use areas. Main geographical features and the main road network
are also shown. Overlays (hatched) are used to show “Infill” developments, consisting
of developments within existing urban areas, which have to be prioritised to create
optimal use of available land and more coherent townscapes.
13
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Although the UCP for Haima exists, the MoHUP seeks for its update as a first step before
the Tenderer will proceed with the next level of planning which is the detailed masterplan.
This is because there are unforeseen changes happened in the last years (i.e. Corona
pandemic and its implications to the economic and social sectors.
The update of UCP shall include, indicatively but not exclusively, the following:
After the easeful studies of the national and the regional level of Al Wusta, the Masterplan
for Haima will continue in the same manner with ONSS/RSS to achieve the main goals
with considering:
Identifying the potential for the development of empty plots, as well as plots
with dilapidated buildings that have to be replaced by new housing units.
Policies of ONSS – RSS such as enhancement, regeneration, infill, TOD etc
should be also considered if and where appropriate.
Considering the existing and the new planning standards to ensure that new
development fits the existing rural context, housing types and building styles.
Zoning should ensure that functions are situated in appropriate locations.
Other policy directives for public space improvement, ‘greening’ initiatives for
the city, public transport, car mobility and parking should be integrated in the
plan.
The organisation of community involvement.
14
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
The governorate capital of Haima will become a well-planned desert town with good
commercial, education and health care services. The Masterplan will be prepared to this
end. Existing residential quarters will be used for infill developments and a small extension
towards the south should be sufficient to accommodate growth up to 2040.
Taking the RSS as a reference, it proposed a new government district on the northern
side of the main road to further strengthen the role of Haima as a centre of government
with well-designed buildings and attractive public spaces. Haima will also become a focal
point or “feeder centre” of the surrounding oil and gas industry with more restaurants,
hotels and shops around a nicely designed and green central area.
A new logistics industrial area is situated at the northern side of the town to make room
for logistics companies that capture on Haima’s central location in Oman, but also
anticipate on the future railway connection and station (shown as rail corridor on the
urban change plan).
15
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Haima urban and economic growth requires to be supported with a sound spatial planning
framework that addresses the need to guide urban and economic development, creates the
framework for the protection of key environmental assets and sets priorities for investment that
supports the prosperity of its people, safeguarding its natural environment and strengthening
communities socially and culturally.
The main objectives of updating Haima UCP are:
Be the planning tool to guide the strategic development
Translate the RSS vision into clear objectives for the orchestration of the main
elements
Define the distribution of urban functions of city-wide importance
Provide a planning governance framework that can guide the spatial development of
the city
Allow future development projects, be it spatial, social or economic, to be fully
integrated into the city’s development vision
Provide a definition of spatial and functional conditions at both a strategic level and
plot level
Adapts to and reduce potential climate change impacts
Pursues and facilitates economic diversification with the introduction of high value-
added sectors
Promotes the energy transition
Taking the Haima UCP as a backbone, the assignment to develop Haima Detailed Masterplan
must provide a more focused spatial development strategy for Haima city. In setting the agenda
for spatial development on city level, Haima Detailed Masterplan will become one of the
benchmarks for future masterplan across the country, and must therefore and meet the following
objectives:
Introduce new, high-quality green spaces
Organize strategic growth consistent that align with the ONSS/RSS
Develop attractive residential living areas
Create a pedestrian line along the commercial streets
Improve public transportation
Address and improve the Infrastructure issues
The masterplan shall reflect the cultural aspects of society
Introduce central HUB for logistic, tourist, and other aspects
Identify a central area in Haima as main connection for several areas and wilyats
Preplanned and reorganized the un-utilized government entities land and identify
different alternative utilization options
16
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
The overall approach shall be interactive with both clients and stakeholders; client-
tenderer workshops shall be preceding through the project.
The overall period for preparing and completing the HDMP shall be six months including
Client approval of final deliverables. However, Tenderers may suggest alternative
schedules for the project stages backed by proper justifications and present the same to
MoHUP as part of tender clarification. Client will review the proposals and if accepted
MINISTRY OF HOUSING & URBAN PLANNING
VOLUME 2: SCOPE OF SERVICES
HAIMA DETAILED MASTERPLAN
17
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
shall communicate to all tenderers the new schedule through the standard tender
addendum.
The project inception report content addresses mainly the project management and
execution plan that will be delivered within two weeks from project initiation. The report
shall cover the comprise the following but not limited to:
- Project boundaries, scoping and project planning
- Approach and methodology of the project
- Scope and deliverables validation; comprehensive stage-wise list of project
deliverables
- Refined project programme presented in complete detail showing all project
milestones and their subtasks
- Quality management approach including a PQP (Project Quality Plan) customised
for the project
- Risk management approach: highlighting key risks associated with the project and
the proposed mitigation strategy
- Project organogram with associated team members and their roles in the project
- Key contacts for the project
- Communication protocol (between client & tenderer)
- Opportunities and Constraints Analysis
- Initial Review of existing information
- PMP (Project Management Plan) clearly setting out procedures for execution and
management of the project in line with Project’s methodology.
