PERENCANAAN PEMBANGUNAN

HOTEL WISANTI
JALAN TAMAN SISWA NO. 79 , WIROGUNAN, KEC. MERGANGSANG,
KOTA YOGYAKARTA, DIY. 55151
16000
7000 2000

8000
16400 5150 1850

DOWN

8000 8000

8000 8000 24000

4 48000

8000 8000

8000 8000 8000 8000

3
LIFT

GUEST CORE
LIFT
DOWN

8000 8000
UP

2 16000

8000 8000
LIFT
BARANG

DOWN

1
7000 9000 8000 8000 8000 8000
48000

A B C D E F G U
DENAH BASEMENT
16000
7000 2000 29069,87
7

THREAD MILL
7394,85

HIGH PULLEY
8000
5150 1850
9330,75

BENCH
PRESS
WEIGHTS
DOWN

6
3880,15
G.Toilet

MULTI GYM
3.5MX2.4M

DUMBELLS
L.Toilet
3.5MX2.8M

8000

G.Toilet
L.Toilet 3.5MX2.4M
3.5MX2.8M
R . Bilas

5 8000
WARM UP PLATE/
FLOOR EXERSICE

8000

4 48000 8000
R. Olahraga
Souna

8000
Souna
8000
3800
Chef CABIN
4mx2m

3
LIFT
Gudang Peralatan

GUEST CORE
LIFT
DOWN
KITCHEN
8000
UP

2 COLD
STORAGE

MANAGER CABIN STAGE


STORE
ROOM
8000
LIFT
BARANG RUANG
CLOCK ROOM
KARYAWAN
DOWN

1
5000 5000

7000 9000 8000 8000 8000 8000


48000

A B C D E F G

DENAH LANTAI 1
U
16000
7000 2000

8000
5150 1850

DOWN

8000 8000

8000 8000 24000

4 48000

8000 8000

8000 8000 8000 8000

3
LIFT

GUEST CORE
G.Toilet
L.Toilet 3.5MX2.4M
3.5MX2.8M

R. STAF DOWN
LIFT

8000
UP

BAR

2
L.Toilet

G.Toilet

8000
LIFT
R. MENEJER R. PERTEMUAN
BARANG

DOWN

1
7000 9000 8000 8000 8000 8000
48000

A B C D E F G U
DENAH LANTAI 2
16000
7000 2000

8000
5150 1850

DOWN

8000 8000

8000 8000 24000

4 48000

8000 8000

8000 8000 8000 8000

3
LIFT FOOD SERVING TABLE
movable hair
wash basin GENT'S SALOON

GUEST CORE
G.Toilet

SHOP L.Toilet
3.5MX2.8M
3.5MX2.4M

LIFT DINNING AREA


DOWN

8000 movable hair


LADIES PALOUR
wash basin

UP

BANQUET HALL

2
L.Toilet

Hair treatment

LADIES FACIALS
G.Toilet MASSAGE

8000
LIFT
BARANG

DOWN Pedicure

SHOWER

1
7000 9000 8000 8000 8000 8000
48000

A B C D E F G U
DENAH LANTAI 3
16000
7000 2000

8000
5150 1850

DOWN

8000 8000

8000 8000 24000

4 48000

8000 8000

8000 8000 8000 8000

3
LIFT

GUEST CORE
LIFT
DOWN

8000
UP

8000
LIFT
BARANG

DOWN

1
7000 9000 8000 8000 8000 8000
48000

A B C D E F G U
DENAH LANTAI 4
16000
7000 2000

8000
5150 1850

DOWN

8000 8000

8000 8000 24000

4 48000

8000 8000

8000 8000 8000 8000

8000

8000
LIFT
BARANG

DOWN

1
7000 9000 8000 8000 8000 8000
48000

A B C D E F G U
DENAH LANTAI 5
7

8000

DOWN

8000

8000

4 48000

8000

8000

8000
LIFT
BARANG

DOWN

1
7000 9000
16000

A B C U
DENAH LANTAI 6
7

8000

DOWN

8000

8000

4 48000

8000

8000

8000
LIFT
BARANG

DOWN

1
7000 9000
16000

A B C U
DENAH LANTAI 7
7

8000

DOWN

8000

8000

4 48000

8000

8000

8000
LIFT
BARANG

DOWN

1
7000 9000
16000

A B C U
DENAH LANTAI 8
7

8000

8000

8000

4 48000

8000

8000

8000

1
7000 9000
16000

A B C U
TOP FLOOR
PROYEK HOTEL WISANTI
JL. TAMAN SISWA NO. 79 - YOGYAKARTA

RENCANA ANGGARAN BIAYA (RAB)

DISUSUSUN OLEH :
PT. INDOPRANITA PRATAMA LAND
REKAPITULASI
BILL OF QUANTITY
PEMBANGUNAN HOTEL WISANTI YOGYAKARTA

NO URAIAN PEKERJAAN JUMLAH

A PEKERJAAN STRUKTUR Rp. 32.855.172.380,91


B PEKERJAAN ARSITEKTUR Rp. 32.985.876.198,76
C PEKERJAAN MEKANIKAL DAN ELEKTRIKAL Rp. 32.784.043.155,00

D PEKERJAAN UTILITAS
1. PEKERJAAN TRANSPORTASI DALAM GEDUNG (SBO)
2. PEKERJAAN POWER HOUSE & GENSET ROOM (SBO)
3. SAMBUNG DAYA BARU (SBO)
4. WWTP & STP (SBO)

JUMLAH Rp. 98.625.091.734,68


PPn 10% Rp. 9.862.509.173,47

GRAND TOTAL Rp. 108.487.600.908,15


DIBULATKAN Rp. 108.487.000.000,00
SERATUS DELAPAN MILYAR EMPAT RATUS DELAPAN PULUH TUJUH JUTA RUPIAH

Yogyakarta, September 2021


PT. INDOPRANITA PRATAMA LAND

SURATMAN, ST. MM.


Direktur Utama
REKAPITULASI
BILL OF QUANTITY
PEMBANGUNAN HOTEL WISANTI YOGYAKARTA
PEKERJAAN STRUKTUR

NO URAIAN PEKERJAAN JUMLAH

I BASEMENT FLOOR Rp. 12.458.576.669,02


II 1st FLOOR Rp. 2.355.866.024,19
III 2nd FLOOR Rp. 2.369.803.070,74
IV 3rd FLOOR Rp. 2.441.764.182,19
V 4th FLOOR Rp. 1.505.640.525,00
VI 5th FLOOR Rp. 2.353.993.473,05
VII 6th FLOOR Rp. 2.354.836.934,84
VIII 7th FLOOR Rp. 2.354.557.746,65
IX 8th FLOOR Rp. 2.325.540.262,59
X ROOF FLOOR Rp. 2.053.178.675,17
XI ROOF TOP FLOOR Rp. 281.414.817,49

JUMLAH Rp. 32.855.172.380,91


BILL OF QUANTITY ( BQ )
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Struktur
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH
I BASEMENT FLOOR Rp 12.458.576.669
1 Pekerjaan galian m3 2310 Rp 88000 Rp 203.280.000,00
2 Pek. Pondasi  80 cm m3 1044,992 Rp 3.416.575,00 Rp 3.570.293.542,40
3 Pek. Chemical Anchorage ls 1,00 Rp 4.000.000,00 Rp 4.000.000,00
4 Pek. Pilecap beton BP8K1 m3 125,74 Rp 6.774.180,00 Rp 851.762.580,27
5 Pek. Pilecap beton BP19K1 m3 321,20 Rp 6.774.180,00 Rp 2.175.867.190,99
6 Pek. Pilecap beton BP4K2 m3 242,43 Rp 6.774.180,00 Rp 1.642.283.865,43
7 Pek. Pilecap beton BP2K1 m3 324,70 Rp 6.774.180,00 Rp 2.199.600.841,69
8 Pek. Tie Beam TB1 50x90 cm m3 36,05 Rp 3.611.000,00 Rp 130.184.180,58
9 Pek. Tie Beam TB2 50x90 cm m3 40,70 Rp 3.611.000,00 Rp 146.958.454,61
10 Pek. Tie Beam TB3 50x90 cm m3 18,57 Rp 3.611.000,00 Rp 67.040.617,07
11 Pek. Tie Beam TB4 50x90 cm m3 33,91 Rp 3.611.000,00 Rp 122.446.552,50
12 Pek. Kolom beton K1 50x100 cm m3 46,53 Rp 5.540.510,00 Rp 257.808.070,69
13 Pek. Kolom beton K2 50x100 cm m3 19,16 Rp 4.946.700,00 Rp 94.778.854,86
14 Pek. Kolom beton K3 40x80 cm m3 3,50 Rp 4.585.820,00 Rp 16.066.630,95
15 Pek. Kolom beton K4 30x60 cm m3 6,90 Rp 4.850.040,00 Rp 33.453.665,15
16 Pek. Kolom beton K5 40x40 cm m3 1,75 Rp 4.256.070,00 Rp 7.455.668,34
17 Pek. Kolom beton 15x15 cm m3 7,40 Rp 3.115.070,00 Rp 23.045.638,59
18 Pek. Shearwall beton m3 15,20 Rp 1.980.000,00 Rp 30.101.715,78
19 Pek. Corewall beton m3 20,86 Rp 1.980.000,00 Rp 41.312.437,10
20 Pek. Retaining wall beton t 30 cm, lantai 40 cm m3 388,13 Rp 1.950.000,00 Rp 756.848.033,08
21 Pek. Tangga dan pondasi tangga m3 14,20 Rp 2.980.000,00 Rp 42.321.583,45
22 Pek. Ramp beton berikut besi siku 30.30.3 jarak 15 cm m3 22,16 Rp 1.880.000,00 Rp 41.666.545,49

II 1ST FLOOR Rp 2.355.866.024


1 Pek. Balok Beton B1 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
2 Pek. Balok Beton B2 50x100 m3 5,55 Rp 5.495.840,00 Rp 30.515.622,20
3 Pek. Balok Beton B3-B7 40x70 m3 15,33 Rp 5.495.840,00 Rp 84.240.309,16
4 Pek. Balok Beton B8 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
5 Pek. Balok Beton B9 50x100 m3 5,55 Rp 5.495.840,00 Rp 30.515.622,20
6 Pek. Balok Beton B10-B22 40x70 m3 39,85 Rp 5.495.840,00 Rp 219.024.803,83
7 Pek. Balok Beton B23-B29 40x70 m3 21,77 Rp 5.495.840,00 Rp 119.655.622,81
8 Pek. Balok Beton B30-B36 40x80 m3 30,22 Rp 5.556.970,00 Rp 167.920.983,80
9 Pek. Balok Beton B37-B38 40x70 m3 6,13 Rp 5.495.840,00 Rp 33.696.123,67
10 Pek. Balok Beton B39-B40 20x45 m3 1,14 Rp 3.696.980,00 Rp 4.221.140,01
11 Pek. Balok Beton B41 20x65 m3 0,92 Rp 4.469.110,00 Rp 4.124.134,80
12 Pek. Balok Beton B42-B47 40x70 m3 12,00 Rp 5.495.840,00 Rp 65.930.935,85
13 Pek. Balok Beton B48 20x65 m3 1,03 Rp 4.469.110,00 Rp 4.613.438,92
14 Pek. Balok Beton B49-B50 30x45 m3 0,86 Rp 5.194.950,00 Rp 4.468.933,14
15 Pek. Balok Beton B51-B53 30x45 m3 1,28 Rp 5.194.950,00 Rp 6.662.773,04
16 Pek. Balok Beton B54-B58 20x40 m3 3,05 Rp 3.536.910,00 Rp 10.787.440,57
17 Pek. Balok Beton SB1 20x65 m3 24,20 Rp 4.469.110,00 Rp 108.136.212,36
18 Pek. Balok Beton SB2 20x65 m3 3,22 Rp 4.469.110,00 Rp 14.399.521,49
19 Pek. Balok Beton SB3 20x45 m3 0,58 Rp 3.696.980,00 Rp 2.139.481,92
20 Pek. Balok Beton BC1 20x35 m3 0,61 Rp 3.376.690,00 Rp 2.059.755,14
21 Pek. Balok Beton BL 15x30 m3 1,22 Rp 3.122.890,00 Rp 3.809.878,14
17 Pek. Shearwall beton m3 15,20 Rp 1.980.000,00 Rp 30.101.715,78
18 Pek. Corewall beton m3 20,86 Rp 1.980.000,00 Rp 41.312.437,10
23 Pek. Plat lantai m3 219,72 Rp 3.888.440,00 Rp 854.377.290,67
24 Pek. Plat tangga beton m3 23,71 Rp 2.980.000,00 Rp 70.660.264,87
25 Pek. Listplank beton void dan tangga m3 4,08 Rp 550.000,00 Rp 2.245.241,15
26 Pek. Kolom beton K1 50x100 cm m3 46,53 Rp 5.540.510,00 Rp 257.808.070,69
27 Pek. Kolom beton K2 50x100 cm m3 19,16 Rp 4.946.700,00 Rp 94.778.854,86
28 Pek. Kolom beton K3 40x80 cm m3 3,50 Rp 4.585.820,00 Rp 16.066.630,95
29 Pek. Kolom beton K4 30x60 cm m3 6,90 Rp 4.850.040,00 Rp 33.453.665,15
30 Pek. Kolom beton K5 40x40 cm m3 1,75 Rp 4.256.070,00 Rp 7.455.668,34
31 Pek. Kolom beton 15x15 cm m3 7,40 Rp 3.115.070,00 Rp 23.045.638,59

