Professional Documents
Culture Documents
CONSTRUCTION PLAN
JANUARY 2019
CONSTRUCTION PLANS
LUZON
VISAYAS
MINDANAO
LOCATION MAP
VICINITY MAP
BRIA HOMES EXECUTIVE CALAMBA BRIA HOMES INC. INDEX OF DRAWINGS
CALAMBA, LAGUNA Lower Ground Floor, Starmall, Shaw Blvd., Mandaluyong City
ENGINEERING
CONSTRUCTION PLAN
TECHNICAL DESCRIPTIONS JANUARY 2019
LINES BEARINGS DISTANCES
LOT 396-A LOT 367-B-1-A
1 2 S 27°32' E 98.69 m. 1 2 N 21°53' W 45.16 m.
2 3 S 27°48' E 55.30 m. 2 3 N 61°34' E 3.70 m.
3 4 S 72°25' W 4.00 m. 3 4 N 65°02' E 86.17 m.
4 5 N 27°39' W 139.01 m. 4 5 S 22°19' E 51.28 m.
5 6 N 27°39' W 14.46 m. 5 1 S 68°48' W 90.12 m.
6 1 N 64°48' E 4.00 m. LOT 367-B-1-B
LOT 396-B 1 2 N 65°02' E 3.00 m.
1 2 N 60°30' E 22.52 m. 2 3 S 22°20' E 51.48 m.
2 3 S 27°39' E 139.01 m. 3 4 S 68°48' W 3.00 m.
3 4 S 72°25' W 20.47 m. 4 1 N 22°19' W 51.28 m.
4 1 N 28°39' W 134.72 m. LOT 367-B-2
LOT 355 1 2 N 44°34' W 82.65 m.
1 2 N 26°49' W 18.20 m. 2 3 N 68°48' E 93.12 m.
2 3 N 23°57' W 158.42 m. 3 4 S 22°20' E 63.66 m.
3 4 N 44°49' E 62.08 m. 4 1 S 57°35' W 62.80 m.
4 5 S 27°09' E 142.80 m. TIE LINES from Mon. 5, Calamba 4
5 6 S 31°13' E 34.61 m. cadastre to corner "1"
6 7 S 31°42' W 61.30 m.
7 1 N 80°28' W 22.33 m.
LOTS BEARINGS DISTANCES
396-A S 52°54' W 6180.99 m.
LOT 359
396-B S 52°49' W 6209.59 m.
1 2 N 50°20' E 50.57 m.
355 S 50°27' W 5809.63 m.
2 3 S 23°57' E 158.42 m.
359 S 52°07' W 5816.88 m.
3 4 S 63°10' W 49.69 m.
361 S 50°27' W 5809.65 m.
4 5 N 29°46' W 19.38 m.
364 S 49°42' W 5982.71 m. 3
5 6 S 66°37' W 30.52 m.
365 S 49°42' W 5982.71 m. 2
6 7 N 26°04' W 119.36 m.
366 S 50°09' W 6177.43 m.
7 8 N 56°15' E 13.16 m.
367-A S 50°04' W 6111.12 m.
8 1 N 52°13' E 25.60 m.
368 S 51°57' W 6052.14 m.
LOT 361 393 S 51°15' W 6107.43 m.
1 2 S 55°48' W 106.02 m. 394 S 51°15' W 6107.43 m.
2 3 S 55°30' W 29.00 m. 401 S 50°43' W 6411.67 m.
3 4 S 84°30' W 13.00 m. 1
402 S 50°43' W 6411.87 m.
4 5 S 85°48' W 72.85 m. 367-B-1-A S 50°50' W 6118.35 m.
5 6 N 21°52' W 46.51 m. 367-B-1-B S 51°02' W 6017.80 m.
6 7 N 70°29' E 21.42 m. 367-B-2 S 50°04' W 6111.12 m.
8
7 8 N 63°21' E 16.41 m. 354-A S 52°07' W 5816.61 m.
7
8 9 N 75°20' E 92.48 m. 415 S 53°15' W 5814.43 m.
9 10 N 66°37' E 30.52 m.
10 11 S 29°46' E 19.38 m. LOT 355
Pcs-5250
11 12 N 63°10' E 49.69 m. A=11,8917 SQ.M.
12 1 S 26°49' E 18.18 m.
LOT 364 5
1 2 S 64°14' W 71.25 m. LOT 359
2 3 N 26°48' W 13.11 m. Pcs-5250
A=11,877 SQ.M.
3 4 N 22°20' W 115.14 m.
4 5 N 85°48' E 72.85 m.
5 6 S 17°39' E 28.90 m. 6
6 1 S 26°31' E 72.66 m.
LOT 365
1 2 S 33°28' E 119.34 m.
2 3 S 51°12' E 25.44 m.
3 4 S 04°32' W 21.10 m.
4 5 S 20°59' W 32.00 m. 3 2
5 6 S 54°28' W 52.20 m. 5
6 7 N 65°10' W 23.08 m. 12
7 8 N 25°08' W 172.38 m. 10 1
6
8 1 N 64°14' E 71.25 m. 1 7
4
LOT 366 9
1 2 N 57°35' E 129.86 m. 3
11
2 3 S 26°48' E 13.11 m.