- Documentation Procedures – comprehensive documentation and recording of all
stages involved in the development of the HDMP including details of the EDMS
(electronic document management system) used for the project. It is the
Tenderer’s responsibility to manage the process and fully document the
development of the HDMP so it can be easily accessible and traceable for any
future use
- Progress reporting procedures – including weekly dashboards, monthly progress
reports with details of progress monitoring and tracking procedures
- Authorities’ Approval Tracker
- List of Stakeholders and details of Stakeholder Engagement Process customised
for the project.
18
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Stage 1 Deliverables:
- Draft Inception Report
- Final Inception Report
- Project Management Plan (including documentation procedures)
- Stockholder Engagement Process kick-off and Report
The aim of Stage 2 is to collect, review, update, analyse, evaluate and manage data on
the main parameters that define the structure of the current Al Wusta Governorate and
Wellyat of Haima and that will impact on the future of the area. This will form the basis
for transforming the Urban Change Plan into the Al Wusta Governorate and Wellyat of
Plan.
This stage shall include the following sub activities:
19
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
- Identify open questions, conflicts and existing policies to be answered through the
development of the structural plan.
Management of Database
For the successful implementation of the HDMP, it is essential that all data are
gathered systematically with special attention paid into its handover to a
burgeoning urban planning administration in Oman at project-completion stage.
The Tenderer will be expected to archive, manage, present and hand over the data
in accordance with the existing GIS and OPIS system.
Stage 2 Deliverables:
- Data Collection & Gap Analysis and Review and Update Report
- Report of open Questions
- Cross-Cutting Report
Stakeholder Consultation Progress (and plan of next stages)
Capacity Building Progress Report
GIS/OPIS Update database
- Executive Summary and high-level presentation slides: both English and Arabic
languages which shall be used for stakeholder consultation
- Update Haima UCP
4.3 STAGE 3
3A HAIMA CONCEPT MASTERPLAN
3B HAIMA DETAILED MASTERPLAN
At the core of Stage 3A and 3B are the production of the Haima Detailed Masterplan based
on the updated Urban Change Plan of Haima as well as all data gathered through Stage
2, including Stakeholder Engagement.
The stage of the 3A and 3B of Haima Detailed Masterplan shall cover the full scope of
services as the final stage, however, it may indicate open questions to be answered,
additional data to be gathered, conflicts to be resolved and policy alignments to be
addressed.
It is expected that the tenderer should consider the existing connectivity of Haima with
the surrounding settlements and major projects such as other Wilayats in Alwasta and
airport/train projects
It is expected from the Tenderer to follow the recommended structure indicated below
as a guide for the preparation of submission documentation for Masterplan proposals.
The outline provided refers to both Concept Masterplans and Detailed Masterplans, with
information applicable to Detailed Masterplans only, shown in bold.
20
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
21
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Note:
- The Tenderer should not proceed to the Detailed Masterplan (stage 3B)
unless the Client approve the Concept Masterplan (stage 3A).
- The Tenderer should consider Duqm masterplan in stage 3A.
22
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Executive Summary and high-level presentation slides (both English and Arabic)
23
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Map documents that were produced to support the mapping of Haima detailed
Masterplan
Manual for the development of the concept and detailed masterplan
Final Planning guidelines for Haima Detailed Masterplan
Final Governance Framework Report
Stakeholder workshop & materials (aside from smaller meetings and workshops)
24
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
25
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
(Policies Data) The Tenderer is to extend the ONSS database model by adding the local
level entities and data structures. The ONSS
database schema will be delivered in UML or XML format under the current ONSS
database schema.
(RawData) It is expected that the Geodatabase structure will evolve as data will be
collected and generated in subsequent stages. Accordingly, at the end of each stage, it
is requested from the Tenderer to submit an updated (populated) model of the
Geodatabase.
On the other hand, the Geodatabase development is to be guided by the ONSS/RSS
mapping guidelines and OPIS data structures.
The Client will provide to the tenderer the ONSS/RSS Geodatabase(s), that includes
Geodatabase model templates related to land use, policies and projects as well as other
relevant datasets. It is expected that the Tenderer will make use of these Geodatabases
as a baseline for implementing the required tasks and develop the model to accommodate
the Masterplan components and finally the action areas spatial elements. The Client will
also provide the Oman Spatial Data Infrastructure Project National Geodatabase (NGDB),
as well as other relevant studies’ data to be used as a reference for developing the project
Geodatabase. The NGDB includes various thematic datasets covering a wide range of
sectors (administrative, infrastructure, transportation, environment, demographics, etc.)
at the Sultanate level.
The datasets that will be prepared and included in the final Geodatabase include, but not
limited, to the following:
- Topography
- Geology
- Solid Waste
- Sewage
- Land use
- Administrative Boundaries
- Telecommunications
- Transportation
- Water Resources
- Water Networks and supply
- Power Networks and supply
- Archaeological/cultural Sites
- Protected Areas
- Natural Resources
MINISTRY OF HOUSING & URBAN PLANNING
VOLUME 2: SCOPE OF SERVICES
HAIMA DETAILED MASTERPLAN
26
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
- Risk Areas
- Socio-Economic data
- Location of Committed Planning Projects
- Others as need be or requested.
The work on the HDMP is a pioneering project in Oman. It is essential therefore that it is
supported with a programme of knowledge-transfer from the Tenderer to local
stakeholders, who will seek to develop other similar types of plan for other parts in Oman
in the future.
The Tenderer will need to develop a programme of capacity building, that is engaging,
participative and effective.