III 2ND FLOOR Rp 2.369.803.071


1 Pek. Balok Beton B1 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
2 Pek. Balok Beton B2-B7 40x70 m3 18,49 Rp 5.495.840,00 Rp 101.604.127,99
3 Pek. Balok Beton B8 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Struktur
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH
I BASEMENT FLOOR Rp 12.458.576.669
4 Pek. Balok Beton B9-B20 40x70 m3 36,62 Rp 5.495.840,00 Rp 201.231.187,50
5 Pek. Balok Beton B21-B24 40x70 m3 12,43 Rp 5.495.840,00 Rp 68.337.801,82
6 Pek. Balok Beton B25-B28 40x70 m3 12,43 Rp 5.495.840,00 Rp 68.337.801,82
7 Pek. Balok Beton B29-B32 40x80 m3 21,32 Rp 5.556.970,00 Rp 118.465.994,26
8 Pek. Balok Beton B33 40x80 m3 4,27 Rp 5.556.970,00 Rp 23.727.965,10
9 Pek. Balok Beton B34 40x80 m3 4,27 Rp 5.556.970,00 Rp 23.727.965,10
10 Pek. Balok Beton B35-B40 40x70 m3 19,99 Rp 5.495.840,00 Rp 109.856.239,91
11 Pek. Balok Beton B41-B46 20x65 m3 8,54 Rp 4.469.110,00 Rp 38.165.722,01
12 Pek. Balok Beton B47-B51 20x45 m3 1,70 Rp 3.696.980,00 Rp 6.302.798,09
14 Pek. Balok Beton B53-B54 30x45 m3 6,37 Rp 5.194.950,00 Rp 33.070.105,23
15 Pek. Balok Beton B55 20x45 m3 0,34 Rp 3.696.980,00 Rp 1.272.124,39
16 Pek. Balok Beton SB1 20x65 m3 23,99 Rp 4.469.110,00 Rp 107.227.504,69
17 Pek. Balok Beton SB2 20x45 m3 2,02 Rp 3.696.980,00 Rp 7.459.274,80
18 Pek. Balok Beton SB3 20x35 m3 0,44 Rp 3.376.690,00 Rp 1.478.798,56
19 Pek. Balok Beton BC1 20x35 m3 0,61 Rp 3.376.690,00 Rp 2.059.755,14
20 Pek. Balok Beton BC2 30x45 m3 0,56 Rp 5.194.950,00 Rp 2.925.119,87
21 Pek. Balok Beton BC3 15x30 m3 0,09 Rp 3.122.890,00 Rp 293.067,55
23 Pek. Balok Beton BL 15x30 m3 1,22 Rp 3.122.890,00 Rp 3.809.878,14
24 Pek. Shearwall beton m3 15,20 Rp 1.980.000,00 Rp 30.101.715,78
25 Pek. Corewall beton m3 20,86 Rp 1.980.000,00 Rp 41.312.437,10
26 Pek. Plat lantai m3 229,31 Rp 3.888.440,00 Rp 891.658.987,65
27 Pek. Plat tangga beton m3 15,06 Rp 2.980.000,00 Rp 44.885.115,48
28 Pek. Listplank beton tangga m3 4,08 Rp 550.000,00 Rp 2.245.241,15
29 Pek. Kolom beton K1 50x100 cm m3 46,53 Rp 5.540.510,00 Rp 257.808.070,69
30 Pek. Kolom beton K2 50x100 cm m3 19,16 Rp 4.946.700,00 Rp 94.778.854,86
31 Pek. Kolom beton K3 40x80 cm m3 3,50 Rp 4.585.820,00 Rp 16.066.630,95
32 Pek. Kolom beton K4 30x60 cm m3 6,90 Rp 4.850.040,00 Rp 33.453.665,15
33 Pek. Kolom beton K5 40x40 cm m3 1,75 Rp 4.256.070,00 Rp 7.455.668,34
34 Pek. Kolom beton 15x15 cm m3 7,40 Rp 3.115.070,00 Rp 23.045.638,59

IV 3RD FLOOR Rp 2.441.764.182


1 Pek. Balok Beton B1 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
2 Pek. Balok Beton B2-B5 40x70 m3 24,88 Rp 5.495.840,00 Rp 136.761.563,14
3 Pek. Balok Beton B6 40x70 m3 2,89 Rp 5.495.840,00 Rp 15.902.507,34
4 Pek. Balok Beton B7 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
5 Pek. Balok Beton B8 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
6 Pek. Balok Beton B9-B15 40x70 m3 21,51 Rp 5.495.840,00 Rp 118.194.311,33
7 Pek. Balok Beton B16 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
8 Pek. Balok Beton B17-B22 40x70 m3 18,39 Rp 5.495.840,00 Rp 101.088.371,00
9 Pek. Balok Beton B23-B24 40x70 m3 6,13 Rp 5.495.840,00 Rp 33.696.123,67
10 Pek. Balok Beton B25 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
11 Pek. Balok Beton B26-B27 40x70 m3 6,13 Rp 5.495.840,00 Rp 33.696.123,67
12 Pek. Balok Beton B28 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
13 Pek. Balok Beton B29-B30 40x70 m3 6,13 Rp 5.495.840,00 Rp 33.696.123,67
14 Pek. Balok Beton B31 40x80 m3 4,32 Rp 5.556.970,00 Rp 23.988.711,97
15 Pek. Balok Beton B32-B34 40x80 m3 12,95 Rp 5.556.970,00 Rp 71.966.135,91
16 Pek. Balok Beton B35-B36 40x80 m3 8,63 Rp 5.556.970,00 Rp 47.977.423,94
17 Pek. Balok Beton B37 40x80 m3 4,32 Rp 5.556.970,00 Rp 23.988.711,97
18 Pek. Balok Beton B38 40x80 m3 4,32 Rp 5.556.970,00 Rp 23.988.711,97
19 Pek. Balok Beton B39-B44 40x70 m3 18,39 Rp 5.495.840,00 Rp 101.088.371,00
20 Pek. Balok Beton B45-B47 20x45 m3 1,14 Rp 3.696.980,00 Rp 4.221.140,01
21 Pek. Balok Beton B48-B53 20x65 m3 8,54 Rp 4.469.110,00 Rp 38.165.722,01
22 Pek. Balok Beton B54-B55 30x45 m3 0,80 Rp 5.194.950,00 Rp 4.143.919,82
23 Pek. Balok Beton SB1 20x65 m3 29,89 Rp 4.469.110,00 Rp 133.580.027,03
24 Pek. Balok Beton SB2 20x45 m3 0,84 Rp 3.696.980,00 Rp 3.122.487,13
25 Pek. Balok Beton BC1 20x35 m3 0,61 Rp 3.376.690,00 Rp 2.059.755,14
26 Pek. Balok Beton BC2 30x45 m3 0,56 Rp 5.194.950,00 Rp 2.925.119,87
27 Pek. Balok Beton BC3 15x30 m3 0,09 Rp 3.122.890,00 Rp 293.067,55
28 Pek. Balok Beton BL 15x30 m3 1,22 Rp 3.122.890,00 Rp 3.809.878,14
29 Pek. Shearwall beton m3 15,20 Rp 1.980.000,00 Rp 30.101.715,78
30 Pek. Corewall beton m3 3,50 Rp 1.980.000,00 Rp 6.937.020,92
31 Pek. Plat lantai m3 229,62 Rp 3.888.440,00 Rp 892.875.356,23
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Struktur
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH
I BASEMENT FLOOR Rp 12.458.576.669
32 Pek. Plat tangga beton m3 15,06 Rp 2.980.000,00 Rp 44.885.115,48
33 Pek. Listplank beton tangga m3 1,77 Rp 550.000,00 Rp 972.077,58
34 Pek. Kolom beton K1 50x100 cm m3 46,53 Rp 5.540.510,00 Rp 257.808.070,69
35 Pek. Kolom beton K2 50x100 cm m3 19,16 Rp 4.946.700,00 Rp 94.778.854,86
36 Pek. Kolom beton K3 40x80 cm m3 3,50 Rp 4.585.820,00 Rp 16.066.630,95
37 Pek. Kolom beton K4 30x60 cm m3 6,90 Rp 4.850.040,00 Rp 33.453.665,15
38 Pek. Kolom beton K5 40x40 cm m3 1,75 Rp 4.256.070,00 Rp 7.455.668,34
39 Pek. Kolom beton 15x15 cm m3 7,40 Rp 3.115.070,00 Rp 23.045.638,59

V 4TH FLOOR Rp 1.505.640.525


1 Pek. Balok Beton B1 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
2 Pek. Balok Beton B2-B4 40x70 m3 9,20 Rp 5.495.840,00 Rp 50.544.185,50
3 Pek. Balok Beton B5-B7 40x70 m3 9,20 Rp 5.495.840,00 Rp 50.544.185,50
4 Pek. Balok Beton B8 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
5 Pek. Balok Beton B9-B15 40x70 m3 21,46 Rp 5.495.840,00 Rp 117.936.432,83
6 Pek. Balok Beton B16 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
7 Pek. Balok Beton B17-B22 40x70 m3 18,39 Rp 5.495.840,00 Rp 101.088.371,00
8 Pek. Balok Beton B23 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
9 Pek. Balok Beton B24 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
10 Pek. Balok Beton B25 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
11 Pek. Balok Beton B26-B29 40x70 m3 12,26 Rp 5.495.840,00 Rp 67.392.247,33
12 Pek. Balok Beton B30 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
13 Pek. Balok Beton B31 40x80 m3 4,57 Rp 5.556.970,00 Rp 25.379.361,94
14 Pek. Balok Beton B32-B33 40x80 m3 9,13 Rp 5.556.970,00 Rp 50.758.723,88
15 Pek. Balok Beton B35-B36 40x80 m3 9,13 Rp 5.556.970,00 Rp 50.758.723,88
16 Pek. Balok Beton B37 40x80 m3 4,57 Rp 5.556.970,00 Rp 25.379.361,94
17 Pek. Balok Beton B38 40x80 m3 4,57 Rp 5.556.970,00 Rp 25.379.361,94
18 Pek. Balok Beton B39-B40 30x45 m3 0,80 Rp 5.194.950,00 Rp 4.143.919,82
19 Pek. Balok Beton SB1 20x65 m3 54,45 Rp 4.469.110,00 Rp 243.323.952,96
20 Pek. Balok Beton SB2 20x45 m3 10,57 Rp 3.696.980,00 Rp 39.088.912,93
21 Pek. Balok Beton SB3 20x50 m3 1,66 Rp 4.469.110,00 Rp 7.409.462,51
23 Pek. Balok Beton BC1 20x35 m3 0,61 Rp 3.376.690,00 Rp 2.059.755,14
24 Pek. Balok Beton BC2 30x45 m3 0,56 Rp 5.194.950,00 Rp 2.925.119,87
25 Pek. Balok Beton BC3 15x30 m3 0,09 Rp 3.122.890,00 Rp 293.067,55
26 Pek. Balok Beton BL 15x30 m3 1,22 Rp 3.122.890,00 Rp 3.809.878,14
27 Pek. Shearwall beton m3 15,20 Rp 1.980.000,00 Rp 30.101.715,78
28 Pek. Corewall beton m3 7,40 Rp 1.980.000,00 Rp 14.648.262,93
29 Pek. Plat lantai m3 224,13 Rp 3.888.440,00 Rp 871.528.087,64
30 Pek. Plat tangga beton m3 15,06 Rp 2.980.000,00 Rp 44.885.115,48
31 Pek. Listplank beton tangga m3 1,77 Rp 550.000,00 Rp 972.077,58
32 Pek. Kolom beton K1 50x100 cm m3 46,53 Rp 5.540.510,00 Rp 257.808.070,69
33 Pek. Kolom beton K2 50x100 cm m3 19,16 Rp 4.946.700,00 Rp 94.778.854,86
34 Pek. Kolom beton K3 40x80 cm m3 3,50 Rp 4.585.820,00 Rp 16.066.630,95
35 Pek. Kolom beton K4 30x60 cm m3 6,90 Rp 4.850.040,00 Rp 33.453.665,15
36 Pek. Kolom beton K5 40x40 cm m3 1,75 Rp 4.256.070,00 Rp 7.455.668,34
37 Pek. Kolom beton 15x15 cm m3 7,40 Rp 3.115.070,00 Rp 23.045.638,59

VI 5TH FLOOR Rp 2.353.993.473


1 Pek. Balok Beton B1 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
2 Pek. Balok Beton B2-B4 40x70 m3 9,20 Rp 5.495.840,00 Rp 50.544.185,50
3 Pek. Balok Beton B5-B7 40x70 m3 9,20 Rp 5.495.840,00 Rp 50.544.185,50
4 Pek. Balok Beton B8 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
5 Pek. Balok Beton B9-B15 40x70 m3 21,46 Rp 5.495.840,00 Rp 117.936.432,83
6 Pek. Balok Beton B16 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
7 Pek. Balok Beton B17-B22 40x70 m3 18,39 Rp 5.495.840,00 Rp 101.088.371,00
8 Pek. Balok Beton B23 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
9 Pek. Balok Beton B24 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
10 Pek. Balok Beton B25 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
11 Pek. Balok Beton B26-B29 40x70 m3 12,26 Rp 5.495.840,00 Rp 67.392.247,33
12 Pek. Balok Beton B30 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
13 Pek. Balok Beton B31 40x80 m3 4,57 Rp 5.556.970,00 Rp 25.379.361,94
14 Pek. Balok Beton B32-B33 40x80 m3 9,13 Rp 5.556.970,00 Rp 50.758.723,88
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Struktur
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH
I BASEMENT FLOOR Rp 12.458.576.669
15 Pek. Balok Beton B35-B36 40x80 m3 9,13 Rp 5.556.970,00 Rp 50.758.723,88
16 Pek. Balok Beton B37 40x80 m3 4,57 Rp 5.556.970,00 Rp 25.379.361,94
17 Pek. Balok Beton B38 40x80 m3 4,57 Rp 5.556.970,00 Rp 25.379.361,94
18 Pek. Balok Beton B39-B40 30x45 m3 0,80 Rp 5.194.950,00 Rp 4.143.919,82
19 Pek. Balok Beton SB1 20x65 m3 54,45 Rp 4.469.110,00 Rp 243.323.952,96
20 Pek. Balok Beton SB2 20x45 m3 10,57 Rp 3.696.980,00 Rp 39.088.912,93
21 Pek. Balok Beton SB3 20x50 m3 1,66 Rp 4.469.110,00 Rp 7.409.462,51
23 Pek. Balok Beton BC1 20x35 m3 0,61 Rp 3.376.690,00 Rp 2.059.755,14
24 Pek. Balok Beton BC2 30x45 m3 0,56 Rp 3.696.980,00 Rp 2.081.658,08
25 Pek. Balok Beton BC3 15x30 m3 0,09 Rp 3.122.890,00 Rp 293.067,55
26 Pek. Balok Beton BL 15x30 m3 1,22 Rp 3.122.890,00 Rp 3.809.878,14
27 Pek. Shearwall beton m3 15,20 Rp 1.980.000,00 Rp 30.101.715,78
28 Pek. Corewall beton m3 7,40 Rp 1.980.000,00 Rp 14.648.262,93
29 Pek. Plat lantai m3 224,13 Rp 3.888.440,00 Rp 871.528.087,64
30 Pek. Plat tangga beton m3 15,06 Rp 2.980.000,00 Rp 44.885.115,48
31 Pek. Listplank beton tangga m3 1,77 Rp 550.000,00 Rp 972.077,58
32 Pek. Kolom beton K1 50x100 cm m3 46,53 Rp 5.540.510,00 Rp 257.808.070,69
33 Pek. Kolom beton K2 50x100 cm m3 19,16 Rp 4.946.700,00 Rp 94.778.854,86
34 Pek. Kolom beton K3 40x80 cm m3 3,50 Rp 4.585.820,00 Rp 16.066.630,95
35 Pek. Kolom beton K4 30x60 cm m3 6,90 Rp 4.850.040,00 Rp 33.453.665,15
36 Pek. Kolom beton K5 40x40 cm m3 1,75 Rp 4.256.070,00 Rp 7.455.668,34
37 Pek. Kolom beton 15x15 cm m3 7,40 Rp 3.115.070,00 Rp 23.045.638,59