2
3 4 S 25°08' E 172.38 m.
4 5 S 65°10' E 23.08 m.
5 6 S 63°20' W 101.40 m. 8
1
6 7 N 63°56' W 99.90 m. 6 1
7 8 S 59°03' W 22.30 m. 5 7 LOT 361
4 6 Pcs-5250
8 9 S 42°55' W 59.60 m.
A=10,206 SQ.M.
9 10 S 47°30' W 15.00 m. 2 8
10 11 N 17°17' W 27.68 m. 1 2
11 12 N 20°05' W 68.16 m.
12 13 N 72°09' E 94.14 m. LOT 368
N 16°41' W Pcs-5250
13 1 57.75 m.
LO
A=8,210 SQ.M.
LOT 367-A 7 4 3
T
39
1 2 S 57°35' W 67.06 m. 5 5 5
6-
5
A
2 3 N 29°48' W 78.37 m. 4
,P
4
1 2
sd
3 4 N 54°29' E 46.16 m.
-0
4 1 S 44°34' E 82.65 m.
4-
18
LOT 368
85
Ps 2,91
LO 4-1 SQ.M
A=
1 2 N 65°22' E 41.95 m.
59
d-
6
T 3 885 .
LOT 367-B-1-B
0 7
2 3 N 65°26' E 19.95 m.
A=
Psd-04-168748
96
4 6 6
6S
5 6 S 65°02' W 89.16 m.
.M
A=4,346 SQ.M.
N 32°40' W
5 LOT 364
7 8 31.15 m.
Pcs-5250
8 1 N 64°58' E 40.48 m. 3 A=7,930 SQ.M.
LOT 393
1 2 S 21°53' E 45.16 m.
2 3 S 54°29' W 46.16 m.
3 4 S 66°23' W 50.39 m. 2 1
4 5 N 26°41' W 55.09 m. 43 3 LOT 393 2
3 5 2
5 1 N 66°35' E 99.86 m. 4 Pcs-5250
A=5,136 SQ.M. 4 1
LOT 394 LOT 367-B-2
1
1 2 S 66°35' W 99.86 m. Psd-04-102086
A=5,500 SQ.M.
2 3 S 63°24' W 7.28 m.
3
3 4 N 27°48' W 55.30 m. 3 4
4 5 N 66°29' E 108.00 m. 3
2 2
5 6 S 30°46' E 55.05 m.
6 1 S 61°34' W 3.70 m. 8
4 3
LOT 401 LOT 367-A
(LRC) Psd-309716
1 2 N 62°11' E 105.67 m. A=4,509 SQ.M.
2 3 S 49°50' E 56.69 m. 1
3 4 N 65°11' E 11.39 m. 1
4 5 S 20°05' E 68.16 m.
5 6 S 17°17' E 27.68 m.
6 7 S 47°30' W 39.80 m.
7 8 S 57°06' W 97.00 m.
8 9 N 20°37' W 20.78 m.
9 1 N 24°30' W 146.20 m.
2
LOT 402
1 2 S 24°30' E 146.20 m. 1
LOT 365
2 3 S 20°37' E 20.78 m. Pcs-5250
3 4 S 57°06' W 23.00 m. A=15,259 SQ.M.
2
4 5 N 81°20' W 31.30 m.
5 6 N 43°49' W 180.00 m.
6 7 N 63°06' E 87.46 m. 3
7 8 N 60°05' E 21.60 m.
8 1 S 27°02' E 22.42 m.
4
LOT 366
2 13 Pcs-5250
A=32,304 SQ.M.
8 12
4
3 7
7
1 4 6
1 7
5
8
LOT 401
Pcs-5250 11
A=20,862 SQ.M. 5 6
9
10
6
LOT 402
Pcs-5250
A=14,444 SQ.M.
9
2
8
3
5
4
01 LOCATION PLAN
- 01 SCALE 1:1000 M
LOCATION PLAN
31
34
35
35
30
29
35 4
35
30
35
3
DI
2
RT
RO
AD
32
1
35
8
32
35 7
30
39
35
15
LOT 355
Pcs-5250
35 A=11,8917 SQ.M.
40
35 5
40
LOT 359
Pcs-5250
AD
A=11,877 SQ.M.
O
TR
DIR
35
45
35
35
3 2
5
47
12
35
D 10 1
45
A 6
RO
ON
C. 49 1 7
C 4
46 30
9
35
3
11
45 2 40 30
35 25
20
50
D 1 8
35
A
. RO 6 1
NC 5 7 LOT 361
CO 6 40
4 Pcs-5250
A=10,206 SQ.M.
2 8
49
25
1 40 2
40 35
30
LOT 368
DI
30
RT
Pcs-5250
RO
LO
A=8,210 SQ.M.