In consultation with the Client, the Tenderer will propose a programme of knowledge
transfer that includes the processes and procedures that were adopted in developing the
Masterplan. The programme will need to be supported with best-practice examples that
strengthen the decisions taken to inform development of the spatial development
strategy.
Deliverables:
- Process manual and development of training programme for developing the output
of each Stage; Stage 2: Data gathering, Stage 3: Haima detailed Masterplan
- See Deliverables of Stage 1-3
27
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
HDMP will play an important role as a tool to design and communicate the city’s image
and identity therefore, the city branding shall reflect the image currently, and its vision
in the future. As for Communication, it shall empower stakeholders with tools, resources,
communication and feedback mechanisms.
The Tenderer shall propose a comprehensive communication strategy inclusive of
branding and tools of communication, also a staged communication plan for every stage
of the HDMP development.
Deliverables:
- Communication Strategy (vision and branding of Haima detailed Masterplan,
communication tools and mechanisms)
- Deliverables as per Section 3
Communication & City branding materials
Masterplan City brand, vision, communication tools & mechanisms
Presentation to Key Stakeholders in Arabic and English
28
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
The successful Tenderer shall have the resources and depth of experience and expertise
to maintain a dedicated program / project management team within Oman in addition to
the necessary supervisory and technical resources from his other offices abroad.
Tenderer’s Staff deployed for the Scope of Services shall be composed of highly qualified
and experienced technical staff for the proper performance of the services and for
achieving the project objectives.
Successful Tenderer program management scope shall include but not be limited to
developing a detail project schedule, monthly reporting of the progress of the project,
coordination of meetings with the Client and developing and managing the project risk
matrix.
6.2 KEY PERSONNEL REQUIREMENTS AND QUALIFICATIONS
During the course of the (6) months of the project, the Tenderer shall make available a
Core team for the development of the HDMP with the following minimum requirements
for time spent in Oman to actively participate in the project. The tenderer should establish
offices in both Muscat and Haima and make sure the following team members will be
available to mobilize between both Muscat and Haima according to the project needs.
29
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
The following table describes the minimum guidelines for the project team members,
their qualifications and working experiences:
30
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
- Excellent interpersonal
and communication
skills.
- Excellent command of
English. Knowledge of
Arabic would be an
asset.
- Experience in project
management.
- Experience in
developing and
applying project
monitoring systems.
Urban Design Expert Degree in Urban Design/ - Provision of spatial
Urban Planning and Open visualisation for
Space, or other relevant detailed area plans.
studies - Broad-based
experience in urban
Experience: 15 years design and
development matters.
31
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
- Experienced in design
of local urban areas.
Landscape design expert Degree in engineering or - Experience in city
Landscape architecture landscaping and design
of open spaces in
Experience: 15 years similar climatic
environment
32
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
33
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
34
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
35
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
36
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
37
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
DETAILED SCOPE
This section details the scope for consultants for the development of HDMP. This is by no
means an exhaustive description of activities required by the Consultant to perform the
services under this tender. Tenderers are therefore requested to respond by elaborating
on the Scope of Services and include that as part of their technical submissions
Data collection and analysis phase shall include, but not limited, to the following
planning themes:
INFRASTRUCTURE UTILITIES
38
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
− Updated data about the existing electrical utilities (HV and MV networks)
including location, dimension, spare capacities, voltage level, etc.
− Updated guidelines and standards from relevant authorities such as OETC,
MEDC, etc.
The received data related to the existing electrical network is to be studied and
analysed, and the following activities are to be undertaken:
ECONOMIC DEVELOPMENT
39
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
SURVEY UPDATE
TRANSPORT SURVEY
Aiming the recalibration of the base year model as per the new data – changes (post-
COVID 19 period) the new 2020 e-census data etc., the Consultant shall organise and
conduct two types of field surveys:
1. traffic surveys e.g. Automatic Traffic Counts, journey times etc. in some of the same
locations as per the 2017 survey program as control -checkpoints in order to compare
the two periods between the base year model 2017 and today and do the needed
adjustments.
2. traffic surveys e.g. Automatic Traffic Counts, journey times, Household survey etc. in
new locations so that the Consultant will ensure that the new disaggregated TAZ
system (according to the needed level of details in the masterplan) will have the
needed data populated properly.
The Consultant is expected to calibrate and validate the base year Model. The
Consultant will describe in his technical offer the type of surveys and the methodology
he proposes to follow to do the above.
The masterplan spatial development will need to be in line with the planning policies
developed in the RSS, in order to ensure compact development and efficient future land
use and put an end to the continuous horizontal expansion of urban areas. Based on
the planning intervention policies identified in the RSS studies, the Urban Change Plan
(UCP), and Stage 2 data collection and analysis, the masterplan needs to identify the
additional developable land over brownfield land within the Haima UCP area to
accommodate future expansion, and the existing areas that need infill, regeneration
and enhancement. Limiting urban sprawl by ensuring compact development is one of
the main requirements of this masterplan in order to achieve future sustainable urban
development.
The Consultant’s methodology must cover the below-listed items:
− Land use plan
MINISTRY OF HOUSING & URBAN PLANNING
VOLUME 2: SCOPE OF SERVICES
HAIMA DETAILED MASTERPLAN
40
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
− Development area schedules for land use areas, as well as population and
housing unit projections
− Planning and urban design guidelines, Design Control and Regulations (DCR).
