Professional Documents
Culture Documents
66b Commercial 2
66b Commercial 2
Scale:-
G G Convenient Shopping Area- 3.69 Acs.
F.A.R. :-
Big Booths (20 sq.yds.) = 1:1.0
Small Booths (20 sq.yds.) = 1:1.0
1348
No. of
1347
Sr. Category Size No. of Area Plots
No. Plots Smt. Storeys
Ground + 2
S.C.O. 18'-9" x 50'-0" 174.19
1 2 With Basement 1,11
2 S.C.O. 18'-0" x 50'-0" 9 752.51 Ground + 2 2-10
With Basement
1410 3 Big Booths 9'-9" X 20'-0" 22 398.55 Ground Floor 1,8,9,15,16,23,24,31,32,39,
(With Basement) 40,47,48,55,56,63,64,71,72,
84,85.97
1411 4 Big Booths 9'-0" X 20'-0" 75 1254.18 Ground Floor 2-7,10-14,17-22,25-30,33-38,
41-46,49-54,57-62,65-70,
(With Basement) 73-83,86-96
Small Booths 9'-9"x10'-0" 70 634.05 Ground Floor 1,8,9,16,17,24,25,32,33,44,
1412 5
1345
1346
Only 45,60,61,67,68,74,75,87,88,
100,101,109,110,118,119,
124,125,130,131,142,143,
1413 154,155,164,165,174,175,
184,185,194,195,203,204,
G G 212,213,221,222,230,231,
239,240,248,249,258,259,
1414
RURKA
268,269,278,279,288,289,
298,299,308,309,313,314,
19
318,319,330
s=
89-99,102-108,111-117,
120,123,126-129,132-141,
1416
303'-5"
22' 144-153.156-163.166-173,
176-183,186-193,196-202,
lot
205-211,214-220,223-229,
Pavement 1261
1417 232-238,241-247,250-257
11'-3"
Toilet
Toilet
260-267,270-277,280-287,
(G)
30'
"P
(L)
290-297,300-307,310,312,
6'
34 33
G G
s.)
51'
6' 9' x 10' (12) (10 sq.yd Parking 315-317,320-329
4'
1418
ement
4'-0" wide corridor
4' 44 43 9'-9"
10'
9' 117'-6"
45 Pavement
19'-9"
Total covered area under S.C.O.'s = 2780.10 smt.
'-0
9"
18'
16'
16'-0" wide pav
9'-
46
21'
'-1 4'
Total covered area under Big Booth's = 1652.73 smt.
9'
0" 9'-9" 9' DISABLED
4'-0" wide corridor
10'
50
9'-9"
PERSONS 20'
124 125
8'
118 16'
117
wide pavem ent
4' 6'
9'-9"
vement
9'
111 9' x 10' (18) 9' "
8'-0
Total covered area under Small Booth's = 2807.96 smt.
8'
110
9'-9"
9'-9"
102 101 123 126 16' 23
10'
6'-0" wide corridor
10'
(10 sq.yds.)
9'
4'-0" wide corridor
1420
nt
109 108
6'
6'
s.) 4'-0" wide corridor
20'
9'-9"
me
nt
"x
9'
4'
16'-0" wide pa
ve
me
31 30
19'-3"
14'
s
e c (10
9'
31 18
ve
9"
or
Pa
de
9' 9'-9"
(20 sq.yds.)
38 39
(1
'-6
32 33
w
'-9
14'
9'
4'- 0'
120 129
10'
" 9'-9" 9'
4'-0" wide corridor Total area
wide corridor
x1
88
0"
89
0"
Total area
G G
9'-9"
(10 sq.yds.)
9' x 10' (26) 6'-0" wide corridor
9'
satelite
9'
8'-
10'
9'-9"
18
9'
119130 9'-9"
Required
6'
87
1422
10'
100 99 86
22
6'
13'-6"
(10 sq.yds.) Provided for
10'
Required Provided
10'
13'-6"
75
6'
for Parking
ide
16'
Parking
4'
ement
4'
16'-0" wide pav 17
1258
9' 4'-0"
4'-0" wide corridor
9'
16 (in sq.mts)
6'
1423 9' x 10' (16)
15
16'
10'
9 10
9'-9"
26 23
10'
16
6'
"W
9'-
9" 4'-0" wide corridor 132 131 (10 sq.yds.) 2 1
7
4'
9' x 10' (24)
4'
8
4'-0" wide corridor
4'
10'
9'-9"
14'
4'-0" wide corridor
6'
142 141 153 154 25 24 9' 9'-9" 16'
3330.76 3842.80 144.81 167
10'
6'
(10 sq.yds.)