VII 6TH FLOOR Rp 2.354.836.935


1 Pek. Balok Beton B1 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
2 Pek. Balok Beton B2-B4 40x70 m3 9,20 Rp 5.495.840,00 Rp 50.544.185,50
3 Pek. Balok Beton B5-B7 40x70 m3 9,20 Rp 5.495.840,00 Rp 50.544.185,50
4 Pek. Balok Beton B8 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
5 Pek. Balok Beton B9-B15 40x70 m3 21,46 Rp 5.495.840,00 Rp 117.936.432,83
6 Pek. Balok Beton B16 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
7 Pek. Balok Beton B17-B22 40x70 m3 18,39 Rp 5.495.840,00 Rp 101.088.371,00
8 Pek. Balok Beton B23 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
9 Pek. Balok Beton B24 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
10 Pek. Balok Beton B25 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
11 Pek. Balok Beton B26-B29 40x70 m3 12,26 Rp 5.495.840,00 Rp 67.392.247,33
12 Pek. Balok Beton B30 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
13 Pek. Balok Beton B31 40x80 m3 4,57 Rp 5.556.970,00 Rp 25.379.361,94
14 Pek. Balok Beton B32-B33 40x80 m3 9,13 Rp 5.556.970,00 Rp 50.758.723,88
15 Pek. Balok Beton B35-B36 40x80 m3 9,13 Rp 5.556.970,00 Rp 50.758.723,88
16 Pek. Balok Beton B37 40x80 m3 4,57 Rp 5.556.970,00 Rp 25.379.361,94
17 Pek. Balok Beton B38 40x80 m3 4,57 Rp 5.556.970,00 Rp 25.379.361,94
18 Pek. Balok Beton B39-B40 30x45 m3 0,80 Rp 5.194.950,00 Rp 4.143.919,82
19 Pek. Balok Beton SB1 20x65 m3 54,45 Rp 4.469.110,00 Rp 243.323.952,96
20 Pek. Balok Beton SB2 20x45 m3 10,57 Rp 3.696.980,00 Rp 39.088.912,93
21 Pek. Balok Beton SB3 20x50 m3 1,66 Rp 4.469.110,00 Rp 7.409.462,51
23 Pek. Balok Beton BC1 20x35 m3 0,61 Rp 3.376.690,00 Rp 2.059.755,14
24 Pek. Balok Beton BC2 30x45 m3 0,56 Rp 5.194.950,00 Rp 2.925.119,87
25 Pek. Balok Beton BC3 15x30 m3 0,09 Rp 3.122.890,00 Rp 293.067,55
26 Pek. Balok Beton BL 15x30 m3 1,22 Rp 3.122.890,00 Rp 3.809.878,14
27 Pek. Shearwall beton m3 15,20 Rp 1.980.000,00 Rp 30.101.715,78
28 Pek. Corewall beton m3 7,40 Rp 1.980.000,00 Rp 14.648.262,93
29 Pek. Plat lantai m3 224,13 Rp 3.888.440,00 Rp 871.528.087,64
30 Pek. Plat tangga beton m3 15,06 Rp 2.980.000,00 Rp 44.885.115,48
31 Pek. Listplank beton tangga m3 1,77 Rp 550.000,00 Rp 972.077,58
32 Pek. Kolom beton K1 50x100 cm m3 46,53 Rp 5.540.510,00 Rp 257.808.070,69
33 Pek. Kolom beton K2 50x100 cm m3 19,16 Rp 4.946.700,00 Rp 94.778.854,86
34 Pek. Kolom beton K3 40x80 cm m3 3,50 Rp 4.585.820,00 Rp 16.066.630,95
35 Pek. Kolom beton K4 30x60 cm m3 6,90 Rp 4.850.040,00 Rp 33.453.665,15
36 Pek. Kolom beton K5 40x40 cm m3 1,75 Rp 4.256.070,00 Rp 7.455.668,34
37 Pek. Kolom beton 15x15 cm m3 7,40 Rp 3.115.070,00 Rp 23.045.638,59

VII 7TH FLOOR Rp 2.354.557.747


Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Struktur
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH
I BASEMENT FLOOR Rp 12.458.576.669
1 Pek. Balok Beton B1 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
2 Pek. Balok Beton B2-B4 40x70 m3 9,20 Rp 5.495.840,00 Rp 50.544.185,50
3 Pek. Balok Beton B5-B7 40x70 m3 9,20 Rp 5.495.840,00 Rp 50.544.185,50
4 Pek. Balok Beton B8 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
5 Pek. Balok Beton B9-B15 40x70 m3 21,46 Rp 5.495.840,00 Rp 117.936.432,83
6 Pek. Balok Beton B16 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
7 Pek. Balok Beton B17-B22 40x70 m3 18,39 Rp 5.495.840,00 Rp 101.088.371,00
8 Pek. Balok Beton B23 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
9 Pek. Balok Beton B24 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
10 Pek. Balok Beton B25 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
11 Pek. Balok Beton B26-B29 40x70 m3 12,26 Rp 5.495.840,00 Rp 67.392.247,33
12 Pek. Balok Beton B30 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
13 Pek. Balok Beton B31 40x80 m3 4,57 Rp 5.495.840,00 Rp 25.100.173,75
14 Pek. Balok Beton B32-B33 40x80 m3 9,13 Rp 5.556.970,00 Rp 50.758.723,88
15 Pek. Balok Beton B35-B36 40x80 m3 9,13 Rp 5.556.970,00 Rp 50.758.723,88
16 Pek. Balok Beton B37 40x80 m3 4,57 Rp 5.556.970,00 Rp 25.379.361,94
17 Pek. Balok Beton B38 40x80 m3 4,57 Rp 5.556.970,00 Rp 25.379.361,94
18 Pek. Balok Beton B39-B40 30x45 m3 0,80 Rp 5.194.950,00 Rp 4.143.919,82
19 Pek. Balok Beton SB1 20x65 m3 54,45 Rp 4.469.110,00 Rp 243.323.952,96
20 Pek. Balok Beton SB2 20x45 m3 10,57 Rp 3.696.980,00 Rp 39.088.912,93
21 Pek. Balok Beton SB3 20x50 m3 1,66 Rp 4.469.110,00 Rp 7.409.462,51
23 Pek. Balok Beton BC1 20x35 m3 0,61 Rp 3.376.690,00 Rp 2.059.755,14
24 Pek. Balok Beton BC2 30x45 m3 0,56 Rp 5.194.950,00 Rp 2.925.119,87
25 Pek. Balok Beton BC3 15x30 m3 0,09 Rp 3.122.890,00 Rp 293.067,55
26 Pek. Balok Beton BL 15x30 m3 1,22 Rp 3.122.890,00 Rp 3.809.878,14
27 Pek. Shearwall beton m3 15,20 Rp 1.980.000,00 Rp 30.101.715,78
28 Pek. Corewall beton m3 7,40 Rp 1.980.000,00 Rp 14.648.262,93
29 Pek. Plat lantai m3 224,13 Rp 3.888.440,00 Rp 871.528.087,64
30 Pek. Plat tangga beton m3 15,06 Rp 2.980.000,00 Rp 44.885.115,48
31 Pek. Listplank beton tangga m3 1,77 Rp 550.000,00 Rp 972.077,58
32 Pek. Kolom beton K1 50x100 cm m3 46,53 Rp 5.540.510,00 Rp 257.808.070,69
33 Pek. Kolom beton K2 50x100 cm m3 19,16 Rp 4.946.700,00 Rp 94.778.854,86
34 Pek. Kolom beton K3 40x80 cm m3 3,50 Rp 4.585.820,00 Rp 16.066.630,95
35 Pek. Kolom beton K4 30x60 cm m3 6,90 Rp 4.850.040,00 Rp 33.453.665,15
36 Pek. Kolom beton K5 40x40 cm m3 1,75 Rp 4.256.070,00 Rp 7.455.668,34
37 Pek. Kolom beton 15x15 cm m3 7,40 Rp 3.115.070,00 Rp 23.045.638,59

IX 8TH FLOOR Rp 2.325.540.263


1 Pek. Balok Beton B1 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
2 Pek. Balok Beton B2-B4 40x70 m3 9,20 Rp 5.495.840,00 Rp 50.544.185,50
3 Pek. Balok Beton B5-B7 40x70 m3 9,20 Rp 5.495.840,00 Rp 50.544.185,50
4 Pek. Balok Beton B8 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
5 Pek. Balok Beton B9-B15 40x70 m3 21,46 Rp 5.495.840,00 Rp 117.936.432,83
6 Pek. Balok Beton B16 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
7 Pek. Balok Beton B17-B22 40x70 m3 18,39 Rp 5.495.840,00 Rp 101.088.371,00
8 Pek. Balok Beton B23 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
9 Pek. Balok Beton B24 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
10 Pek. Balok Beton B25 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
11 Pek. Balok Beton B26-B29 40x70 m3 12,26 Rp 5.495.840,00 Rp 67.392.247,33
12 Pek. Balok Beton B30 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
13 Pek. Balok Beton B31 40x80 m3 4,57 Rp 5.556.970,00 Rp 25.379.361,94
14 Pek. Balok Beton B32-B33 40x80 m3 9,13 Rp 5.556.970,00 Rp 50.758.723,88
15 Pek. Balok Beton B35-B36 40x80 m3 9,13 Rp 5.556.970,00 Rp 50.758.723,88
16 Pek. Balok Beton B37 40x80 m3 4,57 Rp 5.556.970,00 Rp 25.379.361,94
17 Pek. Balok Beton B38 40x80 m3 4,57 Rp 5.556.970,00 Rp 25.379.361,94
18 Pek. Balok Beton B39-B40 30x45 m3 0,80 Rp 5.194.950,00 Rp 4.143.919,82
19 Pek. Balok Beton SB1 20x65 m3 54,45 Rp 4.469.110,00 Rp 243.323.952,96
20 Pek. Balok Beton SB2 20x45 m3 10,57 Rp 3.696.980,00 Rp 39.088.912,93
21 Pek. Balok Beton SB3 20x50 m3 1,66 Rp 4.469.110,00 Rp 7.409.462,51
23 Pek. Balok Beton BC1 20x35 m3 0,61 Rp 3.376.690,00 Rp 2.059.755,14
24 Pek. Balok Beton BC2 30x45 m3 0,56 Rp 5.194.950,00 Rp 2.925.119,87
25 Pek. Balok Beton BC3 15x30 m3 0,09 Rp 3.122.890,00 Rp 293.067,55
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Struktur
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH
I BASEMENT FLOOR Rp 12.458.576.669
26 Pek. Balok Beton BL 15x30 m3 1,22 Rp 3.122.890,00 Rp 3.809.878,14
27 Pek. Shearwall beton m3 15,20 Rp 2.710.120,00 Rp 41.201.647,47
28 Pek. Corewall beton m3 7,40 Rp 1.980.000,00 Rp 14.648.262,93
29 Pek. Plat lantai m3 224,13 Rp 3.888.440,00 Rp 871.528.087,64
30 Pek. Plat tangga beton m3 15,06 Rp 298.000,00 Rp 4.488.511,55
31 Pek. Listplank beton tangga m3 1,77 Rp 550.000,00 Rp 972.077,58
32 Pek. Kolom beton K1 50x100 cm m3 46,53 Rp 5.540.510,00 Rp 257.808.070,69
33 Pek. Kolom beton K2 50x100 cm m3 19,16 Rp 4.946.700,00 Rp 94.778.854,86
34 Pek. Kolom beton K3 40x80 cm m3 3,50 Rp 4.585.820,00 Rp 16.066.630,95
35 Pek. Kolom beton K4 30x60 cm m3 6,90 Rp 4.850.040,00 Rp 33.453.665,15
36 Pek. Kolom beton K5 40x40 cm m3 1,75 Rp 4.256.070,00 Rp 7.455.668,34
37 Pek. Kolom beton 15x15 cm m3 7,40 Rp 3.115.070,00 Rp 23.045.638,59