AD
7 4 3
T
35
35
39
5 45 5 5
6-
5
A
4 35
,P
4
1 2
sd
-0
4-
18
AD
85
O
Ps 2,91
TR
LO 4-1 SQ.M
A=
DIR
59
d-
6
T 3 885 .
LOT 367-B-1-B
0 7
A=
Psd-04-168748
96
4 6 6
6S
Pcs-5250 gate
5
1
WT
50 40
.M
1 2 Psd-04-168748
4 3
.
A=4,346 SQ.M.
5
40
LOT 364
45
Pcs-5250
3 A=7,930 SQ.M.
40
2 1
43 3 LOT 393 2
3 5 2
4 Pcs-5250
A=5,136 SQ.M. 4 1
LOT 367-B-2
Psd-04-102086
1
A=5,500 SQ.M.
3
53 3 4
3
45 2 2
45
8
52
4 3
LOT 367-A
(LRC) Psd-309716
A=4,509 SQ.M.
1
1
30
40
35
35
40
2
45
1
LOT 365
50
Pcs-5250
A=15,259 SQ.M.
50 2
3
50
4
55
LOT 366
2 13 Pcs-5250
A=32,304 SQ.M. 50
51
50
53 55
12
4
3 7
55 7
1 4 6
1 7 50
50 5
45 45
55
8
40
40 50
55 40 35
6 45 40
45
55 LOT 401 50
Pcs-5250 11
5
58
A=20,862 SQ.M. 6
45
55
9
50
10
6
LOT 402 L E G E N D
Pcs-5250
A=14,444 SQ.M. BOUNDARY LINE
1
58
7 MAJOR CONTOUR 100
50
MINOR CONTOUR 99
45
59
55 55 CONCRETE ROAD
58
59 45
STRUCTURE/HOUSE
59
9
2 50 ELECTRICAL POST
EP
55
TELEPHONE POST
8 TP
3
5 B. WIRE FENCE x x x x x x x x x x x
45 4
C.H.B. FENCE
50 45
55
50
55 57
01 TOPOGRAPHIC PLAN
- 02 SCALE 1:1000 M
TOPOGRAPHIC PLAN
LEGEND
BRIA HOMES EXECUTIVE CALAMBA BRIA HOMES INC.
CALAMBA, LAGUNA Lower Ground Floor, Starmall, Shaw Blvd., Mandaluyong City
ENGINEERING
CONSTRUCTION PLAN
JANUARY 2019
D
EXCLUDE
= 3 ,9 93
AREA
RESERVED
A=22,027
7
18
1,
=
EA
AR
ED
UD
CL
EX
1
BLO
CK
0 06
1,
NA
L
E A=
OR
CA AR
PT GULLEY D
RC
E
65 AD DE
MENT=1,0
EA
TE SE 6 U
CL
6
IN 4 ME
CR OA CH O =1
3 EN R A
EX
NT
A= 2 T
CK A= R EN
BLO RIPRAP 4 41
E TE SEM
EA
A=29 M
OS=127 OS=356 10
3
CK
BLO
OS=303
2
CK
AN
AL BLO
ORC
PT
R CE
TE
IN 8
5
A=
1
CK
BLO
RI
GH
AD
RO
TO
R
TE
ME 5
FW
CK
4 1 0 CK
BLO BLO
8M
AY
O AD
RR
ET
K1
OS=103 TE K6
E
ME
C
OPEN SPACE C AD
RR
BLO
BLO
0 RO
A=1503 6.5 ER
OA
T
0 ME
D
6.5 7
CK
BLO
AD
RO
E R AD
ME
T
R RO
12 OS=233 T E
0 ME
6.5
6
CK
8
BLO
M
ET
ER
OS=104
AD
RO
RESERVED RO
AD
T ER
A=9,645 ME
0
6.5
5
CK
BLO
AD
RO
TER
M E
0 8
6.5 CK
2
BLO
K1
AD
RO
C
ER
LO
ET
B
.5 0M
6
8
K9
ME
C
BLO
TE
R
4
K1 AD
LO
C RO RO
B
E TER AD
BLOCK 5
0M
6.5 8
CK
T
W 2 BLO
29
AD
RO
T ER
ME 5
6.5
0 CK
6.5 BLO
0M
AD
RO
ETE
ER
BLOC
T
ME
8M
RR
0
6.5 CK
1 0
K 13
ETE
BLO
OAD
RR
AD
RO
OAD
E R
T
ME 1
0 K1
4 6.5 BLO
C
6. CK 1
50 BLO
1 4
CK M
ET
BLO ER
CK 5
D D
R OA RO
ROA
AD
BLO
R ER
TE MET CE
ME 0 PA
0 15 6.5 E N S 387
CR
CK OP =2,
6.5 BLO
A
EE
AD KE O AD
K1
4 RO RR
BLO
C
TE
R NC E TE
AD 0M
E
17 RO 50M
BLOC
. 5 CK AC 6 .
RO 6 BLO H
R ME
TE
K
ME NT
3
15
85
.50
1,
=3
A=
6
,4
T
EN
T 59
M
W 4
SE
6.
27
EA
6.
5
0
50
M
6.