Urban design guidelines are needed for the following key areas:
Public realm – the streets, parks, and urban squares that are accessible to
the public
Built Form – the size, mass, scale, design elements, and uses of buildings,
both individually and in how they relate to each other collectively
Public realm and mobility areas for walking, transit, bicycle and private
vehicles
Heritage and cultural resources, with guidelines for buildings and landscapes that are
considered to be important to current and future generations, and that should be
preserved including: coastal setbacks, defined areas for protection/restoration and their
relevant guidelines; landmarks and viewpoints that need to be maintained and their
guidelines/ standards; at-risk areas and relevant guidelines/ interventions required and
pollution monitoring stations.
LANDSCAPE STRATEGY
Following the review and analysis of the relevant site surveys, and the collection of
baseline data, the Consultant is to review the current distribution, size and quality of
the existing network of open space, and assess their accessibility, in order to provide a
strategy to their enhancement. The strategy should aim to ensure that all urban areas
are within close proximity of open space, and should advise on how the masterplan
strategy will achieve this, identifying areas of deficiency that need to be resolved.
The development of the landscape strategy is to include the provision of an open space
hierarchy including: public parks, communal open space, urban squares and
streetscapes and pedestrian green routes. The Consultant will need to present their
approach to delivering a landscape strategy that promotes the generation of a unified,
safe and welcoming public environment for all.
DEMOGRAPHIC PROJECTIONS
41
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Economic Development Strategy within the masterplan shall determine the broad scale
and composition of the economy that will influence future land use and general physical
development over the proposed timeline. The Consultant is expected to identify key
sectoral drivers and emerging activities that present strong and realistic opportunities
for investment and economic diversification.
The principal aspects of the Economic Development Strategy are expected to include:
− Sectoral assessment/ opportunities;
− Social infrastructure gap analysis, including training and skills;
− Organisational arrangements for delivering economic projects;
− Regulatory environment (including planning, land use and development policy);
− Refreshed project portfolio (review of the RSS);
− Assessment of the project funding and financing environment, including PPP
options, or a different funding model, determining innovative finance
mechanisms that fit in Haima other than business as usual.
The main outcome is the production of an Economic Development Framework detailing
the target activities, projects, interventions, responsibilities, timeline, and proposed
funding/ financing model (to be consistent with the masterplan phases and timeline).
In particular, the Consultant shall:
Validate the feasibility of the newly proposed economic districts as listed in the Ad Al
Wusta RSS; and provide an implementation framework including regulatory structures,
PPP arrangements, development phasing, infrastructure requirements, transport
connectivity, financial planning)
Stimulating the rural economy
− Modern new CBD with modern commercial premises, hospitality, retail and
attractive public spaces
− Residential development will take the form of a more compact villa typology,
townhouses and new formats for apartments, with improved access to public
gardens and natural open space within the urban area.
− -Major highway and public transport investment.
INVESTMENT STRATEGY
The masterplan should place great importance on identifying potential sites and
locations for investment that can be swiftly expedited and also establish the broad
42
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
expectation of economic and financial benefit associated with them. The RSS should be
used as a guide to identify opportunity sites and locations, and Consultants are
expected to elaborate on these and identify additional sites and project opportunities at
a more detailed scale.
Key elements of the study should include:
• Locational analysis;
• Market demand/need analysis;
• Detailed land use options analysis;
• Identify necessary infrastructure;
• Costing, due diligence and viability testing;
• Financial assessment and modelling;
• Business case preparation, marketing plan;
• Proposed Timeline and Project Phasing;
• Project delivery/implementation guidance.
Accordingly, the Consultants are expected to advise on an appropriate PPP model(s)
and regulatory framework for attracting private sector investment for each
recommended priority project and or host sector under which it will operate.
43
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
network included in the model will need to be checked for inter-urban city-
scheduled bus networks.
Review and disaggregation of the TAZ system in Haima as per the agreed grains/
level of details of the masterplan; incorporating with the updates from the 2020
census data; the current TAZ allocated to the Haima should undergo a finer review
and disaggregation exercise incorporating the preliminary masterplan land-uses.
The Consultant will be provided with a user manual for undertaking this task.
The ONTM forecast models (2025, 2030, 2035 and 2040) were built for two
scenarios: Do-Minimum and Do-Something. The RSS models for the Do-Minimum
models will need to be re-visited and reviewed by the Consultant for new updated
information on the planned and committed developments, and highway and public
transport networks that were considered to be in place by the corresponding
forecast years. The Consultant will need to develop the forecast DM and DS
models for the three weekday peak hours (AM, LT and PM) and daily models
based on the Haima Detailed Masterplan Urban strategy
From the results obtained from the forecast model assignments, the Consultant is to
apply mitigation measures when the model experiences congestion and overcapacity.
The mitigating measures will need to be applied to the model, and further assignments
carried out until a satisfactory Level of Service (LOS) is achieved. Once this process is
completed in the update of the model, the Consultant is to develop the road network
hierarchical system and produce typical cross-sections based on Oman Highway Design
Manual.