X ROOF FLOOR Rp 2.053.178.675


1 Pek. Balok Beton B1 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
2 Pek. Balok Beton B2 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
3 Pek. Balok Beton B3-B5 40x70 m3 9,20 Rp 5.495.840,00 Rp 50.544.185,50
4 Pek. Balok Beton B6 40x70 m3 6,23 Rp 5.495.840,00 Rp 34.211.880,66
5 Pek. Balok Beton B7 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
6 Pek. Balok Beton B8 30x45 m3 0,74 Rp 5.194.950,00 Rp 3.818.906,50
7 Pek. Balok Beton B9 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
8 Pek. Balok Beton B10-B14 40x70 m3 15,33 Rp 5.495.840,00 Rp 84.240.309,16
9 Pek. Balok Beton B15 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
10 Pek. Balok Beton B16 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
11 Pek. Balok Beton B17-B21 40x70 m3 15,33 Rp 5.495.840,00 Rp 84.240.309,16
12 Pek. Balok Beton B22 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
13 Pek. Balok Beton B23-B24 40x70 m3 6,13 Rp 5.495.840,00 Rp 33.696.123,67
14 Pek. Balok Beton B25-B26 40x70 m3 6,13 Rp 5.495.840,00 Rp 33.696.123,67
15 Pek. Balok Beton B27 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
16 Pek. Balok Beton B28 40x70 m3 6,13 Rp 5.495.840,00 Rp 33.696.123,67
17 Pek. Balok Beton B29 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
18 Pek. Balok Beton B30 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
19 Pek. Balok Beton B31 40x80 m3 4,57 Rp 5.556.970,00 Rp 25.379.361,94
20 Pek. Balok Beton B32-B33 40x80 m3 9,13 Rp 5.556.970,00 Rp 50.758.723,88
21 Pek. Balok Beton B34-B38 40x80 m3 22,85 Rp 5.556.970,00 Rp 126.983.725,33
23 Pek. Balok Beton SB1 20x65 m3 30,61 Rp 4.469.110,00 Rp 136.795.454,16
24 Pek. Balok Beton SB2 20x45 m3 11,92 Rp 3.696.980,00 Rp 44.061.762,80
26 Pek. Balok Beton BC1 20x35 m3 0,61 Rp 3.376.690,00 Rp 2.059.755,14
27 Pek. Balok Beton BC2 30x45 m3 0,56 Rp 5.194.950,00 Rp 2.925.119,87
28 Pek. Balok Beton BC3 15x30 m3 0,09 Rp 3.122.890,00 Rp 293.067,55
29 Pek. Balok Beton BL 15x30 m3 1,22 Rp 3.122.890,00 Rp 3.809.878,14
30 Pek. Shearwall beton m3 15,20 Rp 1.980.000,00 Rp 30.101.715,78
31 Pek. Corewall beton m3 7,40 Rp 1.980.000,00 Rp 14.648.262,93
30 Pek. Plat lantai m3 229,84 Rp 3.888.440,00 Rp 893.726.814,23
31 Pek. Plat tangga beton m3 3,77 Rp 2.950.000,00 Rp 11.119.848,09
32 Pek. Listplank beton tangga m3 1,33 Rp 550.000,00 Rp 731.208,80
33 Pek. Kolom beton K1 50x100 cm m3 0,74 Rp 5.540.510,00 Rp 4.072.934,23
34 Pek. Kolom beton K2 50x100 cm m3 9,20 Rp 4.946.700,00 Rp 45.493.850,33
35 Pek. Kolom beton K3 40x80 cm m3 9,20 Rp 4.585.820,00 Rp 42.174.906,25
36 Pek. Kolom beton K4 30x60 cm m3 0,74 Rp 4.850.040,00 Rp 3.565.356,60
37 Pek. Kolom beton K5 40x40 cm m3 21,46 Rp 4.256.070,00 Rp 91.331.937,19
38 Pek. Kolom beton 15x15 cm m3 3,07 Rp 3.115.070,00 Rp 9.549.566,94

XI ROOF TOP FLOOR Rp 281.414.817


1 Pek. Balok Beton B13-B14 40x70 m3 6,13 Rp 5.495.840,00 Rp 33.696.123,67
2 Pek. Balok Beton B6 40x70 m3 6,13 Rp 5.495.840,00 Rp 33.696.123,67
3 Pek. Balok Beton B28 40x70 m3 6,13 Rp 5.495.840,00 Rp 33.696.123,67
4 Pek. Balok Beton B29 40x70 m3 3,07 Rp 5.495.840,00 Rp 16.848.061,83
5 Pek. Balok Beton SB1 20x65 m3 2,85 Rp 4.469.110,00 Rp 12.721.907,34
6 Pek. Balok Beton SB2 20x45 m3 1,97 Rp 3.696.980,00 Rp 7.285.803,30
7 Pek. Plat lantai m3 36,90 Rp 3.888.440,00 Rp 143.470.674,02
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Struktur
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH
I BASEMENT FLOOR Rp 12.458.576.669
Jumlah Rp 32.855.172.381
REKAPITULASI
BILL OF QUANTITY
PEMBANGUNAN HOTEL WISANTI YOGYAKARTA
PEKERJAAN ARSITEKTUR

NO URAIAN PEKERJAAN JUMLAH

A. PEKERJAAN PERSIAPAN Rp. 1.427.625.000,00

B. PEKERJAAN TANAH / GALIAN DAN PASIR Rp. 2.800.000.000,00

C. PEKERJAAN DINDING Rp. 9.178.172.800,98


I BASEMENT FLOOR Rp. 445.346.437,77
II 1st FLOOR Rp. 818.935.122,88
III 2nd FLOOR Rp. 1.384.374.489,13
IV 3rd FLOOR Rp. 809.916.729,90
V 4th FLOOR Rp. 1.139.187.959,89
VI 5th FLOOR Rp. 1.139.187.959,89
VII 6th FLOOR Rp. 1.083.849.836,85
VIII 7th FLOOR Rp. 1.083.849.836,85
IX 8th FLOOR Rp. 1.083.849.836,85
X ROOF FLOOR Rp. 115.210.273,32
XI ROOF TOP FLOOR Rp. 74.464.317,67

D. PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA Rp. 630.339.100,00


I BASEMENT FLOOR Rp. 11.781.300,00
II 1st FLOOR Rp. 35.975.000,00
III 2nd FLOOR Rp. 42.875.000,00
IV 3rd FLOOR Rp. 36.862.600,00
V 4th FLOOR Rp. 54.737.500,00
VI 5th FLOOR Rp. 71.175.000,00
VII 6th FLOOR Rp. 71.487.600,00
VIII 7th FLOOR Rp. 65.145.100,00
IX 8th FLOOR Rp. 240.300.000,00

E. PEKERJAAN LANTAI Rp. 5.658.959.116,27


I BASEMENT FLOOR Rp. 305.587.253,01
II 1st FLOOR Rp. 502.307.084,57
III 2nd FLOOR Rp. 422.449.673,55
IV 3rd FLOOR Rp. 237.870.270,98
V 4th FLOOR Rp. 647.710.280,54
VI 5th FLOOR Rp. 633.947.123,25
VII 6th FLOOR Rp. 633.947.123,25
VIII 7th FLOOR Rp. 633.947.123,25
IX 8th FLOOR Rp. 633.947.123,25
X ROOF FLOOR Rp. 837.869.813,07
XI ROOF TOP FLOOR Rp. 169.376.247,55

F. PEKERJAAN PLAFOND Rp. 6.871.908.178,63


I BASEMENT FLOOR Rp. 261.889.426,32
II 1st FLOOR Rp. 406.570.144,48
III 2nd FLOOR Rp. 1.255.353.689,01
IV 3rd FLOOR Rp. 1.416.585.491,48
V 4th FLOOR Rp. 695.631.226,12
VI 5th FLOOR Rp. 695.631.226,12
VII 6th FLOOR Rp. 695.631.226,12
VIII 7th FLOOR Rp. 695.631.226,12
IX 8th FLOOR Rp. 695.631.226,12
X ROOF FLOOR Rp. 44.501.577,89
REKAPITULASI
BILL OF QUANTITY
PEMBANGUNAN HOTEL WISANTI YOGYAKARTA
PEKERJAAN ARSITEKTUR

NO URAIAN PEKERJAAN JUMLAH


XI ROOF TOP FLOOR Rp. 8.851.718,84

G. PEKERJAAN PENGECATAN Rp. 3.443.217.924,88


I BASEMENT FLOOR Rp. 184.263.371,98
II 1st FLOOR Rp. 315.730.948,86
III 2nd FLOOR Rp. 519.970.732,37
IV 3rd FLOOR Rp. 418.095.759,74
V 4th FLOOR Rp. 418.095.759,74
VI 5th FLOOR Rp. 387.751.349,22
VII 6th FLOOR Rp. 349.457.301,40
VIII 7th FLOOR Rp. 349.457.301,40
IX 8th FLOOR Rp. 349.457.301,40
X ROOF FLOOR Rp. 109.288.150,86
XI ROOF TOP FLOOR Rp. 41.649.947,93

F. PEKERJAAN SANITASI Rp. 1.843.322.000,00


I BASEMENT FLOOR Rp. 5.049.600,00
II 1st FLOOR Rp. 76.867.100,00
III 2nd FLOOR Rp. 143.136.600,00
IV 3rd FLOOR Rp. 79.072.700,00
V 4th FLOOR Rp. 310.617.500,00
VI 5th FLOOR Rp. 310.617.500,00
VII 6th FLOOR Rp. 305.987.000,00
VIII 7th FLOOR Rp. 305.987.000,00
IX 8th FLOOR Rp. 305.987.000,00

G. PEKERJAAN TANGGA Rp. 715.971.975,00


I BASEMENT FLOOR Rp. 41.584.725,00
II 1st FLOOR Rp. 85.911.450,00
III 2nd FLOOR Rp. 85.911.450,00
IV 3rd FLOOR Rp. 85.911.450,00
V 4th FLOOR Rp. 79.035.450,00
VI 5th FLOOR Rp. 79.035.450,00
VII 6th FLOOR Rp. 79.035.450,00
VIII 7th FLOOR Rp. 79.035.450,00
IX 8th FLOOR Rp. 79.035.450,00
XI ROOF TOP FLOOR Rp. 21.475.650,00

H. PEKERJAAN KANOPI DAN TAMPAK (EKSTERIOR) Rp. 416.360.103,00

JUMLAH Rp. 32.985.876.198,76


BILL OF QUANTITY ( BQ )
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Persiapan
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

A. PEKERJAAN PERSIAPAN

1 Direksi Keet dan Kantor Kontraktor ls 1,00 Rp - -


2 Ketertiban, Keselamatan & Keamanan ls 1,00 Rp 6.062.500,00 6.062.500,00
3 Gudang Bahan dan Los Kerja ls 1,00 Rp - -
4 Pengukuran/ Bowplank ls 1,00 Rp - -
5 Rambu-Rambu K3 ls 1,00 Rp 2.812.500,00 2.812.500,00
6 Pagar Pengaman Proyek m' 130,00 Rp - -
7 Photo Progress, Manual & As Built Drawing ls 1,00 Rp 1.250.000,00 1.250.000,00
8 Listrik Kerja Sementara ls 1,00 Rp 18.750.000,00 18.750.000,00
9 Air Kerja Sementara ls 1,00 Rp 1.562.500,00 1.562.500,00
10 Asuransi Lengkap ( CAR dan Tenaga Kerja ) ls 1,00 Rp 19.375.000,00 19.375.000,00
11 Pembersihan Area Pekerjaan Selama Proyek Berlangsung ls 1,00 Rp 15.312.500,00 15.312.500,00
12 Sewa Tower Crane, Dozer, Alat bantu lainnya,.. ls 1,00 Rp 1.218.750.000,00 1.218.750.000,00
13 Mobilisasi dan Demobilisasi ls 1,00 Rp 56.250.000,00 56.250.000,00
14 Biaya kordinasi keamanan lingkungan dan lainya ls 1,00 Rp 25.000.000,00 25.000.000,00
15 IMB dan peizinan lainnya ls 1,00 Rp 62.500.000,00 62.500.000,00

Jumlah Rp 1.427.625.000,00
BILL OF QUANTITY ( BQ )
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Dinding
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

B. PEKERJAAN DINDING

I BASEMENT FLOOR Rp 445.346.437,77


1 Pek. Pasangan Dinding Bata Ringan m2 1431,37 Rp 171.300,00 Rp 245.194.162,98
2 Pek. Acian Dinding m2 2862,73 Rp 33.500,00 Rp 95.901.401,38
3 Pek. Acian Beton m2 858,82 Rp 50.000,00 Rp 42.940.839,85
4 Pek. Keramik 30x30 cm ex roman (06) m2 290,27 Rp 177.900,00 Rp 51.639.906,31
5 Pek. Plint keramik t 10 cm m' 181,43 Rp 53.300,00 Rp 9.670.127,25

II 1ST FLOOR Rp 818.935.122,88


1 Pek. Pasangan Dinding Bata Ringan m2 2147,04 Rp 171.300,00 Rp 367.788.293,32
2 Pek. Acian Dinding m2 4294,10 Rp 33.500,00 Rp 143.852.390,64
3 Pek. Acian Beton m2 1288,23 Rp 50.000,00 Rp 64.411.259,78
4 Pek. Wall finish (16) by interior m2 0,00 Rp 18.800,00 Rp by order
5 Pek. Marble polished ( 17) m2 33,39 Rp Rp -
6 Pek. Plint Marble polished m2 4,89 Rp 56.300,00 Rp 275.462,26
7 Pek. Keramik 30x30 cm ( 06) m2 287,79 Rp 177.900,00 Rp 51.198.565,78
8 Pek. Plint keramik t 10 cm m' 164,44 Rp 53.300,00 Rp 8.764.729,33
9 Pek. Partisi kaca 12 mm frameless (08) m2 56,78 Rp 856.300,00 Rp 48.623.757,22
10 Pek. Pasangan natural stone ( 11) m2 56,78 Rp 311.400,00 Rp 17.682.398,69
11 Pek. Granit Tile 30x60 cm (26) m2 239,44 Rp 461.600,00 Rp 110.523.206,14
12 Pek. Plint Granit Tile t 10 cm m' 136,82 Rp 42.500,00 Rp 5.815.059,73

III 2ND FLOOR Rp 1.384.374.489,13


1 Pek. Pasangan Dinding Bata Ringan m2 3220,57 Rp 171.300,00 Rp 551.683.915,55
2 Pek. Acian Dinding m2 6441,14 Rp 33.500,00 Rp 215.778.297,38
3 Pek. Acian Beton m2 1932,35 Rp 50.000,00 Rp 96.617.320,36
4 Pek. Partisi kaca 12 mm frameless (08) m2 391,39 Rp 856.300,00 Rp 335.143.967,40
5 Pek. Keramik 30x30 cm ( 06) m2 282,42 Rp 177.900,00 Rp 50.242.327,98
6 Pek. Plint keramik t 10 cm m' 161,37 Rp 53.300,00 Rp 8.601.280,22
7 Pek. Wall finish (16) by interior m2 0,00 Rp 18.800,00 Rp by order
8 Pek. Marble polished ( 17) m2 33,39 Rp Rp -
9 Pek. Plint Marble polished m2 4,89 Rp 56.300,00 Rp 275.462,26
10 Pek. Granit tile 30x60 cm (26) m2 259,39 Rp 461.600,00 Rp 119.732.147,91
11 Pek. Plint Granit Tile t 10 cm m' 148,23 Rp 42.500,00 Rp 6.299.770,07