ET
M
50
ET
16
ER
K
M
ER
6.
OC
ET
RO
50
BL
RO
ER
AD
BL
M
AD
OC
ET
BL
RO
BL
K
OC
ER
6.
OC
AD
17
6.
K
50
RO
15
50
18
6.
AD
50
M
ET
ET
ER
M
ER
ET
BL
RO
BL
ER
RO
OC
OC
AD
K
BL
AD
3
RO
19
82
OC
18
AD
,
K
8
14
AD
R
RO
A =
M ET
E
A RE
0
6.
5 D
DE
C LU
E X
L E G E N D
GV
D
EXCLUDE
SSC
RESERVED
EA
AR
ED
UD
CL
EX
1
CK
BLO A
E
NAL AR
CA ED
OR VC UD
ER
CE
PT
m ØP GULLEY C L
HMENT EX
50m
T
ENCROAC
EA
IN SE
ME T
A
C K2 NT
EM
EN
BLO VC
A S
RIPRAP EA
PVC mØP
mØ OS 75m OS
50m
100m
3
CK
BLO
PVC
mØ
OS
Ø 2
CK
AN
AL
50 mm BLO
PVC
ORC
PT
CE
IN
TE
R
P VC
mØ
150m
75m CK
1
BLO
Ø PVC
mØ
m P VC
50m mØ
VC Ø PVC m
PVC
CK
4 ØP 75mm 150 C K5
BLO mm BLO
50 Ø PVC
VC 75 mm
K1
P OS=103 K6
mØ
C
50m VC
P
mØ
150
50m 7
CK
mm
BLO
PVC
Ø
Ø
mm
PVC
OS 50
15
75
0m
m
6
CK
m
m BLO
Ø
Ø
PV
PV VC OS
C
RESERVED C P
mØ
50m
5
CK
BLO
15
PVC
0m
Ø
mm
mØ
75
8
PV
CK
2
BLO
K1
C
C
PVC
LO
Ø
B
75mm
C K9
BLO
K1
4
P VC 10
75mmØ PVC
LO
C
mØ 0 mm
50m
B
BLOCK 5
ØP
C
Ø PV
150mmØ PVC
8
CK
VC
W
T BLO
PVC
mm
Ø
50 mm
150
5
C
CK
PV
BLO
mØ
Ø PVC
mm
BLOC
PVC
75m
75 0
1
CK
K 13
VC
mmØ
BLO
mØ P
PVC
150
Ø
mm
150m
50 1
C K1
4 BLO
CK 1 VC
BLO P
K1
4 Ø
BL OC
VC
150mmØ mm
50
PVC
PVC
ØP
CK 5
PVC
mm
150
BLO
mØ
E
AC
mØ
50m
SP
5
K1 PE
N
CR
75m
O
C
BLO EE
50m
150m
VC KE
mØ P
K1
4 VC
C ØP NC mØ
P
C
BLO VC mm RO
PV
P 75 50m
mØ P
7
K1
VC
BLOC
mØ AC
mØ
PVC
C
m BLO H
150 mØ ME
0m
K
VC
50m NT
15
15
T
EN
M
SE
T
EA
W
75
m
m
16
Ø
50
K
75
OC
PV
m
m
BL
C
m
BL
m
15
Ø
OC
Ø
BL
BL
0m
PV
K
OC
PV
OC
17
C
K
m
C
50
15
Ø
18
m
PV
m
C
Ø
15
75
PV
BL
0m
BL
OC
C
OC
K
BL
Ø
K
19
OC
18
PV
K
PV
A
14
E
C
C
PV AR
m mØ E D
50 UD
C L
EX
A
LEGEND
BRIA HOMES EXECUTIVE CALAMBA BRIA HOMES INC.
