KTSS HE Project

(Tentative Elevations and Lengths of Proposed Alternatives)


Right bank Left bank
S.No. Proposed Levels Stage -I stage-II
(Single stretch) (Full length)
1 Bed Level EL. 1760 1560 1760 -
2 Reservoir level EL. 1960 1660 1960 -
3 MDDL EL. 1925 1640 1925 -
4 Intake invert level EL. 1900 1610 1900 -
5 HRT length (kM) 4.70 10.20 22.50 -
6 Surge shaft invert level EL. 1886 1580 1830 -
7 Pressure shaft plan length (m) 760 2800 4100 -
8 Tail water length (m) 600 1460 1500 -
9 Tail water level (El.) 1690 610 610 -