IV 3RD FLOOR Rp 809.916.729,90


1 Pek. Pasangan Dinding Bata Ringan m2 2010,79 Rp 171.300,00 Rp 344.447.570,25
2 Pek. Acian Dinding m2 4710,71 Rp 33.500,00 Rp 157.808.757,95
3 Pek. Acian Beton m2 1413,21 Rp 50.000,00 Rp 70.660.724,03
4 Pek. Keramik 30x30 cm ( 06) m2 152,69 Rp 177.900,00 Rp 27.163.896,35
5 Pek. Plint keramik t 10 cm m' 36,18 Rp 53.300,00 Rp 1.928.332,28
6 Pek. Wall finish (16) by interior m2 800,90 Rp 18.800,00 Rp 15.056.848,44
7 Pek. Partisi kaca 12 mm frameless (08) m2 50,41 Rp 856.300,00 Rp 43.165.386,42
8 Pek. Marble polished ( 17) m2 33,39 Rp Rp -
9 Pek. Plint Marble polished m2 4,89 Rp 56.300,00 Rp 275.462,26
10 Pek. Granit tile 30x60 cm (26) m2 316,89 Rp 461.600,00 Rp 146.277.439,46
11 Pek. Plint Granit Tile t 10 cm m' 73,70 Rp 42.500,00 Rp 3.132.312,46

V 4TH FLOOR Rp 1.139.187.959,89


1 Pek. Pasangan Dinding Bata Ringan m2 1995,07 Rp 171.300,00 Rp 341.756.112,49
2 Pek. Acian Dinding m2 5023,81 Rp 33.500,00 Rp 168.297.676,14
3 Pek. Acian Beton m2 1507,14 Rp 50.000,00 Rp 75.357.082,28
4 Pek. Wall finish (16) by interior m2 0,00 Rp 18.800,00 Rp by order
5 Pek. Granit tile 30x60 cm (26) m2 1199,69 Rp 461.600,00 Rp 553.777.088,97

VI 5TH FLOOR Rp 1.139.187.959,89


1 Pek. Pasangan Dinding Bata Ringan m2 1995,07 Rp 171.300,00 Rp 341.756.112,49
2 Pek. Acian Dinding m2 5023,81 Rp 33.500,00 Rp 168.297.676,14
3 Pek. Acian Beton m2 1507,14 Rp 50.000,00 Rp 75.357.082,28
4 Pek. Wall finish (16) by interior m2 0,00 Rp 18.800,00 Rp by order
5 Pek. Granit tile 30x60 cm (26) m2 1199,69 Rp 461.600,00 Rp 553.777.088,97
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Dinding
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

VII 6TH FLOOR Rp 1.083.849.836,85


1 Pek. Pasangan Dinding Bata Ringan m2 1995,07 Rp 171.300,00 Rp 341.756.112,49
2 Pek. Acian Dinding m2 5023,81 Rp 33.500,00 Rp 168.297.676,14
3 Pek. Acian Beton m2 400,38 Rp 50.000,00 Rp 20.018.959,24
4 Pek. Wall finish (16) by interior m2 0,00 Rp 18.800,00 Rp by order
5 Pek. Granit tile 30x60 cm (26) m2 1199,69 Rp 461.600,00 Rp 553.777.088,97

VIII 7TH FLOOR Rp 1.083.849.836,85


1 Pek. Pasangan Dinding Bata Ringan m2 1995,07 Rp 171.300,00 Rp 341.756.112,49
2 Pek. Acian Dinding m2 5023,81 Rp 33.500,00 Rp 168.297.676,14
3 Pek. Acian Beton m2 400,38 Rp 50.000,00 Rp 20.018.959,24
4 Pek. Wall finish (16) by interior m2 0,00 Rp 18.800,00 Rp by order
5 Pek. Granit tile 30x60 cm (26) m2 1199,69 Rp 461.600,00 Rp 553.777.088,97

IX 8TH FLOOR Rp 1.083.849.836,85


1 Pek. Pasangan Dinding Bata Ringan m2 1995,07 Rp 171.300,00 Rp 341.756.112,49
2 Pek. Acian Dinding m2 5023,81 Rp 33.500,00 Rp 168.297.676,14
3 Pek. Acian Beton m2 400,38 Rp 50.000,00 Rp 20.018.959,24
4 Pek. Wall finish (16) by interior m2 0,00 Rp 18.800,00 Rp by order
5 Pek. Granit tile 30x60 cm (26) m2 1199,69 Rp 461.600,00 Rp 553.777.088,97

X ROOF FLOOR Rp 115.210.273,32


1 Pek. Pasangan Dinding Bata Ringan m2 429,41 Rp 171.300,00 Rp 73.557.658,66
2 Pek. Acian Dinding m2 858,82 Rp 33.500,00 Rp 28.770.362,70
3 Pek. Acian Beton m2 257,65 Rp 50.000,00 Rp 12.882.251,96

XI ROOF TOP FLOOR Rp 74.464.317,67


1 Pek. Pasangan Dinding Bata Ringan m2 277,54 Rp 171.300,00 Rp 47.543.184,80
2 Pek. Acian Dinding m2 555,07 Rp 33.500,00 Rp 18.594.830,81
3 Pek. Acian Beton m2 166,53 Rp 50.000,00 Rp 8.326.302,07

Jumlah Rp 9.178.172.800,98
BILL OF QUANTITY ( BQ )
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Pintu dan Jendela
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

D. PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA


TERMASUK ACCESSORIES LENGKAP TERPASANG
( spesifikasi teknis lihat gambar dan RKS )

JENDELA
I BASEMENT FLOOR Rp 1.406.300,00
1 Pas. Jendela AW-1 unit 1,00 Rp 1.031.300,00 Rp 1.031.300,00
2 Pas. Jendela BW-1 unit 1,00 Rp 375.000,00 Rp 375.000,00

II 1ST FLOOR Rp 17.350.000,00


1 Pas. Jendela AW-4 unit 1,00 Rp 1.062.500,00 Rp 1.062.500,00
2 Pas. Jendela AW-5 unit 1,00 Rp 937.500,00 Rp 937.500,00
3 Pas. Jendela AW-5A unit 1,00 Rp 937.500,00 Rp 937.500,00
4 Pas. Jendela AW-5B unit 1,00 Rp 937.500,00 Rp 937.500,00
5 Pas. Jendela FR-1 unit 2,00 Rp 1.062.500,00 Rp 2.125.000,00
6 Pas. Jendela FR-1A unit 2,00 Rp 1.125.000,00 Rp 2.250.000,00
7 Pas. Jendela FR-1B unit 1,00 Rp 937.500,00 Rp 937.500,00
8 Pas. Jendela FR-1C unit 1,00 Rp 937.500,00 Rp 937.500,00
9 Pas. Jendela BW-1A unit 1,00 Rp 625.000,00 Rp 625.000,00
10 Pas. Jendela BW-1A unit 1,00 Rp 625.000,00 Rp 625.000,00
11 Pas. Jendela BW-2 unit 1,00 Rp 500.000,00 Rp 500.000,00
12 Pas. Jendela BW-2A unit 1,00 Rp 562.500,00 Rp 562.500,00
13 Pas. Jendela AW-9 unit 3,00 Rp 587.500,00 Rp 1.762.500,00
9 Pas. Jendela AW-8 unit 1,00 Rp 587.500,00 Rp 587.500,00
10 Pas. Jendela AW-6 unit 1,00 Rp 625.000,00 Rp 625.000,00
11 Pas. Jendela AW-2 unit 1,00 Rp 1.062.500,00 Rp 1.062.500,00
12 Pas. Jendela AW-3 unit 1,00 Rp 875.000,00 Rp 875.000,00
Rp - Rp -

III 2ND FLOOR Rp 17.812.500,00


1 Pas. Jendela AW-2 unit 1,00 Rp 1.187.500,00 Rp 1.187.500,00
2 Pas. Jendela AW-6 unit 1,00 Rp 625.000,00 Rp 625.000,00
3 Pas. Jendela AW-3B unit 1,00 Rp 625.000,00 Rp 625.000,00
4 Pas. Jendela AW-4B unit 1,00 Rp 625.000,00 Rp 625.000,00
5 Pas. Jendela FR-2 unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
6 Pas. Jendela AW-8 unit 1,00 Rp 625.000,00 Rp 625.000,00
7 Pas. Jendela AW-12 unit 1,00 Rp 625.000,00 Rp 625.000,00
8 Pas. Jendela AW-10 unit 7,00 Rp 625.000,00 Rp 4.375.000,00
9 Pas. Jendela AW-9 unit 3,00 Rp 1.125.000,00 Rp 3.375.000,00
10 Pas. Jendela AW-7 unit 2,00 Rp 1.125.000,00 Rp 2.250.000,00
11 Pas. Jendela AW-11 unit 1,00 Rp 875.000,00 Rp 875.000,00
12 Pas. Jendela AW-11A unit 1,00 Rp 625.000,00 Rp 625.000,00
13 Pas. Jendela AW-11B unit 1,00 Rp 875.000,00 Rp 875.000,00

IV 3RD FLOOR Rp 11.862.600,00


1 Pas. Jendela AW-2 unit 1,00 Rp 1.187.500,00 Rp 1.187.500,00
2 Pas. Jendela AW-6 unit 1,00 Rp 625.000,00 Rp 625.000,00
3 Pas. Jendela AW-8 unit 1,00 Rp 531.300,00 Rp 531.300,00
4 Pas. Jendela AW-13 unit 1,00 Rp 1.312.500,00 Rp 1.312.500,00
5 Pas. Jendela AW-13A unit 1,00 Rp 875.000,00 Rp 875.000,00
6 Pas. Jendela AW-10 unit 7,00 Rp 625.000,00 Rp 4.375.000,00
7 Pas. Jendela AW-10 unit 1,00 Rp 625.000,00 Rp 625.000,00
8 Pas. Jendela AW-10 unit 1,00 Rp 625.000,00 Rp 625.000,00
9 Pas. Jendela AW-12 unit 1,00 Rp 531.300,00 Rp 531.300,00
10 Pas. Jendela AW-9 unit 1,00 Rp 587.500,00 Rp 587.500,00
11 Pas. Jendela AW-9 unit 1,00 Rp 587.500,00 Rp 587.500,00

V 4TH FLOOR Rp 18.112.500,00


1 Pas. Jendela AW-14 unit 25,00 Rp 587.500,00 Rp 14.687.500,00
2 Pas. Jendela AW-7 unit 2,00 Rp 1.125.000,00 Rp 2.250.000,00
3 Pas. Jendela AW-9 unit 1,00 Rp 587.500,00 Rp 587.500,00
4 Pas. Jendela AW-9 unit 1,00 Rp 587.500,00 Rp 587.500,00
Rp - Rp -
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Pintu dan Jendela
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

VI 5TH FLOOR Rp 31.550.000,00


1 Pas. Jendela AW-14 unit 25,00 Rp 1.125.000,00 Rp 28.125.000,00
2 Pas. Jendela AW-7 unit 2,00 Rp 1.125.000,00 Rp 2.250.000,00
3 Pas. Jendela AW-9 unit 1,00 Rp 587.500,00 Rp 587.500,00
4 Pas. Jendela AW-9 unit 1,00 Rp 587.500,00 Rp 587.500,00

VII 6TH FLOOR Rp 31.550.000,00


1 Pas. Jendela AW-14 unit 25,00 Rp 1.125.000,00 Rp 28.125.000,00
2 Pas. Jendela AW-7 unit 2,00 Rp 1.125.000,00 Rp 2.250.000,00
3 Pas. Jendela AW-9 unit 1,00 Rp 587.500,00 Rp 587.500,00
4 Pas. Jendela AW-9 unit 1,00 Rp 587.500,00 Rp 587.500,00

VIII 7TH FLOOR Rp 31.550.000,00


1 Pas. Jendela AW-14 unit 25,00 Rp 1.125.000,00 Rp 28.125.000,00
2 Pas. Jendela AW-7 unit 2,00 Rp 1.125.000,00 Rp 2.250.000,00
3 Pas. Jendela AW-9 unit 1,00 Rp 587.500,00 Rp 587.500,00
4 Pas. Jendela AW-9 unit 1,00 Rp 587.500,00 Rp 587.500,00

IX 8TH FLOOR Rp 31.550.000,00


1 Pas. Jendela AW-14 unit 25,00 Rp 1.125.000,00 Rp 28.125.000,00
2 Pas. Jendela AW-7 unit 2,00 Rp 1.125.000,00 Rp 2.250.000,00
3 Pas. Jendela AW-9 unit 1,00 Rp 587.500,00 Rp 587.500,00
4 Pas. Jendela AW-9 unit 1,00 Rp 587.500,00 Rp 587.500,00

PINTU
I BASEMENT FLOOR Rp 10.375.000,00
1 Pas. Pintu AD-2 unit 1,00 Rp 625.000,00 Rp 625.000,00
2 Pas. Pintu SD-1 unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
3 Pas. Pintu SD-2 unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
4 Pas. Pintu AD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
5 Pas. Pintu WD-1A unit 1,00 Rp 375.000,00 Rp 375.000,00
6 Pas. Pintu FD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
7 Pas. Pintu SD-2 unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
8 Pas. Pintu SD-2 unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
9 Pas. Pintu SD-2 unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
10 Pas. Pintu SD-4 unit 1,00 Rp 625.000,00 Rp 625.000,00
11 Pas. Pintu SD-5 unit 1,00 Rp 625.000,00 Rp 625.000,00
12 Pas. Pintu SD-3 unit 1,00 Rp 625.000,00 Rp 625.000,00
13 Pas. Pintu SD-6 unit 1,00 Rp 625.000,00 Rp 625.000,00