CALAMBA, LAGUNA Lower Ground Floor, Starmall, Shaw Blvd., Mandaluyong City
ENGINEERING
CONSTRUCTION PLAN
JANUARY 2019
L E G E N D
GV
D
EXCLUDE
SSC
D
RESERVE
EA
1-50mmØ Tee
AR
ED
1-75x50mmØ Reducer Tee
UD
1-75x50mmØ Reducer
CL
EX
1-90° 50mmØ Bend
1-45° 75mmØ Bend
1-150mmØ Fire Hydrant
1
CK
BLO A
E
NAL AR
CA ED
OR VC UD
1-50mmØ Tee ER
CE
PT
m ØP GULLEY C L
HMENT EX
50m
T
ENCROAC
EA
IN SE
ME T
A
K2 NT EN
1-75x50mmØ Reducer Tee BLO
C
RIPRAP
VC
A
EA
S EM
100m
3
CK
BLO
1-45° 75mmØ Bend
PVC
mØ
OS
1-45° 50mmØ Bend Ø CK
2
AN
AL
50 mm BLO
PVC
ORC 1-150mmØ Tee
PT
CE
INT
ER
PVC 1-150x75mmØ Reducer Tee
mØ
150m
75m CK
1 3-150x50mmØ Reducer Tee
BLO
Ø PVC 1-100x75mmØ Reducer Tee
mØ
m P VC
50m mØ
VC Ø PVC m 1-100x75mmØ Reducer
PVC
CK
4 ØP 75mm 150 C K5
BLO mm BLO 1-150x100mmØ Reducer
50 Ø PVC
VC mm 3-150mmØ Gate Valve
75
K1
P OS=103 K6
mØ
C
50m VC
P
mØ
150
50m 7
CK
mm
BLO
PVC
Ø
Ø
mm
PVC
OS 50
15
75
0m
m
6
CK
m
m BLO
Ø
Ø
PV
1-75mmØ Tee PV VC OS
C
15
PVC
0m
4-45° 150mmØ Bend Ø
mm
mØ
1-150mmØ Fire Hydrant 75
8
PV
CK
2
BLO
K1
C
C
PVC
LO
Ø
B
75mm
C K9
BLO
1-150mmØ Tee K1
4
P VC 10 1-100x50mmØ Reducer Tee
75mmØ PVC
LO
C
mØ 0 mm
1-75mmØ Tee B
50m 1-100x75mmØ Reducer Tee
BLOCK 5
ØP
C
150mmØ PVC
8
CK
VC
T BLO
2-90° 75mmØ Bend W
1-100x75mmØ Reducer
PVC
mm
CK
1-100mmØ Fire Hydrant
PV
BLO
mØ
75m
VC
BLO
1-90° 75mmØ Bend
mØ P
Ø
1-90° 50mmØ Bend mm
150m
50 1
1-75x50mmØ Reducer K1
50m
C
4 BLO
CK 1 VC
1-90° 50mmØ Bend BLO
50m
P
mØ
K1
4 Ø
2-45° 75mmØ Bend BL OC
VC
150mmØ mm
50
mØ
PVC
50m
PVC
ØP
CK 5
PVC
mØ
mØ P
E
AC
mØ
50m
SP
5
K1 PE
N
CR
75m
O
C
BLO EE
50m
150m
VC
VC KE
mØ P
K1
4 VC 4-50mmØ Tee
C ØP NC mØ
P
C
BLO mm
PVC RO
PV
7
K1
VC
BLOC
Ø AC
mØ
mm PVC
C
BLO H
150 mØ ME 1-45° 75mmØ Bend
0m
K
VC
50m NT
15
15
T
EN
M
SE
T
EA
W
75
m
m
16
Ø
50
K
75
OC
PV
m
m
BL
C
m
BL
m
15
Ø
OC
Ø
BL
BL
0m
PV
K
OC
PV
1-150mmØ Tee
OC
17
C
K
m
C
50
15
Ø
18
2-75x50mmØ Reducer
m
PV
m
2-150mmØ Tee
C
Ø
75
PV
BL
BL
OC
K
BL
19
OC
18
PV
PV
A
14
C E
C
V
ØP AR 2-150mmØ Gate Valve
0 mm E D 2-150x75mmØ Reducer Tee
15 UD
L 1-150x50mmØ Reducer Tee
C
EX 1-45° 75mmØ Bend
1-150mmØ Tee
1-150x50mmØ Reducer Tee
1-150x75mmØ Reducer Tee
2-45° 150mmØ Bend
1-150mmØ Fire Hydrant
2-150mmØ Gate Valve
L E G E N D
Proposed Drainage Line
Manhole MH EXCLUDE
D
Outfall
EA
AR
ED
UD
CL
EX
SIM
K1
450
450
C SIM
BLO SIM
A
E
450
N AL 375 300 AR
ED
300
SIM
CA SIM
OUTFALL TO CREEK
SIM
SIM
OR UD
450
75
CE
PT S IM3
IM3
00 450 MM Ø RCP GULLEY C L
ER HMENT EX
S
T
ENCROAC
SIM
IN
SIM
375
SIM 450 450 EA A
SIM SE T
450
450
K2 EN
50 ME
IM4 SIM NT
C S EM
SIM
375
SIM 00
BLO SIM RIPRAP 300
SIM EA
S
375
S IM3 300
450
300 SIM
300
SIM
300
OS
SIM3
OS
SIM
SIM
SIM
SIM
SIM
75
300
450
300