Roads, public transportation and active travel The Consultant is required to provide
their methodology for the update of the road network system hierarchy based on
the outcome of the updated NTM model, considering a fully integrated approach
with the urban planning strategy of land use distribution. Development of urban
districts that are structured around high-density and well-connected urban centres
must be included in this methodology, together with the co-friendly modes of
transport development for more sustainable and walkable residential
neighbourhoods.
The Consultant’s methodology must be explicit on how it intends to establish a public
transport network and system (routes, stops and terminals configuration including
pedestrian accessibility, fare policy etc.) and a built environment that favours the
walking and cycling as genuine modes of transport while retaining a role for private
vehicles within the transportation system.
The Consultant is to develop dedicated provisions for active modes of transport with the
view to support a public transport system of various modes as developed in the RSS
study. The Consultant is also to introduce and plan a well-connected pedestrian and
cycling infrastructure and dedicated network at the existing neighbourhood level and
also in close proximity to public transit routes so that most of the short and medium
distance trips are made by these active modes;
The Methodology of using the Transport Model in all stages (stage 2 and 3) should be
clearly explained. For example, it is expected that the model will be used for the typical
MINISTRY OF HOUSING & URBAN PLANNING
VOLUME 2: SCOPE OF SERVICES
HAIMA DETAILED MASTERPLAN
44
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
period in stage 2 for validation and calibration of the base year model (2022) and
analysis of the existing situation, in stage 3 for the assessment of forecasted demand
and future scenarios, testing of alternatives in the system for the concept and detailed
masterplan for the different time horizons.
A parking strategy needs to be developed by the Consultant taking account of the
different land-use distribution and also recommending specific parking control demand
measures as set out in the RSS transport policies. The methodology should be clearly
described considering the identification of supply as a step to realise the gaps and then
propose specific off-street parking stations locations and capacities, P&R facilities etc
The consultant should propose the method and surveys needed to calculate the existing
parking supply and estimate the balance in demand in the future time horizons and
assess car parking requirements.
The handover of the model should report all the details, steps, methodology,
assumptions and calculations used. Manual to be produced including but not limited to
a detailed description of the operations carried out regarding:
● Updating of the national model, ONTM, in terms of infrastructures,
services, land-use, scenarios. It will be specified “what, how and why” of the
modifications
● The procedure of the use of the model
Level of details achieved in the model, such as zoning, road network,
public transport, etc. description, examples and maps should be provided
to clarify all the mentioned topics.
45
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
- Electrical Infrastructure in compliance with the relevant RSS policies including but
not limited to the following:
Design criteria
Load estimate calculation based on the BUA and GFA. The load estimate is to
include the load and diversity factors at the different voltage levels
Location and plot reservation of proposed substations
Proposed upgrade of existing stations if required
Corridor reservation for the different voltage levels
Single line diagrams/schematic diagrams for new and upgraded substations;
Routing for HV and MV cables down to distribution level (11kV);
Sizing for outdoor package substations;
Concept utility disposition drawings showing the arrangement of the utility
corridors based on the various type of roads
− Infrastructure utilities, in compliance with the relevant policies set out in the RSS,
including but not limited to the following:
Routing and sizing for potable water, irrigation, firefighting, wastewater and
storm water pipelines along the roads included in the land use plan
Location, sizing and upgrading of desalination plants
Location and sizing of proposed STPs and upgrading of existing STPs if
needed
Preliminary sizing of TSE reservoirs, and corresponding irrigation network and
pump stations
Location and preliminary sizing of water and firefighting regional and sub-
regional reservoirs and pump stations
Locations and preliminary sizing of sewage lift stations
Discharge location points for storm water drainage networks
46
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Haima will expand and become an integrated urban area in which a comprehensive
approach to the protection of the natural environment and built heritage is needed,
which should include the wider improvement of the towns and villages as attractive,
pedestrian-friendly and visitor welcoming destinations. However, this expansion will put
the sensitive natural and cultural heritage at risk. The HDMP needs to embed
environmental principles and practices into the wider spatial planning
system and sectoral development processes. Also ensure that areas of natural
and cultural sensitivity, terrestrial, are proactively managed and enhanced; and that
future development is integrated into and respectful of Oman’s natural environment and
cultural heritage
A healthy environment is essential for the well-being of Haima residents. To keep the
environment in a good condition, the quality of water and air requires constant
monitoring, as do greenhouse gas emissions and other sources of pollution while
currently data are being gathered for some environmental parameters, there is a need
for a more structured approach. The consultant shall recommend putting in place an
Environmental Monitoring Network that enables the gathering, storing and analysing of
environmental data such as:
− Improving Air Quality
− Noise Management
− Water Quality
47
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
The Huquf and Jiddat al Harassis SPZ which includes the terrestrial
areas of the Huquf and parts of the Jiddat al Harassis.
A small part of the Sharqiyah Sands SPZ that extends into northern
Al Wusta.
A small part of the Dhofar Mountains SPZ that extends into southern
Al Wusta from Dhofar (Al Jazer coast).
The Al Wusta and Masirah SPZ which includes the terrestrial and
marine areas of Bar al Hikman,
Gulf of Masirah and Masirah Island, up to Hijj (Mahawt) in the west
and the Sharqiyah Sands SPZ.
