Mr. Paul Arunachal El-Mech Ofr 060422
Mr. Paul Arunachal El-Mech Ofr 060422
Approx. Size of the Swimming Pool : 10.5m x 5.5m X 1.3m ( Avg Depth)
TOTAL VOLUME OF WATER : 76 m3
TYPE OF THE POOL : Skimmer Type
TURN OVER PERIORD : 6 Hours
FLOW RATE : 12.5 m³/hr APPROX
FILTRATION VELOCITY : 30 m³/hr/m² (approx. )
3 Re-circulating Pumps
2HP, Recirculation Pump 2 Nos. Client Onus
( 1 working and 1 standby )
Make: Kirloskar / Espa, Spain / eq.
6 SKIMMER
Imported, Made in white ABS, Wide Mouth Skimmer for 2 Nos. 5,950.00
Skimming the top wtr. Lvl.
Make: Aqua, Italy / Aqvastar / eq.
9 LADDERS
Imported Stainless Steel Standard type ladders,
width: 500mm, handrails dia 40mm stainless steel
non-slip steps, provided with electrical earthing
connection and anchoring fixtures.
No. of threads - 2 1 No. 19,800.00
No. of threads - 3 1 No. 20,800.00
Make: Aqua, Italy/ Aqvaster
MAINTENANCE ACCESSORIES
Imported maintenance accessories consisting of :
10 Alluminium 18" vacuum head with rollers connection 1 No.
Make: Pentair, USA
ESTIMATE FOR THE BALANCE ITEMS FOR THE POOL IN THE SCOPE
OF THE POOL BUILDER / CONTRACTOR
SL # ITEM DESCRIPTION Qty. Unit Rate
INTERCONNECTING PIPING
18 Supply and installation of all interconnecting pipes 1 Lot 76,000.00
and fittings and valves in UPVC with a pressure
rating of 10kg/cm2. Make : Finolex/Supreme
The various pipe sizes shall be designed to achieve
the following velocities of flow
a) Return Line : 2.1 - 2.4m/sec.
b) Suction Line : 1.2-1.5m/sec.
Payment Terms:
70 % Advance payment with written work order
20 % before dispatch of goods from our warehouse in Kolkata and balance
10% After successful Commissioning
Delivery Terms:
Ex- Kolkata. Transportation and Tax extra on actuals
Validity of Offer :
Valid for One month from date of offer
Delivery:
4 - 6 weeks from the date of receipt of Advance with work order
S. D. Roy / P. BISWAS
THE PROPOSED SWIMMING POOL AT ARUNACHAL PRADESH
Date-06.04.2022
Amount (Rs.)
62,600.00
12,800.00
46,900.00
1,780.00
11,900.00
1,700.00
4,350.00
19,800.00
20,800.00
26,400.00
209,030.00
209,000.00
Amount (Rs.)
76,000.00
17,500.00
29,600.00
7,800.00
12,000.00
60,000.00
202,900.00
203,000.00
28,800.00
-
11,500.00
9,500.00
3,560.00
8,000.00
61,360.00
61,000.00
473,000.00
& Electricity upto Plant Room is client's onus (Materials & Labour)
room is to be provided by the client ( Materials & Labour )