300
00 SIM 75
IM3 3 IM3
S
CK S
BLO
SIM
SIM3
SIM 300
450
50 3 75
S IM4 SIM
00
OS
SIM
SIM
SIM
300
375
300
300
CK
SIM
300
SIM SIM
300
AN
AL BLO 450
SIM
SIM
SIM
RC 375 SIM
SIM 300
O SIM
300
300 300 SIM
300
SIM
PT
300
SIM
R CE
TE 375
SIM
300
SIM
300
IN SIM
300
300
SIM
SIM SIM
300
SIM
300
SIM
SIM
300
300
300
SIM
375
300 SIM
300
300
SIM
SIM
1
SIM
SIM
SIM
CK
3
300
00
300
450
SIM
SIM
BLO SIM
750
300
300
375
SIM
SIM
SIM
SIM SIM
SIM
300
OUTFALL TO CREEK
300
SIM 300 00
300
SIM
SIM
375 SIM 3
300
300
SIM
3
300
SIM
00
750 MM Ø RCP
0
SIM
60
SIM
SIM
SIM30 SIM
300
SIM
300
375 300
0
SIM 300 0 300 K5 SIM
SIM
SIM 4 SIM30
K SIM30
0 300
SIM C
LOC BLO
SIM
SIM 600
375 B 600
SIM
SIM
300 300
SIM 300 300 SIM
375
SIM
SIM
300 300
SIM
SIM
SIM
K1
SIM 300
300
OS=103
300
300
300
OPEN SPACE
SIM
SIM SIM
BLO
300
BLO
SIM SIM
300 SIM 300
300
300
300
SIM
SIM
SIM
300 SIM30 300 SIM
300
SIM
0 SIM
600
300
0
600
SIM
30
SIM
SIM
3
300 SIM
300 00
SIM
SIM 7
SIM30
SIM30
CK
0
SIM300
BLO
0
30 SIM
SIM
300
SIM
300
300
0
300
300
0
SIM300
30 SIM
SIM
SIM
SIM SIM
300
SIM
SIM
300 300
300
30
SIM
SIM
0
00
SIM
3
SIM
OS
6
SIM
0S0IM
0 300
30
300
SIM300 300
0
0
30
SIM 30 SIM
3
SIM
SIM
SIM
75
SIM300
SIM
SIM
SIM SIM
30
6
SIM
30
300
300
CK
50 4
0
300 300
0
30
SIM
BLO SIM
SIM
450
SIM
300
0
SIM
30
SIM OS
SIM
30
SIM
RESERVED
0
37
SIM
5
450 SIM
300
375
0
375
30
SIM
SIM
5
SIM
37
SIM
SIM
SIM
450 SIM
300
SIM375
300
30
SIM
SIM
300
0
37
SIM
0
SIM300
5
5
45
OCK
SIM
300
SIM
SIM BL
300
3 00
SIM
SIM
375
0
300 300
30
SIM
SIM
SIM
SIM
300
300
SIM SIM
300
300
SIM
8 SIM
CK
SIM300
300
300
2
SIM
BLO
K1
SIM
0
3
C
300
00
30
SIM
LO
SIM
SIM
SIM
300
300
0
SIM375
B
30
SIM
30
SIM
0
00
SIM
IM3
300
S SIM
300
300
C K9 SIM
IM3
00
BLO
SIM300
SIM
S SIM
00
300
M3
300
30
SIM
SIM
0
SI
1 30
00
SIM375
SIM300
0 3
CK SIM
SIM375
SIM SIM
LO
300 300
00
B 30
0 S IM3
BLOCK 5
300
0
300
30
0
SIM
30
30
8
SIM
CK
0
SIM
BLO 300
SIM
SIM300
SIM300
300
SIM
SIM
3
300
00
SIM300
300
SIM
SIM 300
SIM
300
300
SIM300
SIM
SIM375
SIM 0
SIM
SIM 300 30
300
SIM300
SIM
300
SIM300
SIM
SIM
3 00 375
SIM
SIM
SIM 300
300
5
CK 3 00
00 BLO SIM
OUTFALL TO RIVER
SIM300
3
SIM
SIM300
SIM
375 MM Ø RCP
00
300 375
SIM3
SIM300
SIM3
300 3 00
300 SIM SIM
SIM
00
BLOC
SIM
300 1 0
CK
00
300
K 13
SIM SIM
SIM
BLO
SIM 300
300
00
IM3
SIM3
S
0
SIM3
IM30
300
7
SIM
00
SIM3
SIM
SIM 300
00
S
00 3
300
SIM SIM SIM
300
300 30
00
SIM
SIM 0
SIM3
300
1
0
SIM300
SIM3
00
K1
0
SIM3
IM3
SIM3
300 SIM S C
BLO
SIM3
SIM
SIM
00
300
SIM3
30
00
4
00
300
CK 1 SIM
0
SIM3
00
SIM3
SIM3
00
BLO
SIM3
00
00
SIM
75
00
0
00
300
SIM3
30
00
4 300
SIM3
1
SIM3
SIM
SIM
300
SIM3
SIM
CK
SIM 300
00
SIM
300 SIM
BLO
SIM3
SIM3
30
00
SIM3
SIM 0
0
SIM 300
CK 5
0
SIM