II 1ST FLOOR Rp 18.625.000,00


1 Pas. Pintu GD-3 unit 1,00 Rp 875.000,00 Rp 875.000,00
2 Pas. Pintu GD-2 unit 1,00 Rp 875.000,00 Rp 875.000,00
3 Pas. Pintu WD-1 unit 1,00 Rp 875.000,00 Rp 875.000,00
4 Pas. Pintu SD-3 unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
5 Pas. Pintu SD-3 unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
6 Pas. Pintu SD-6 unit 1,00 Rp 625.000,00 Rp 625.000,00
7 Pas. Pintu WD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
8 Pas. Pintu GD-2 unit 1,00 Rp 875.000,00 Rp 875.000,00
9 Pas. Pintu WD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
10 Pas. Pintu WD-5 unit 1,00 Rp 625.000,00 Rp 625.000,00
11 Pas. Pintu WD-5 unit 1,00 Rp 625.000,00 Rp 625.000,00
12 Pas. Pintu WD-4 unit 3,00 Rp 625.000,00 Rp 1.875.000,00
13 Pas. Pintu GD-1 unit 2,00 Rp 625.000,00 Rp 1.250.000,00
14 Pas. Pintu WD-2 unit 1,00 Rp 937.500,00 Rp 937.500,00
15 Pas. Pintu WD-1A unit 1,00 Rp 625.000,00 Rp 625.000,00
16 Pas. Pintu FD-1 unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
17 Pas. Pintu FD-1 unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
18 Pas. Pintu SD-5 unit 1,00 Rp 937.500,00 Rp 937.500,00
19 Pas. Pintu SD-5 unit 1,00 Rp 937.500,00 Rp 937.500,00
20 Pas. Pintu SD-6 unit 1,00 Rp 937.500,00 Rp 937.500,00

III 2ND FLOOR Rp 25.062.500,00


Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Pintu dan Jendela
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

1 Pas. Pintu WD-3 unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00


2 Pas. Pintu WD-3A unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
3 Pas. Pintu WD-1B unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
4 Pas. Pintu WD-1 unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
5 Pas. Pintu AD-2A unit 1,00 Rp 875.000,00 Rp 875.000,00
6 Pas. Pintu WD-2 unit 1,00 Rp 875.000,00 Rp 875.000,00
7 Pas. Pintu WD-1 unit 1,00 Rp 875.000,00 Rp 875.000,00
8 Pas. Pintu GD-1A unit 1,00 Rp 875.000,00 Rp 875.000,00
9 Pas. Pintu WD-1 unit 1,00 Rp 875.000,00 Rp 875.000,00
10 Pas. Pintu FD-1 unit 1,00 Rp 875.000,00 Rp 875.000,00
11 Pas. Pintu FD-1 unit 1,00 Rp 875.000,00 Rp 875.000,00
12 Pas. Pintu AD-2 unit 1,00 Rp 875.000,00 Rp 875.000,00
13 Pas. Pintu WD-5 unit 1,00 Rp 937.500,00 Rp 937.500,00
14 Pas. Pintu WD-3 unit 1,00 Rp 937.500,00 Rp 937.500,00
15 Pas. Pintu WD-3 unit 1,00 Rp 937.500,00 Rp 937.500,00
16 Pas. Pintu WD-1B unit 1,00 Rp 937.500,00 Rp 937.500,00
17 Pas. Pintu WD-1 unit 1,00 Rp 937.500,00 Rp 937.500,00
18 Pas. Pintu WD-1 unit 1,00 Rp 937.500,00 Rp 937.500,00
19 Pas. Pintu WD-1A unit 1,00 Rp 937.500,00 Rp 937.500,00
20 Pas. Pintu WD-1A unit 1,00 Rp 937.500,00 Rp 937.500,00
21 Pas. Pintu WD-1A unit 1,00 Rp 875.000,00 Rp 875.000,00
22 Pas. Pintu GD-2B unit 1,00 Rp 875.000,00 Rp 875.000,00
23 Pas. Pintu WD-1A unit 1,00 Rp 625.000,00 Rp 625.000,00
24 Pas. Pintu WD-1A unit 1,00 Rp 875.000,00 Rp 875.000,00
25 Pas. Pintu SD-5 unit 1,00 Rp 937.500,00 Rp 937.500,00
26 Pas. Pintu SD-3 unit 1,00 Rp 937.500,00 Rp 937.500,00
27 Pas. Pintu SD-6 unit 1,00 Rp 937.500,00 Rp 937.500,00

IV 3RD FLOOR Rp 25.000.000,00


1 Pas. Pintu WD-3B unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
2 Pas. Pintu WD-3B unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
3 Pas. Pintu WD-3B unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
4 Pas. Pintu WD-3A unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
5 Pas. Pintu WD-2A unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
6 Pas. Pintu WD-3A unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
7 Pas. Pintu WD-1A unit 3,00 Rp 1.125.000,00 Rp 3.375.000,00
8 Pas. Pintu FD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
9 Pas. Pintu FD-1 unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
10 Pas. Pintu SD-3 unit 10,00 Rp 625.000,00 Rp 6.250.000,00
11 Pas. Pintu SD-3 unit 10,00 Rp 625.000,00 Rp 6.250.000,00
12 Pas. Pintu SD-6 unit 1,00 Rp 625.000,00 Rp 625.000,00

V 4TH FLOOR Rp 36.625.000,00


1 Pas. Pintu WD-1 unit 1,00 Rp 875.000,00 Rp 875.000,00
2 Pas. Pintu WD-1A unit 11,00 Rp 875.000,00 Rp 9.625.000,00
3 Pas. Pintu WD-1 unit 1,00 Rp 875.000,00 Rp 875.000,00
4 Pas. Pintu WD-1A unit 14,00 Rp 625.000,00 Rp 8.750.000,00
5 Pas. Pintu WD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
6 Pas. Pintu SD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
7 Pas. Pintu WD-1 unit 1,00 Rp 875.000,00 Rp 875.000,00
8 Pas. Pintu FD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
9 Pas. Pintu FD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
10 Pas. Pintu SD-3 unit 10,00 Rp 625.000,00 Rp 6.250.000,00
11 Pas. Pintu SD-3 unit 10,00 Rp 625.000,00 Rp 6.250.000,00
12 Pas. Pintu SD-6 unit 1,00 Rp 625.000,00 Rp 625.000,00
Rp - Rp -

VI 5TH FLOOR Rp 39.625.000,00


1 Pas. Pintu WD-1 unit 1,00 Rp 875.000,00 Rp 875.000,00
2 Pas. Pintu WD-1A unit 11,00 Rp 625.000,00 Rp 6.875.000,00
3 Pas. Pintu WD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
4 Pas. Pintu WD-1A unit 14,00 Rp 875.000,00 Rp 12.250.000,00
5 Pas. Pintu WD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
6 Pas. Pintu SD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Pintu dan Jendela
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

7 Pas. Pintu WD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00


8 Pas. Pintu FD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
9 Pas. Pintu FD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
10 Pas. Pintu SD-3 unit 10,00 Rp 875.000,00 Rp 8.750.000,00
11 Pas. Pintu SD-3 unit 10,00 Rp 625.000,00 Rp 6.250.000,00
12 Pas. Pintu SD-6 unit 1,00 Rp 875.000,00 Rp 875.000,00

VII 6TH FLOOR Rp 39.937.600,00


1 Pas. Pintu WD-1 unit 1,00 Rp 875.000,00 Rp 875.000,00
2 Pas. Pintu WD-1A unit 11,00 Rp 875.000,00 Rp 9.625.000,00
3 Pas. Pintu WD-1 unit 1,00 Rp 875.000,00 Rp 875.000,00
4 Pas. Pintu WD-1A unit 14,00 Rp 875.000,00 Rp 12.250.000,00
5 Pas. Pintu WD-1 unit 1,00 Rp 875.000,00 Rp 875.000,00
6 Pas. Pintu SD-1 unit 1,00 Rp 531.300,00 Rp 531.300,00
7 Pas. Pintu WD-1 unit 1,00 Rp 531.300,00 Rp 531.300,00
8 Pas. Pintu FD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
9 Pas. Pintu FD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
10 Pas. Pintu SD-3 unit 10,00 Rp 625.000,00 Rp 6.250.000,00
11 Pas. Pintu SD-3 unit 10,00 Rp 625.000,00 Rp 6.250.000,00
12 Pas. Pintu SD-6 unit 1,00 Rp 625.000,00 Rp 625.000,00

VIII 7TH FLOOR Rp 33.595.100,00


1 Pas. Pintu WD-1 unit 1,00 Rp 531.300,00 Rp 531.300,00
2 Pas. Pintu WD-1A unit 11,00 Rp 531.300,00 Rp 5.844.300,00
3 Pas. Pintu WD-1 unit 1,00 Rp 531.300,00 Rp 531.300,00
4 Pas. Pintu WD-1A unit 14,00 Rp 531.300,00 Rp 7.438.200,00
5 Pas. Pintu WD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
6 Pas. Pintu SD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
7 Pas. Pintu WD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
8 Pas. Pintu FD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
9 Pas. Pintu FD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
10 Pas. Pintu SD-3 unit 10,00 Rp 625.000,00 Rp 6.250.000,00
11 Pas. Pintu SD-3 unit 10,00 Rp 875.000,00 Rp 8.750.000,00
12 Pas. Pintu SD-6 unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00

IX 8TH FLOOR Rp 208.750.000,00


1 Pas. Pintu WD-1 unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
2 Pas. Pintu WD-1A unit 11,00 Rp 1.125.000,00 Rp 12.375.000,00
3 Pas. Pintu WD-1 unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
4 Pas. Pintu WD-1A unit 14,00 Rp 1.125.000,00 Rp 15.750.000,00
5 Pas. Pintu WD-1 unit 1,00 Rp 1.125.000,00 Rp 1.125.000,00
6 Pas. Pintu SD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
7 Pas. Pintu WD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
8 Pas. Pintu FD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
9 Pas. Pintu FD-1 unit 1,00 Rp 625.000,00 Rp 625.000,00
10 Pas. Pintu SD-3 unit 10,00 Rp 875.000,00 Rp 8.750.000,00
11 Pas. Pintu SD-3 unit 10,00 Rp 875.000,00 Rp 8.750.000,00
12 Pas. Pintu SD-6 unit 1,00 Rp 875.000,00 Rp 875.000,00
13 Pas. Pintu WD-6 ( All floor ) unit 139,00 Rp 1.125.000,00 Rp 156.375.000,00

Jumlah Rp 630.339.100,00
BILL OF QUANTITY ( BQ )
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Lantai
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

E. PEKERJAAN LANTAI

I BASEMENT FLOOR Rp 305.587.253,01


1 Pek. Urugan pasir t. 5 cm m3 25,55 Rp 270.600,00 Rp 6.913.400,42
2 Pek. Lantai keramik 30/30 (20) m2 507,06 Rp 195.000,00 Rp 98.876.141,33
3 Pek. Lantai keramik 30x30 anti slip (11) m2 3,97 Rp 195.000,00 Rp 774.968,51
4 Pas. Step nozing (05) m' 51,48 Rp 191.000,00 Rp 9.831.786,12
5 Pek. Floor Hardener (19) m2 1206,54 Rp 134.400,00 Rp 162.159.127,60
6 Pek. Floor finish (06) m2 64,68 Rp 22.500,00 Rp 1.455.407,90
8 Pas. Car stoper bh 35,33 Rp 93.800,00 Rp 3.313.597,56
9 Pek. Gutter m' 209,43 Rp 106.300,00 Rp 22.262.823,57

II 1ST FLOOR Rp 502.307.084,57


1 Pek. Urugan pasir t. 5 cm m3 65,14 Rp 270.600,00 Rp 17.626.610,56
2 Pek. Marmer ex. Kota Marmer m2 277,87 Rp Rp -
3 Pek. Stepnozing keramik 5x20 cm (05) m' 121,12 Rp 191.000,00 Rp 23.133.614,40
4 Pek. Floor finish (06) m2 64,68 Rp 22.500,00 Rp 1.455.407,90
5 Pek. Granit Tile 60x60 cm (07) m2 440,86 Rp 679.400,00 Rp 299.519.169,44
6 Pek. Granit Tile unpolished 30x60 cm (08) m2 93,29 Rp 679.400,00 Rp 63.378.780,84
7 Pek. Pasangan epoxy heavy duty (09) m2 29,11 Rp 885.300,00 Rp 25.767.776,85
8 Pek. Keramik 30x30 unpolished (011) m2 146,72 Rp 195.000,00 Rp 28.609.869,31
9 Pek. Wood deck flooring (012) m2 83,51 Rp 406.300,00 Rp 33.929.549,67
10 Pek. Lantai keramik 30/30 (20) m2 45,57 Rp 195.000,00 Rp 8.886.305,61

III 2ND FLOOR Rp 422.449.673,55


1 Pek. Urugan pasir t. 5 cm m3 49,04 Rp 270.600,00 Rp 13.270.314,79
2 Pek. Marmer ex. Kota Marmer m2 320,00 Rp Rp -
3 Pek. Parket kayu jati finish melamik (04) m' 401,18 Rp 481.300,00 Rp 193.087.677,47
4 Pek. Stepnozing keramik 5x20 cm (05) m' 121,12 Rp 191.000,00 Rp 23.133.614,40
5 Pek. Floor finish (06) m2 64,68 Rp 22.500,00 Rp 1.455.407,90
6 Pek. Granit Tile 60x60 cm (07) m2 141,90 Rp 679.400,00 Rp 96.405.348,67
7 Pek. Granit Tile unpolished 30x60 cm (08) m2 64,66 Rp 679.400,00 Rp 43.929.706,76
8 Pek. Keramik 30x30 unpolished (011) m2 3,38 Rp 195.000,00 Rp 659.338,29
9 Pek. Lantai keramik 30/30 (20) m2 259,02 Rp 195.000,00 Rp 50.508.265,28