6'
59 68
9' x 10' (14)
15'-6"
1424 69 9'
16'
10'
9'-9" 9'-9"
144 9' 16' ement
361'-6"
73 9'
15'-6" wide pav
74 143 4' 6' 6' 4'
4'-0" wide corridor
6'
'-0
9'
ad
6'
15'-6"
67 20'
60 (10 sq.yds.) 66 9'-9" 9' 9'
9' 9'-9" 16'
15'-6"
62 19'
4'
61 9'-9"
4'
9'
10'
10 9'-9" 9'
9'-9"
9'
9'-
10' 10'
11'-11"
1425
6'
9'-9"
vement
9'
9'-9"
20'
NOTE:-
o
41 40
9'-9"
9'-9" 9' 174 155
11 14
9'
vement
10' 14'
4'-0" wide corridor 194 175
10'
10'
' 10 16' 47 46
wide pavement
' 10'
14'
10' 195
60'-0" Wide R
(20 sq.yds.)
9' x 20' (16)
200 199(18)
ent
10'
9'
9'-9"
G G
9' x 10' 173 156 1 BASEMENT SHALL BE USED FOR STORAGE PURPOSE ONLY.
ement
330 259 258 202
9'
9'-9"
211 212
(20 sq.yds.)
10'
16'-0" wide pa
279 278
9'-9"
(10 sq.yds.)
54 55
205
1426
(10 sq.yds.)
4'-0" wide corridor
20'
204
8'-0" wide pa
6'
329
4'-0" wide corridor 48 49
14'
ement
3) THIS DRAWING NO. STP(GMADA) 61/2020 DATED 12.02.2020, HAS BEEN APPROVED IN
9'
280 277
16'-0" wide pa
9'
ement
15'-6"
300297
9'
9'-9"
6'-0" wide corridor
9'
ement 70TH MEETING OF REGIONAL PLANNING AND DESIGN COMMITTEE, UNDER THE CHAIRMAN
vement
9'-9"
6'
av rridor .yds.)
14'-0" wide pa
9' 9'-9"
301 SHIP OF ACA (GMADA) ON DATED 03.03.2020.
16'-0" wide pav
16'
4'-0" wide corridor
1427 10
9'-9" 9'
4'-0" wide corridor
16'-0" wide pav
9'
4'-0" wide corridor Pavement
4'-0" wide corridor
10'
sq
15'-6"
9' x 10' (20)
(10 sq.yds.)
4'-0" wide corridor
16'
4'-0" wide corridor
214 213
9' x 10' (20)
4'
wid " wide 2) (10
(10 sq.yds.)
t
16'-0" wide pa
9'-9"
(10 sq.yds.)
221 220
me
6'
230
co
229
(10 sq.yds.) 10' 6'-0" wide corridor
em
223
4'- 0' (
6'
10 222 14'
6'
20'
6'
'-1 10'
4'-0" wide corridor
1428
av
10'
57 56
13'-6"
0 "
x1
4'
ep
63 62
ep
9'-9"
20'
16'
14'
9'
16'
9' 9'-9"
9'-9"
315 312 (20 sq.yds.) 70 71 8
4'-0" wide corridor
4'-0" wide corridor
9'
166 163
9'
9'
"
9'-9"
0"
20'
(10 sq.yds.)
9'
4'-0" wide corridor
'-0
64 65
10'
186 183
14'
8'-
238 239
4'
10
9'-9"
9'
G G
9'
9'-9"
6'-0" wide corridor
9'
9'
267 250
6'
185 184
10'
240
(10 sq.yds.)
9'
6'
4'
2'-
(20 sq.yds.)
4'-0" wide corridor
9'-9"
16'
268 249
10'
20'-6"
4'
319 288269
9'-9"
ent Pavement
308 289
10'-0" wide pavem
9'-9"
6'
10'
6' 4'
9'-
20'
10'-9"
73 72
6'
r 84 83
8'-3" wide corrido
42'-6"
14'
9'
(20 sq.yds.) 96 97
S.C.O.
20'
1
31'
9'-9"
10 11 86
58'
18'
40'-8" 9' 9'-9" 1253
6'-0" wide corridor
18' 6' 14'
50'
40'-7"
(100 sq.yds.)
8' 9'-9" 9'
2 7'
39'-3"
6'
1 Pavement
8'-0" wide pavem
ent
5'
8'-3"
G G
18'-9"
Toilet
Toilet
18' 161'-6"
(G)
30'
(L)
r
8'-3" wide corrido
20'
ent
PARKING
8'-3"
DISABLED
PARKING PERSONS 1252
8'
Pavement
OFFICE OF THE
5'
FOR
8'-0" wide pav
PERSONS
G
Parking CONVENIENT SHOPPIN 64'-3"
64'-3"
377'-9"
164'-7"
22'
47'-8"
Entry/Exit GMADA.
Entry/Exit
122'-3"
Entry/Exit
22'