SIM 300
00
SIM3
00
300
00
30
00
00
SIM3
00 0
SIM3
M3
SIM3
SIM3
0
SIM3
SI 30
SIM3
BLO
SIM
00
SIM 30S0IM
0 0
00
SIM3
300
E
00
SIM3
00
SIM
AC
SIM
SP
300 SIM300
5
30
00
K1
N
CR
0
3
SIM PE
SIM3
SIM300 O
C
00
0
EE
30
BLO
SIM3
SIM3
SIM
SIM
SIM
SIM
00
00
00
0
KE
300 300 SIM
SIM
30
SIM 0
M3 30 SIM
SIM3
30
SIM
4
SIM3
SI
SIM
300
00
K1
30
30 30
SIM
0
0
0 0S
30
300
C NC
IM
300
0
00
SIM
00
BLO
30
SIM
SIM3
SIM3
RO
SIM SIM
300 300
7
SIM
00
K1
00
0
BLOC
300
AC
300
30
SIM3
SIM
SIM3
SIM C
SIM
300
BLO
300
00
SIM 300
H
SIM
SIM3
00
SIM3
ME
300
SIM
SIM
SIM3
SIM
0
300
30
300
K
300
30
0
SIM
SIM
NT
SIM
0
0
SIM
15
00
SIM
300
30
300
SIM
T
0
EN
SIM
300
00
SIM
SIM
M3
00 3 SIM300
SI
SE
30
0
30
0
300
EA
30
SIM
SIM
SIM
SIM
30
SIM
SIM
30
SIM
SIM
30
0
300
30
SIM300
SIM
0
SIM
SIM
30
0
300
SIM
30
30
0
0
SIM
0
30
00
0
30
SIM
SIM
30
3
SIM
SIM
0
16
SIM
SIM
30
SIM
0
30
30
0
30
K
0
SIM
30
0
30
SIM
SIM
0
OC
0
0
SIM
30
30
30
0
0
30
SIM
BL
0
SIM
SIM
BL
0
30
SIM
30
0
OC
45
0
BL
30
SIM
SIM
30
45
BL
SIM
SIM
SIM
SIM
K
OC
30
OUTFALL TO RIVER
SIM
0
OC
30
0
SIM
30
17
0
SIM
30
30
SIM
K
0
450 MM Ø RCP
0
30
SIM
30
15
0
0
18
0
30
SIM
SIM
0
30
0
30
SIM
SIM
30
0
SIM
SIM
SIM
30
SIM
00
SIM
0
30
SIM
30
0
3
30
30
BL
SIM
37
0
0
30
SIM
5
BL
OC
0
OC
0
K
0
BL
30
30
SIM
19
SIM
OC
18
SIM
SIM
SIM
SIM
K
SIM
30
0
30
A
30
30
SIM
30
0
14
00
30
0
SIM
0
E
37
0
3
0
SIM
AR
0
30
0
30
SIM
SIM
D
SIM
E
30
SIM
SIM
0
SIM
UD
30
SIM
30
0
30
30
0
0
0
30
SIM
L
0
C
0
30
EX
SIM
30
SIM
SIM
SIM
0
300
30
30
SIM
0
SIM
00
375
3
SIM
SIM
SIM
375
30
SIM4
0
50
OUTFALL TO RIVER
450 MM Ø RCP
D
EXCLUDE
RESERVED
EA
AR
ED
UD
CL
EX
1
CK
BLO A
E
NAL AR
OR
CA ED
CE
PT GULLEY LUD
ER C
T HMENT EX
ENCROAC
EA
IN SE
ME T
A
C K2 NT
EM
EN
BLO
A S
RIPRAP EA
OS OS
3
CK
BLO
OS
2
CK
AN
AL BLO
ORC
PT
R CE
TE
IN
1
CK
BLO
K4 C K5
BLO
C BLO
K1
OS=103 K6
C
7
CK
BLO
OS
6
CK
BLO
OS
RESERVED
5
CK
BLO
8
CK
2
BLO
K1 C
LOB
C K9
BLO
4
C K1
BLO
BLOCK 5
8
CK
W
T BLO
5
CK
BLO
BLOC
10
CK
K 13
BLO
1
C K1
4 BLO
CK 1
BLO
1 4
CK
BLO
CK 5
BLO
E
AC
SP
5
CK1 OPE
N
CR
BLO EE
K1
4 KE
BLO
C NC
K1
7 RO
BLOC
BLO
C AC
H ME
K
NT
15
T
EN
M
SE
T
EA
W
16
K
OC
BL
BL
OC
BL
BL
K
OC
OC
17
K
K
15
18
BL
BL
OC
OC
K
BL
19
OC
18
K
A
14
E
AR
E D
L UD
C
EX
ROAD PROFILES
ROAD PROFILE
ROAD PROFILES
ROAD PROFILE
ROAD PROFILES
ROAD PROFILE
04 ROAD SECTIONS
- 07D SCALE 1:1000 M
ROAD SECTIONS
EXPANSION JOINT
SCALE NONE
ROAD-WAY DETAILS
SCALE 1 : 1000m
ROAD-WAY DETAILS
150
TRENCH DETAIL
SCALE NONE
OUTFALL DETAIL
SCALE NONE
TRENCH PLAN DETAIL TONGUE & GROOVE CONC. PIPE - JOINTING DETAIL
SCALE NONE
SCALE NONE
0.30
PIPE DETAILS
PIPE DETAILS
LEGEND:
2m ht.
RIPRAP
1.5m ht.
RIPRAP
1.0m ht.
RIPRAP
EA
AR
ED
RC Wall-Housing Adt'l
UD
CL
0.5m Exp ht.