IV 3RD FLOOR Rp 237.870.270,98


1 Pek. Urugan pasir t. 5 cm m3 36,06 Rp 270.600,00 Rp 9.757.283,16
2 Pek. Marmer ex. Kota Marmer m2 303,82 Rp Rp -
3 Pek. Stepnozing keramik 5x20 cm (05) m' 121,12 Rp 191.000,00 Rp 23.133.614,40
4 Pek. Floor finish (06) m2 64,68 Rp 22.500,00 Rp 1.455.407,90
5 Pek. Granit Tile 60x60 cm (07) m2 10,16 Rp 679.400,00 Rp 6.900.178,33
6 Pek. Granit Tile unpolished 30x60 cm (08) m2 56,90 Rp 679.400,00 Rp 38.658.141,95
7 Pek. Keramik 30x30 unpolished (011) m2 31,60 Rp 195.000,00 Rp 6.162.844,84
8 Pek. Karpet lapis underlayer (13) m2 681,97 Rp 150.000,00 Rp 102.295.843,65
9 Pek. Lantai keramik 30/30 (20) m2 253,88 Rp 195.000,00 Rp 49.506.956,75

V 4TH FLOOR Rp 647.710.280,54


1 Pek. Urugan pasir t. 5 cm m3 50,20 Rp 270.600,00 Rp 13.584.405,08
2 Pek. Marmer ex. Kota Marmer m2 313,00 Rp Rp -
3 Pek. Stepnozing keramik 5x20 cm (05) m' 75,70 Rp 191.000,00 Rp 14.458.509,00
4 Pek. Floor finish (06) m2 10,16 Rp 22.500,00 Rp 228.516,36
5 Pek. Granit Tile 60x60 cm (07) m2 703,82 Rp 679.400,00 Rp 478.178.072,48
6 Pek. Granit Tile unpolished 30x60 cm (08) m2 146,77 Rp 679.400,00 Rp 99.714.005,61
8 Pek. Karpet lapis underlayer (13) m2 130,33 Rp 150.000,00 Rp 19.549.266,75
9 Pk. Screed dan waterprofing plat dak m2 146,73 Rp 93.800,00 Rp 13.763.157,29
10 Pek. Lantai keramik 30/30 (20) m2 42,23 Rp 195.000,00 Rp 8.234.347,97

VI 5TH FLOOR Rp 633.947.123,25


1 Pek. Urugan pasir t. 5 cm m3 50,20 Rp 270.600,00 Rp 13.584.405,08
2 Pek. Marmer ex. Kota Marmer m2 140,00 Rp Rp -
3 Pek. Stepnozing keramik 5x20 cm (05) m' 75,70 Rp 191.000,00 Rp 14.458.509,00
4 Pek. Floor finish (06) m2 10,16 Rp 22.500,00 Rp 228.516,36
5 Pek. Granit Tile 60x60 cm (07) m2 703,82 Rp 679.400,00 Rp 478.178.072,48
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Lantai
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

6 Pek. Granit Tile unpolished 30x60 cm (08) m2 146,77 Rp 679.400,00 Rp 99.714.005,61


8 Pek. Kaper lapis underlayer (13) m2 130,33 Rp 150.000,00 Rp 19.549.266,75
9 Pek. Lantai keramik 30/30 (20) m2 42,23 Rp 195.000,00 Rp 8.234.347,97

VII 6TH FLOOR Rp 633.947.123,25


1 Pek. Urugan pasir t. 5 cm m3 50,20 Rp 270.600,00 Rp 13.584.405,08
2 Pek. Marmer ex. Kota Marmer m2 140,00 Rp Rp -
3 Pek. Stepnozing keramik 5x20 cm (05) m' 75,70 Rp 191.000,00 Rp 14.458.509,00
4 Pek. Floor finish (06) m2 10,16 Rp 22.500,00 Rp 228.516,36
5 Pek. Granit Tile 60x60 cm (07) m2 703,82 Rp 679.400,00 Rp 478.178.072,48
6 Pek. Granit Tile unpolished 30x60 cm (08) m2 146,77 Rp 679.400,00 Rp 99.714.005,61
8 Pek. Kaper lapis underlayer (13) m2 130,33 Rp 150.000,00 Rp 19.549.266,75
9 Pek. Lantai keramik 30/30 (20) m2 42,23 Rp 195.000,00 Rp 8.234.347,97

VIII 7TH FLOOR Rp 633.947.123,25


1 Pek. Urugan pasir t. 5 cm m3 50,20 Rp 270.600,00 Rp 13.584.405,08
2 Pek. Marmer ex. Kota Marmer m2 140,00 Rp Rp -
3 Pek. Stepnozing keramik 5x20 cm (05) m' 75,70 Rp 191.000,00 Rp 14.458.509,00
4 Pek. Floor finish (06) m2 10,16 Rp 22.500,00 Rp 228.516,36
5 Pek. Granit Tile 60x60 cm (07) m2 703,82 Rp 679.400,00 Rp 478.178.072,48
6 Pek. Granit Tile unpolished 30x60 cm (08) m2 146,77 Rp 679.400,00 Rp 99.714.005,61
8 Pek. Kaper lapis underlayer (13) m2 130,33 Rp 150.000,00 Rp 19.549.266,75
9 Pek. Lantai keramik 30/30 (20) m2 42,23 Rp 195.000,00 Rp 8.234.347,97

IX 8TH FLOOR Rp 633.947.123,25


1 Pek. Urugan pasir t. 5 cm m3 50,20 Rp 270.600,00 Rp 13.584.405,08
2 Pek. Marmer ex. Kota Marmer m2 140,00 Rp Rp -
3 Pek. Stepnozing keramik 5x20 cm (05) m' 75,70 Rp 191.000,00 Rp 14.458.509,00
4 Pek. Floor finish (06) m2 10,16 Rp 22.500,00 Rp 228.516,36
5 Pek. Granit Tile 60x60 cm (07) m2 703,82 Rp 679.400,00 Rp 478.178.072,48
6 Pek. Granit Tile unpolished 30x60 cm (08) m2 146,77 Rp 679.400,00 Rp 99.714.005,61
8 Pek. Kaper lapis underlayer (13) m2 130,33 Rp 150.000,00 Rp 19.549.266,75
9 Pek. Lantai keramik 30/30 (20) m2 42,23 Rp 195.000,00 Rp 8.234.347,97

X ROOF FLOOR Rp 837.869.813,07


1 Pek. Urugan pasir t. 5 cm m3 5,78 Rp 270.600,00 Rp 1.563.623,40
2 Pek. Stepnozing keramik 5x20 cm (05) m' 30,28 Rp 191.000,00 Rp 5.783.403,60
3 Pek. Floor finish (06) m2 39,74 Rp 22.500,00 Rp 894.194,44
4 Pek. Pasangan epoxy heavy duty (09) m2 75,86 Rp 885.300,00 Rp 67.161.526,74
5 Pek. Floor hardener beton atap dan waterproofing (19) m2 861,25 Rp 885.300,00 Rp 762.467.064,89

XI ROOF TOP FLOOR Rp 169.376.247,55


1 Pek. Urugan pasir t. 5 cm m3 9,42 Rp 270.600,00 Rp 2.550.276,60
2 Pek. Floor hardener beton atap dan waterproofing (19) m2 188,44 Rp 885.300,00 Rp 166.825.970,95

Jumlah Rp 5.658.959.116,27
BILL OF QUANTITY ( BQ )
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Plafon
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

E. PEKERJAAN PLAFOND

I BASEMENT FLOOR Rp 261.889.426,32


1 Pek. Acian Plafond beton ekspose (01) m2 1882,80 Rp 34.400,00 Rp 64.768.197,40
2 Pek. Plafond Gypsumboard 9 mm, rangka besi hollow (05) m2 45,33 Rp 471.300,00 Rp 21.362.552,89
3 Pek. List profil gypsum fin cat m' 48,24 Rp 32.000,00 Rp 1.543.628,80
4 Pek. Kanopi m2 67,03 Rp 2.598.900,00 Rp 174.215.047,24

II 1ST FLOOR Rp 406.570.144,48


1 Pek. Acian Plafond beton ekspose (01) m2 177,83 Rp 34.400,00 Rp 6.117.263,11
2 Pek. Exposed underside of floor fin cat ex ICI (02) m2 156,28 Rp 78.600,00 Rp 12.283.229,78
3 Pek. Plafond Gypsumboard 9 mm, rangka besi hollow (05) m2 577,10 Rp 471.300,00 Rp 271.988.900,29
4 Pek. Drop/up Plafond Gypsumboard 9 mm, rangka besi hollow m2 230,84 Rp 471.300,00 Rp 108.793.936,20
5 Pek. Ceilling by interior (08) m2 0,00 Rp 18.800,00 Rp by order
6 Pek. List profil gypsum fin cat m' 230,84 Rp 32.000,00 Rp 7.386.815,10

III 2ND FLOOR Rp 1.255.353.689,01


1 Pek. Acian Plafond beton ekspose (01) m2 138,22 Rp 34.400,00 Rp 4.754.776,39
2 Pek. Plafond Gypsumboard 9 mm, rangka besi hollow (05) m2 1859,30 Rp 471.300,00 Rp 876.286.885,36
3 Pek. Drop/up Plafond Gypsumboard 9 mm, rangka besi hollow m2 743,72 Rp 471.300,00 Rp 350.513.130,23
4 Pek. Ceilling by interior (08) m2 0,00 Rp 18.800,00 Rp by order
5 Pek. List profil gypsum fin cat m' 743,72 Rp 32.000,00 Rp 23.798.897,02

IV 3RD FLOOR Rp 1.416.585.491,48


1 Pek. Acian Plafond beton ekspose (01) m2 244,64 Rp 34.400,00 Rp 8.415.533,44
2 Pek. Plafond Gypsumboard 9 mm, rangka besi hollow (05) m2 2093,56 Rp 471.300,00 Rp 986.696.613,28
3 Pek. Drop/up Plafond Gypsumboard 9 mm, rangka besi hollow m2 837,42 Rp 471.300,00 Rp 394.675.397,49
4 Pek. Ceilling by interior (08) m2 0,00 Rp 18.800,00 Rp by order
5 Pek. List profil gypsum fin cat m' 837,44 Rp 32.000,00 Rp 26.797.947,26

V 4TH FLOOR Rp 695.631.226,12


1 Pek. Acian Plafond beton ekspose (01) m2 244,64 Rp 34.400,00 Rp 8.415.533,44
2 Pek. Plafond Gypsumboard 9 mm, rangka besi hollow (05) m2 1342,20 Rp 471.300,00 Rp 632.578.400,01
4 Pek. Ceilling by interior (08) m2 0,00 Rp 18.800,00 Rp by order
5 Pek. List profil gypsum fin cat m' 1707,42 Rp 32.000,00 Rp 54.637.292,67

VI 5TH FLOOR Rp 695.631.226,12


1 Pek. Acian Plafond beton ekspose (01) m2 244,64 Rp 34.400,00 Rp 8.415.533,44
2 Pek. Plafond Gypsumboard 9 mm, rangka besi hollow (05) m2 1342,20 Rp 471.300,00 Rp 632.578.400,01
4 Pek. Ceilling by interior (08) m2 0,00 Rp 18.800,00 Rp by order
5 Pek. List profil gypsum fin cat m' 1707,42 Rp 32.000,00 Rp 54.637.292,67

VII 6TH FLOOR Rp 695.631.226,12


1 Pek. Acian Plafond beton ekspose (01) m2 244,64 Rp 34.400,00 Rp 8.415.533,44
2 Pek. Plafond Gypsumboard 9 mm, rangka besi hollow (05) m2 1342,20 Rp 471.300,00 Rp 632.578.400,01
4 Pek. Ceilling by interior (08) m2 0,00 Rp 18.800,00 Rp by order
5 Pek. List profil gypsum fin cat m' 1707,42 Rp 32.000,00 Rp 54.637.292,67

VIII 7TH FLOOR Rp 695.631.226,12


1 Pek. Acian Plafond beton ekspose (01) m2 244,64 Rp 34.400,00 Rp 8.415.533,44
2 Pek. Plafond Gypsumboard 9 mm, rangka besi hollow (05) m2 1342,20 Rp 471.300,00 Rp 632.578.400,01
4 Pek. Ceilling by interior (08) m2 0,00 Rp 18.800,00 Rp by order
5 Pek. List profil gypsum fin cat m' 1707,42 Rp 32.000,00 Rp 54.637.292,67

IX 8TH FLOOR Rp 695.631.226,12


1 Pek. Acian Plafond beton ekspose (01) m2 244,64 Rp 34.400,00 Rp 8.415.533,44
2 Pek. Plafond Gypsumboard 9 mm, rangka besi hollow (05) m2 1342,20 Rp 471.300,00 Rp 632.578.400,01
4 Pek. Ceilling by interior (08) m2 0,00 Rp 18.800,00 Rp by order
5 Pek. List profil gypsum fin cat m' 1707,42 Rp 32.000,00 Rp 54.637.292,67

X ROOF FLOOR Rp 44.501.577,89


1 Pek. Acian Plafond beton ekspose m2 1293,65 Rp 34.400,00 Rp 44.501.577,89
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Plafon
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

XI ROOF TOP FLOOR Rp 8.851.718,84


1 Pek. Acian Plafond beton ekspose m2 257,32 Rp 34.400,00 Rp 8.851.718,84

Jumlah Rp 6.871.908.178,63
BILL OF QUANTITY ( BQ )
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Pengecatan
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

F. PEKERJAAN PENGECATAN

I BASEMENT FLOOR Rp 184.263.371,98


1 Pek. Pengecatan dinding eksterior m2 372,16 Rp 78.600,00 Rp 29.251.802,42
2 Pek. Pengecatan dinding interior m2 2290,19 Rp 34.600,00 Rp 79.240.698,52
3 Pek. Pengecatan plafond m2 1928,13 Rp 32.300,00 Rp 62.278.563,47
4 Pek. Pengecatan marka tempat parkir m1 584,08 Rp 23.100,00 Rp 13.492.307,58

II 1ST FLOOR Rp 315.730.948,86


1 Pek. Pengecatan dinding eksterior m2 2147,05 Rp 78.600,00 Rp 168.757.794,48
2 Pek. Pengecatan dinding interior m2 3435,29 Rp 34.600,00 Rp 118.861.047,77
3 Pek. Pengecatan plafond m2 870,34 Rp 32.300,00 Rp 28.112.106,61

III 2ND FLOOR Rp 519.970.732,37


1 Pek. Pengecatan dinding eksterior m2 3220,58 Rp 78.600,00 Rp 253.137.368,78
2 Pek. Pengecatan dinding interior m2 5152,93 Rp 34.600,00 Rp 178.291.273,61
3 Pek. Pengecatan plafond m2 2741,24 Rp 32.300,00 Rp 88.542.089,98