● Within Al Wusta Governorate, the SPZ aims to protect about 13,890 km2 of the
terrestrial area from harmful or unsustainable development (refer to the attached
RSS in the appendix). However, there are certain areas of outstanding
conservation concern, such as remarkable biodiversity value or geological assets,
where all forms of anthropogenic intervention need to be carefully regulated
through the designation of Nature Conservation Areas.
Water resources:
The consultant should ensure the optimum management and use of all water resources
through the following:
● Groundwater Management Plans
Excessive and unsustainable groundwater abstraction potentially leads to
depletion of groundwater
● Technical Assistance for Monitoring Water Sources
● Develop Opportunities for TSE Reuse
48
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
The Consultant should provide an overall strategy for urban sustainability and urban
resilience, that is Informed by the assessment above. The overall strategy should be
aligned with the following:
1. Oman National Spatial Plan Strategic Goal 1: Anticipate, mitigate and adapt to
climate change.
2. Regional Spatial Strategy for the Al Wusta Governorate Spatial Policies
towards 2040: Sustainable Development and Climate Change.
The Consultant shall carry out a high-level climate change impact assessment for
Haima. The assessment shall include but is not limited to, climate-related risks
highlighted in the RSS. At a minimum, it should include an assessment of water
security, increased rain variability, increased temperatures, extreme weather events and
flood risk. It should also outline possible climate resilience approaches.
49
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
50
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
ABBREVIATIONS
51
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
GLOSSARY
1. Sultanate
2. Governorate (Muhafadhat)
3. Wilayat
4. Hila
Agricultural Settlement Small rural settlement which is linked to a sizeable area of natural
or planted agricultural area.
Bottom-up/ Top-down Bottom-up – Ideas originating from ordinary people/ non-
professionals or lower layers of an organisation that can
proactively influence decision-making in an urban context.
Brownfield Land Land (or a defined site) that has been previously developed.
Building Code The term 'building codes' refers to rules/ regulations that set out
the standards to which all buildings and other structures must
conform so as to obtain planning permission, usually from a local
council. The codes cover design, construction, alteration, repair
and maintenance and specify the minimum requirements
necessary to safeguard the health, safety and welfare of building
occupants and the public as well as other impacts on the
environment, efficiency, community, etc. In some countries,
building codes are referred to as 'building regulations'.
Building Regulations Building regulations are a set of standards for design and
construction that apply to alterations of existing buildings and
most new builds. The standards are very in-depth and include
consideration of materials and workmanship requirements,
structural matters, fire safety, sound insulation, energy
52
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Central Business The main business or commercial area of a town or city – area of
District high economic activity.
Committed land (or All land which is allocated for development (particularly
commitments) residential development as part of the Ministry of Housing’s
subdivision plans).
53
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
District Centre Usually comprising groups of shops and some services, separate
from the town centre, but with more variety than local centres.
Can include suburban centres.
Gap Analysis The difference between ‘what there currently is’ against ‘what
there should be’ to implement the planning system
Green Belt Areas of open land surrounding existing built up areas, the
purpose of which is to check the unrestricted sprawl of the built-
up area to safeguard the surrounding countryside against
encroachment. There is a presumption against inappropriate
development with the Green Belt.
Greenfield Land Land (or a defined site) which has not been previously
developed.
Open Space Open space covers all open space of public value, including not
just land, but also inland bodies of water such as rivers, canals,
lakes and reservoirs which offer important opportunities for sport
and outdoor recreation and can also act as a visual amenity.
The following list illustrates the range of open spaces that are of
public value:
54
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
9. civic spaces, including civic and market squares and other hard
surface areas designed for pedestrians.
Peri-urban Formerly rural areas, typically on the fringe, which have been
urbanised, both in a qualitative and quantitative sense.
Public Access The ability for public or open spaces to be easily accessed by the
general public.
55
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Public Space Public space refers to all places publicly owned or of public use. It
is accessible and enjoyable by all for free and without profit
motive. This includes streets, open spaces and public facilities.
(see also Open Space above).
Regulatory Framework A regulatory framework is a model people can use for reforming
and enacting regulations in an effective and logical way.
Policymakers may develop a framework with a specific area of
interest, such as improving development in urban areas, or could
use an existing model to work on a regulatory project. Many
governments rely on such frameworks for handling regulatory
matters and developing flexible and useful networks of
regulations, laws, and rules.
● Regulatory requirements
● Codes of practice
● Regulatory guidance
Rural/ Remote Small settlement away from urban areas. Usually in Oman has
Settlement less than 75 housing units and few facilities, apart from a
settlement mosque
56
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Spatial Development Changes in the distribution of activities in space and the linkages
between them in terms of the use and development of land.
Spatial Planning Spatial planning goes beyond traditional land use planning to
bring together and integrate policies for the development and use
of land with other policies and programmes which influence the
nature of places and how they function.
Special Planning Zones A Special Planning Zone (SPZ) is a proposed new planning
designation which provides greater protection to areas where the
interaction of people and nature over time has produced an area
of distinct character with a combination of significant ecological,
geological, cultural and scenic values. An SPZ does not prevent
development, rather it provides a more stringent framework to
guide development to ensure the unique assets contained within
57
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Under the SPZ system proposed for Oman, areas with rich
environmental assets (especially high-value landscapes) and
which may be sensitive to particular projects, activities or
changes in land use, will be designated SPZs.
Sustainable Places where people want to live and work, now and in the
Communities future.