EX
RC Wall-Housing Adt'l
1
CK
BLO A
E
AR
ED
GULLEY LUD
C
HMENT EX
ENCROAC
EA A
SE T
K2 EN
ME
NT
C EM
BLO RIPRAP EA
S
OS OS
3
CK
BLO
OS
2
CK
BLO
1
CK
BLO
K4 C K5
BLO
C BLO
K1
OS=103 K6
C
7
CK
BLO
OS
6
CK
BLO
OS
RESERVED
5
CK
BLO
8
CK
2
BLO
K1 C
LOB
C K9
BLO
4
C K1
BLO
BLOCK 5
8
CK
W
T BLO
5
CK
BLO
BLOC
10
CK
K 13
BLO
1
C K1
4 BLO
CK 1
BLO
1 4
CK
BLO
CK 5
BLO
E
AC
SP
5
CK1 OPE
N
CR
BLO EE
K1
4 KE
BLO
C NC
K1
7 RO
BLOC
BLO
C AC
H ME
K
NT
15
T
EN
M
SE
T
EA
W
16
K
OC
BL
BL
OC
BL
BL
K
OC
OC
17
K
K
15
18
BL
BL
OC
OC
K
BL
19
OC
18
K
A
14
E
AR
E D
L UD
C
EX
A
LEGEND
BRIA HOMES EXECUTIVE CALAMBA BRIA HOMES INC.
CALAMBA, LAGUNA Lower Ground Floor, Starmall, Shaw Blvd., Mandaluyong City
ENGINEERING
CONSTRUCTION PLAN
JANUARY 2019
DESIGN ASSUMPTION:
1. UNIT WEIGHT OF RUBBLE CONCRETE MASONRY = 22.03 KN/m³
2. SURCHARGE = 245.30 KN/m²
3. FREE BOARD = 1500 mm
4. SOIL TO BE RETAINED HAS THE FF. PROPERTIES:
A. UNIT WEIGHT OF SOIL = 17.31 KN/m³
0.50 B. ANGLE OF REPOSED = 30°
1.00 m
GENERAL NOTES:
0.80 m 1. ALL ELVATIONS, DIMENSIONS, AND DISTANCES ARE IN METERS
2.00 m
UNLESS OTHERWISE SPECIFIED.
1.0 - 2mH MASONRY RIPRAP 6. BACKFILLING AND COMPACTION SHALL BE DONE BY LAYER NO
LAYER SHALL EXCEED 500mm. COMPACTION SHALL BE DONE
USING NOT LESS THAN SIX TONER ROAD ROLLER O BULLDOZER.
7. GROUTED RIPRAP DETAIL SHALL BE USE FOR 1:H NOT LESS THAN
3:2 SLOPE AND NOT MORE THAN 1:1 SLOPE.
OPTION 1: OPTION 2:
TYP. RETAINING WALL SECTION TYP. RETAINING WALL SECTION
RIPRAP DETAILS
INTERCEPTOR CANAL DETAIL
BRIA HOMES EXECUTIVE CALAMBA BRIA HOMES INC. RC WALL DETAILS
CALAMBA, LAGUNA Lower Ground Floor, Starmall, Shaw Blvd., Mandaluyong City
ENGINEERING
CONSTRUCTION PLAN
JANUARY 2019
LEGEND:
CHB FENCE
STEEL MATTING
D
EXCLUDE
RESERVED
EA
AR
ED
UD
CL
EX
1
CK
BLO A
E
AR
1.0
AIL ED
E DE
T
GULLEY LUD
NC C
FE HMENT EX
ENCROAC
EA A
SE T
K2 EN
ME
NT
C EM
BLO RIPRAP EA
S
OS OS
3
CK
BLO
OS
2
CK
BLO
1.0
IL 1
E TA CK
NC
ED BLO
FE
K4 C K5
BLO
C BLO
K1
OS=103 K6
C
7
CK
BLO
OS
6
CK
BLO
OS
RESERVED
5
CK
BLO
8
CK
2
BLO
K1 C
LOB
C K9
BLO
4
C K1
BLO
BLOCK 5
8
CK
W
T BLO
5
CK
BLO
BLOC
10
CK
K 13
BLO
1
C K1
4 BLO
CK 1
BLO
1 4
CK
BLO
CK 5
BLO
E
AC
SP
5
CK1 OPE
N
CR
BLO EE
K1
4 KE
BLO
C NC
K1
7 RO
BLOC
BLO
C AC
H ME
K
NT
15
T
EN
M
SE
T
EA
W
16
K
OC
BL
BL
OC
BL
BL
K
OC
OC
17
K
K
15
18
BL
BL
OC
OC
K
BL
19
OC
18
K
A
14
E
AR
E D
L UD
C
EX
01 FENCE LAY-OUT
- 17A SCALE 1:1000 M
FENCE LAY-OUT
A
LEGEND
BRIA HOMES EXECUTIVE CALAMBA BRIA HOMES INC.
CALAMBA, LAGUNA Lower Ground Floor, Starmall, Shaw Blvd., Mandaluyong City