Urban Area Contiguous areas that include residential development and other
areas to support the residents – industrial areas, schools, health
facilities, etc. Defined as areas with more than 500 housing units.
Urban Fringe The urban-rural fringe, also known as the outskirts, peri-urban or
the urban hinterland, can be described as the "landscape
interface between town and country", or as the transition zone
MINISTRY OF HOUSING & URBAN PLANNING
VOLUME 2: SCOPE OF SERVICES
HAIMA DETAILED MASTERPLAN
58
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
where urban and rural uses mix and often clash. Alternatively, it
can be viewed as a landscape type in its own right, one forged
from an interaction of urban and rural land uses.
Urban Heat Island An urban heat island is an urban/ metropolitan area that is
significantly warmer than its surrounding rural areas due to
human activities. The temperature difference is usually larger at
night than during the day and is most apparent when winds are
weak.
The main cause of the urban heat island effect is due to the
modification of land surfaces. Waste heat generated by energy
usage is a secondary contributor. As a population centre grows, it
tends to expand its area and increase its average temperature.
Wilayat Important administrative area within Oman, that deals with local
issues. Currently, there are 63 Wilayats across Oman. The head
of each Wilayat is the Wali.
Windfall Sites Sites, usually within urban areas, which have not been specifically
identified as available for future development in the local
planning process. They normally comprise previously developed
sites that have unexpectedly become available.
59
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Zoning Guidelines The Zoning Guidelines provide clear definitions for land use
activities within each land use zone, indicating the uses that are
permitted and prohibited in each zone. They spell out the
considerations that must be taken into account if the land use
zone is to be changed, either for an individual plot or parcel of
land within a Local Plan or a broad land-use zoning classification
in the Structure Plan. Zoning guidelines are statutorily
enforceable guidelines used in the preparation of spatial plans
such as Structure Plans and Local Plans as well as permitting of
development.
Urban Interventions
60
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Fourth Industrial The Fourth Industrial Revolution (4IR) is the fourth major
Revolution industrial era since the first Industrial Revolution of the 18th
century. It is characterized by a fusion of technologies that blur
the lines between the physical, digital, and biological spheres
collectively referred to as cyber-physical systems. It is marked
by emerging technology breakthroughs in several fields,
including robotics, artificial intelligence, nanotechnology,
quantum computing, biotechnology, the Internet of Things, the
Industrial Internet of Things (IIoT), fifth-generation wireless
technologies (5G), additive manufacturing/3D printing and fully
autonomous vehicles.
Gulf Cooperation Council The Gulf Cooperation Council (GCC) is a political and economic
(GCC) alliance of six countries in the Arabian Peninsula: Bahrain,
Kuwait, Oman, Qatar, Saudi Arabia and the United Arab
Emirates.
Mineral Resources A potential mineral deposit where the quality and quantity of
material present has not been tested.
National Labour Force The National Labour Force in Oman is the section of the working
population in the age group of 16-64 in the economy currently
employed or seeking employment. People who are in education,
housewives and persons above the age of 64 are not included in
the labour force.
61
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Special Economic A special economic designation is a spatial area which has a set
Designation of preferential policy arrangements in place to attract investors.
This includes the concept of special economic zones, free zones,
bonded warehouses which serve many types of markets and
investors to the integrated tourism complexes which specifically
target tourist activities or urban regeneration corporations/areas
which seek to use preferential policy arrangements to transform
previously developed land in urban areas.
Special Economic Zones A special economic zone is an area in a country that is subject
(SEZ) to unique economic regulations that differ from other regions of
the same country. The SEZ regulations tend to be conducive to
foreign direct investment (FDI). Conducting business in an SEZ
typically implies that the company will receive tax incentives and
the opportunity to pay lower tariffs.
Vision 2040 Vision 2040, which will replace the existing Vision 2020, is the
overarching strategy which aims to guide the Sultanate towards
a sustainable and diversified economy. The vision will follow
three key pillars: people and society, economy and
development, and governance and institutional performance.
Buffer Zone A buffer zone is generally an area that lies between two or more
areas (often, but not necessarily, countries). Common types of
62
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Climate Action Is any activity that helps people cope with a changing climate, or
that results in a decline in climate gas emissions. It includes
mitigation, adaptation and promoting an economic transition to a
low-carbon society through actions by government, businesses,
communities and individuals.
Coastal Special Areas with rich coastal assets and marine habitats, which may be
Planning Zones (CSPZ) sensitive to particular projects or activities, may be designated as
‘Coastal Special Planning Zones’. These Areas may be under
intense development pressure and therefore shall have special
institutional arrangements where rigorous and environmentally
sensitive planning is a priority in order to protect Oman’s most
important coastal and marine assets.
Coastal Zone The coast, also known as the coastline or seashore, is the area
where land meets the sea or ocean, or a line that forms the
boundary between the land and the sea/ ocean. The coastal zone
is considered as the interface area between land and sea; defined
as the part of the land affected by its proximity to the sea
(influence of marine processes), and the part of the sea affected
by its proximity to the land (influence of terrestrial processes).
63
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
64
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Food Security The condition in which all people, at all times, have physical,
social and economic access to sufficient safe and nutritious food
that meets their dietary needs and food preferences for an active
and healthy life.
Food Self-Sufficiency The ability of a country to be able to provide through its own
resources and without external assistance, an adequate food
supply for its residents.
Greenhouse Gases Gases which when emitted into the atmosphere can increase the
likelihood of global warming. Naturally occurring examples
include water vapour, carbon dioxide, methane, nitrous oxide and
ozone. Some human activities increase these gases, including
fossil fuel combustion within motor vehicles and some power
stations.
65
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Important Bird Areas of A compilation of the most important areas in the Sultanate of
Oman (IBAO) Oman for breeding birds, resident as well as migratory, and for
birds that visit the country on passage or in winter. The
compilation is made in a report Prepared by Dr Jens Eriksen for
the Supreme Council for Planning (February 2019). based on
more than three decades of studies throughout Oman by Jens
Eriksen and studies by thousands of other observers. BirdLife has
defined a number of categories for selecting a site as an IBA
(BirdLife 2019) and the relevant categories have been used in
this report http://datazone.birdlife.org/site/ibacriteria.
Important Bird and Important Bird and Biodiversity Areas are key sites for the
Biodiversity Areas conservation of bird species, identified through the BirdLife
(IBAs) International IBA programme.
(https://www.birdlife.org/worldwide/programme-additional-
info/important-bird-and-biodiversity-areas-ibas)
Important Mammal In the context of the ONSS/RSS project refers to key areas used
Area by or determined to be suitable for four flagship species of large
mammal in Oman: the Arabian Tahr (endangered), the Arabian
Gazelle (vulnerable), the Nubian Ibex (vulnerable) and the
Arabian leopard (critically endangered) – making reference to the
66
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Key Biodiversity Area Whilst widely recognised (including by the International Finance
(KBA) Corporation), KBAs and their subsets (IBAs and IPAs) are a non-
statutory designation. There is no government requirement to
identify KBAs and they are not necessarily recognised by local or
national authorities. They are however the most high-profile
designation for areas of importance for biodiversity and can be
used by governments to support protected area designations.
Fletcher, R., Tolley, M., Jones, M., Brauneder, K. (2014)
Protected Areas in IFC Performance Standard 6, UNEP-WCMC,
Cambridge, UK.
67
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Wadi A valley, ravine, or channel that is dry except in the rainy season,
common in desert areas such as in Oman.
Bus Rapid Transit Bus rapid transit (BRT) is a bus-based public transport system
designed to improve capacity and reliability relative to a
conventional bus system. Typically, a BRT system includes
roadways that are dedicated to buses and gives priority to buses
at intersections where buses may interact with other traffic;
alongside design features to reduce delays caused by passengers
boarding or leaving buses or purchasing fares. BRT aims to
combine the capacity and speed of a metro with the flexibility,
lower cost and simplicity of a bus system.
Light Rail Transit Light rail transit (LRT) is a form of passenger urban rail transit
characterized by a combination of tram and metro features.
While its rolling stock is more similar to a traditional tram, it
operates at a higher capacity and speed, and often on an
exclusive right-of-way. A local railway or tram system designated
direct, accessible and sometimes capable of sharing roads with
traffic and heavy railways.
68
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Public Transport Transport services provided for the public on a regular basis by
vehicles such as bus, trams or rail that use specific routes and
schedules and usually on a fare paying basis.
Sustainable Transport Walking, cycling and public transport; modes which are less
damaging to the environment and which contributes less to
traffic congestion than other modes such as the car.
Transport The physical features (for example highways, fixed rail, cycle
Infrastructure routes, stations, interchanges and bus stops) that facilitate the
overall transport network.
Visitor Accessibility Ensuring that venues open for public exhibition are accessible by
different means of transport and that the accessibility needs of
disadvantaged groups – the disabled and those with limited
mobility, wheelchair users, guide dog owners and those who are
visually impaired, young children in prams, those who are hearing
impaired – are taken into account when developing visitor
attractions.
69
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Landfill The permanent disposal of waste into the ground, by the filling of
man-made voids or similar features, or the construction of
landforms above ground level (land-raising).
Municipal Solid Waste Household waste and any other waste collected by a Waste
Collection Authority such as municipal parks and gardens waste,
beach cleansing waste and waste resulting from the clearance of
fly-tipped materials.
Renewable Energy Energy from a source that is not depleted when used, such as
wind or solar power.
Residual Waste Waste remaining after materials for re-use, recycling and
composting have been removed.
70
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Other
Data Capture Scale at which data should be captured during area surveys.
Key Drivers The most important catalysts for growth and/or change in Oman.
Clustered together for the purposes of ONSS as socio-economic
dynamic drivers and Urbanisation drivers. These clusters of key
drivers form the basis of the two-axis model.
Strategic Goals The agreed objectives or desired outcomes of the ONSS project,
which have been agreed by MCE, PMT and RSS consultants. The
strategic goals are: liveable communities, sustainable land use,
adaptation to climate change, preservation of Omani cultural
identity, governorate compatibility and complementarity,
sustainable use of resources, and economic diversification.
71
HAIMA DETAILED MASTERPLAN
CONSULTANCY SERVICES FOR THE PREPARATION OF HAIMA DETAILED MASTERPLAN
______________________________________________________________________________________________________
Windshield Survey A technique used when undertaking land use surveys. Areas are
viewed through driving through areas rather than more detailed
on-site surveys. Often used for verification of desk surveys.
72