IV 3RD FLOOR Rp 418.095.759,74


1 Pek. Pengecatan dinding eksterior m2 2355,35 Rp 78.600,00 Rp 185.130.516,59
2 Pek. Pengecatan dinding interior m2 3768,57 Rp 34.600,00 Rp 130.392.419,08
3 Pek. Pengecatan plafond m2 3175,63 Rp 32.300,00 Rp 102.572.824,08

V 4TH FLOOR Rp 418.095.759,74


1 Pek. Pengecatan dinding eksterior m2 2355,35 Rp 78.600,00 Rp 185.130.516,59
2 Pek. Pengecatan dinding interior m2 3768,57 Rp 34.600,00 Rp 130.392.419,08
3 Pek. Pengecatan plafond m2 3175,63 Rp 32.300,00 Rp 102.572.824,08

VI 5TH FLOOR Rp 387.751.349,22


1 Pek. Pengecatan dinding eksterior m2 2511,92 Rp 78.600,00 Rp 197.436.802,13
2 Pek. Pengecatan dinding interior m2 4019,06 Rp 34.600,00 Rp 139.059.575,38
3 Pek. Pengecatan plafond m2 1586,84 Rp 32.300,00 Rp 51.254.971,71

VII 6TH FLOOR Rp 349.457.301,40


1 Pek. Pengecatan dinding eksterior m2 2511,92 Rp 78.600,00 Rp 197.436.802,13
2 Pek. Pengecatan dinding interior m2 2912,30 Rp 34.600,00 Rp 100.765.527,55
3 Pek. Pengecatan plafond m2 1586,84 Rp 32.300,00 Rp 51.254.971,71

VIII 7TH FLOOR Rp 349.457.301,40


1 Pek. Pengecatan dinding eksterior m2 2511,92 Rp 78.600,00 Rp 197.436.802,13
2 Pek. Pengecatan dinding interior m2 2912,30 Rp 34.600,00 Rp 100.765.527,55
3 Pek. Pengecatan plafond m2 1586,84 Rp 32.300,00 Rp 51.254.971,71

IX 8TH FLOOR Rp 349.457.301,40


1 Pek. Pengecatan dinding eksterior m2 2511,92 Rp 78.600,00 Rp 197.436.802,13
2 Pek. Pengecatan dinding interior m2 2912,30 Rp 34.600,00 Rp 100.765.527,55
3 Pek. Pengecatan plafond m2 1586,84 Rp 32.300,00 Rp 51.254.971,71

X ROOF FLOOR Rp 109.288.150,86


1 Pek. Pengecatan dinding eksterior m2 858,82 Rp 78.600,00 Rp 67.503.117,79
3 Pek. Pengecatan plafond m2 1293,65 Rp 32.300,00 Rp 41.785.033,07

XI ROOF TOP FLOOR Rp 41.649.947,93


1 Pek. Pengecatan dinding eksterior m2 277,54 Rp 78.600,00 Rp 21.814.949,40
2 Pek. Pengecatan dinding interior m2 333,05 Rp 34.600,00 Rp 11.523.622,13
3 Pek. Pengecatan plafond m2 257,32 Rp 32.300,00 Rp 8.311.376,40

Jumlah Rp 3.443.217.924,88
BILL OF QUANTITY ( BQ )
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Sanitary
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

G. PEKERJAAN SANITASI

I BASEMENT FLOOR Rp 5.049.600,00


1 Pas. Closet duduk monoblok lkp. Assesories ex. Toto unit 1,00 Rp 3.562.500,00 Rp 3.562.500,00
2 Pas. Paper holder ex. Toto bh 1,00 Rp 534.900,00 Rp 534.900,00
3 Pas. Jet washer ex. Toto bh 1,00 Rp 545.900,00 Rp 545.900,00
4 Pas. Floor drain stainless steel ex. Toto bh 1,00 Rp 406.300,00 Rp 406.300,00

II 1ST FLOOR Rp 76.867.100,00


1 Pas. Closet duduk monoblok lkp. Assesories ex. Toto unit 7,00 Rp 3.562.500,00 Rp 24.937.500,00
2 Pas. Paper holder ex. Toto bh 7,00 Rp 534.900,00 Rp 3.744.300,00
3 Pas. Jet washer ex. Toto bh 7,00 Rp 545.900,00 Rp 3.821.300,00
4 Pas. Floor drain stainless steel ex. Toto bh 11,00 Rp 406.300,00 Rp 4.469.300,00
5 Pas. Wastafel meja lkp. Assesories + kran ex. Toto ( 1 bh ) unit 1,00 Rp 2.000.000,00 Rp 2.000.000,00
6 Pas. Wastafel meja lkp. Assesories + kran ex. Toto ( 2 bh ) unit 2,00 Rp 1.900.000,00 Rp 3.800.000,00
7 Pas. Cermin (Rk. Kayu 4/6 + multipleks 9 mm + cermin tbl. 8 unit 5,00 Rp 1.218.800,00 Rp 6.094.000,00
mm) uk. 160x80 cm
8 Pas. Towel ring stainless Steel ex. Toto unit 1,00 Rp 1.031.300,00 Rp 1.031.300,00
9 Pas. Urinoir ex. Toto unit 5,00 Rp 2.156.300,00 Rp 10.781.500,00
10 Pas. Sekat urinoir ex Toto unit 3,00 Rp 1.062.500,00 Rp 3.187.500,00
10 Pas. Side & rear disable bar set 1,00 Rp 1.750.000,00 Rp 1.750.000,00
11 Pas. Cubical partisi unit 8,00 Rp 1.406.300,00 Rp 11.250.400,00

III 2ND FLOOR Rp 143.136.600,00


1 Pas. Closet duduk monoblok lkp. Assesories ex. Toto unit 8,00 Rp 3.562.500,00 Rp 28.500.000,00
2 Pas. Paper holder ex. Toto bh 8,00 Rp 534.900,00 Rp 4.279.200,00
3 Pas. Jet washer ex. Toto bh 8,00 Rp 545.900,00 Rp 4.367.200,00
4 Pas. Floor drain stainless steel ex. Toto bh 25,00 Rp 406.300,00 Rp 10.157.500,00
5 Pas. Wastafel meja lkp. Assesories + kran ex. Toto ( 1 bh ) unit 9,00 Rp 2.000.000,00 Rp 18.000.000,00
6 Pas. Wastafel meja lkp. Assesories + kran ex. Toto ( 2 bh ) unit 2,00 Rp 1.900.000,00 Rp 3.800.000,00
7 Pas. Cermin (Rk. Kayu 4/6 + multipleks 9 mm + cermin tbl. 8 unit 10,00 Rp 1.218.800,00 Rp 12.188.000,00
8 Pas. Towel ring stainless Steel ex. Toto unit 1,00 Rp 1.031.300,00 Rp 1.031.300,00
9 Pas. Urinoir ex. Toto unit 3,00 Rp 2.156.300,00 Rp 6.468.900,00
10 Pas. Sekat urinoir ex Toto unit 2,00 Rp 1.062.500,00 Rp 2.125.000,00
10 Pas. Locker unit 21,00 Rp 812.500,00 Rp 17.062.500,00
11 Pas. Cubical partisi unit 10,00 Rp 1.406.300,00 Rp 14.063.000,00
12 Pas. Cubical partisi room spa unit 5,00 Rp 1.406.300,00 Rp 7.031.500,00
13 Pas. Shower set unit 5,00 Rp 2.812.500,00 Rp 14.062.500,00

IV 3RD FLOOR Rp 79.072.700,00


1 Pas. Closet duduk monoblok lkp. Assesories ex. Toto unit 8,00 Rp 3.562.500,00 Rp 28.500.000,00
2 Pas. Paper holder ex. Toto bh 8,00 Rp 534.900,00 Rp 4.279.200,00
3 Pas. Jet washer ex. Toto bh 8,00 Rp 545.900,00 Rp 4.367.200,00
4 Pas. Floor drain stainless steel ex. Toto bh 10,00 Rp 406.300,00 Rp 4.063.000,00
6 Pas. Wastafel meja lkp. Assesories + kran ex. Toto ( 3 bh ) unit 2,00 Rp 1.900.000,00 Rp 3.800.000,00
7 Pas. Cermin (Rk. Kayu 4/6 + multipleks 9 mm + cermin tbl. 5 unit 2,00 Rp 1.218.800,00 Rp 2.437.600,00
9 Pas. Urinoir ex. Toto unit 6,00 Rp 2.156.300,00 Rp 12.937.800,00
10 Pas. Sekat urinoir ex Toto unit 7,00 Rp 1.062.500,00 Rp 7.437.500,00
11 Pas. Cubical partisi unit 8,00 Rp 1.406.300,00 Rp 11.250.400,00

V 4TH FLOOR Rp 310.617.500,00


1 Pas. Closet duduk monoblok lkp. Assesories ex. Toto unit 25,00 Rp 3.562.500,00 Rp 89.062.500,00
2 Pas. Paper holder ex. Toto bh 25,00 Rp 534.900,00 Rp 13.372.500,00
3 Pas. Jet washer ex. Toto bh 25,00 Rp 545.900,00 Rp 13.647.500,00
4 Pas. Floor drain stainless steel ex. Toto bh 50,00 Rp 406.300,00 Rp 20.315.000,00
5 Pas. Wastafel meja lkp. Assesories + kran ex. Toto ( 1 bh ) unit 25,00 Rp 2.000.000,00 Rp 50.000.000,00
6 Pas. Cermin (Rk. Kayu 4/6 + multipleks 9 mm + cermin tbl. 5 unit 25,00 Rp 1.218.800,00 Rp 30.470.000,00
7 Pas. Clear tempered glass partisi unit 25,00 Rp 937.500,00 Rp 23.437.500,00
8 Pas. Shower set unit 25,00 Rp 2.812.500,00 Rp 70.312.500,00

VI 5TH FLOOR Rp 310.617.500,00


1 Pas. Closet duduk monoblok lkp. Assesories ex. Toto unit 25,00 Rp 3.562.500,00 Rp 89.062.500,00
2 Pas. Paper holder ex. Toto bh 25,00 Rp 534.900,00 Rp 13.372.500,00
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Sanitary
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

3 Pas. Jet washer ex. Toto bh 25,00 Rp 545.900,00 Rp 13.647.500,00


4 Pas. Floor drain stainless steel ex. Toto bh 50,00 Rp 406.300,00 Rp 20.315.000,00
5 Pas. Wastafel meja lkp. Assesories + kran ex. Toto ( 1 bh ) unit 25,00 Rp 2.000.000,00 Rp 50.000.000,00
6 Pas. Cermin (Rk. Kayu 4/6 + multipleks 9 mm + cermin tbl. 5 unit 25,00 Rp 1.218.800,00 Rp 30.470.000,00
7 Pas. Clear tempered glass partisi unit 25,00 Rp 937.500,00 Rp 23.437.500,00
8 Pas. Shower set unit 25,00 Rp 2.812.500,00 Rp 70.312.500,00

VII 6TH FLOOR Rp 305.987.000,00


1 Pas. Closet duduk monoblok lkp. Assesories ex. Toto unit 23,00 Rp 3.562.500,00 Rp 81.937.500,00
2 Pas. Paper holder ex. Toto bh 23,00 Rp 534.900,00 Rp 12.302.700,00
3 Pas. Jet washer ex. Toto bh 23,00 Rp 545.900,00 Rp 12.555.700,00
4 Pas. Floor drain stainless steel ex. Toto bh 47,00 Rp 406.300,00 Rp 19.096.100,00
5 Pas. Wastafel meja lkp. Assesories + kran ex. Toto ( 1 bh ) a unit 1,00 Rp 2.000.000,00 Rp 2.000.000,00
6 Pas. Wastafel meja lkp. Assesories + kran ex. Toto ( 1 bh ) unit 24,00 Rp 2.000.000,00 Rp 48.000.000,00
7 Pas. Cermin (Rk. Kayu 4/6 + multipleks 9 mm + cermin tbl. 5 unit 1,00 Rp 1.218.800,00 Rp 1.218.800,00
mm) a
8 Pas. Cermin (Rk. Kayu 4/6 + multipleks 9 mm + cermin tbl. 5 unit 24,00 Rp 1.218.800,00 Rp 29.251.200,00
9 Pas. Clear tempered glass partisi unit 24,00 Rp 937.500,00 Rp 22.500.000,00
10 Pas. Shower set unit 24,00 Rp 2.812.500,00 Rp 67.500.000,00
11 Pas. Bath tub lkp. Assesories ex. Toto unit 1,00 Rp 9.625.000,00 Rp 9.625.000,00

VIII 7TH FLOOR Rp 305.987.000,00


1 Pas. Closet duduk monoblok lkp. Assesories ex. Toto unit 23,00 Rp 3.562.500,00 Rp 81.937.500,00
2 Pas. Paper holder ex. Toto bh 23,00 Rp 534.900,00 Rp 12.302.700,00
3 Pas. Jet washer ex. Toto bh 23,00 Rp 545.900,00 Rp 12.555.700,00
4 Pas. Floor drain stainless steel ex. Toto bh 47,00 Rp 406.300,00 Rp 19.096.100,00
5 Pas. Wastafel meja lkp. Assesories + kran ex. Toto ( 1 bh ) a unit 1,00 Rp 2.000.000,00 Rp 2.000.000,00
5 Pas. Wastafel meja lkp. Assesories + kran ex. Toto ( 1 bh ) unit 24,00 Rp 2.000.000,00 Rp 48.000.000,00
6 Pas. Cermin (Rk. Kayu 4/6 + multipleks 9 mm + cermin tbl. 5 unit 1,00 Rp 1.218.800,00 Rp 1.218.800,00
mm) a
6 Pas. Cermin (Rk. Kayu 4/6 + multipleks 9 mm + cermin tbl. 5 unit 24,00 Rp 1.218.800,00 Rp 29.251.200,00
7 Pas. Clear tempered glass partisi unit 24,00 Rp 937.500,00 Rp 22.500.000,00
8 Pas. Shower set unit 24,00 Rp 2.812.500,00 Rp 67.500.000,00
9 Pas. Bath tub lkp. Assesories ex. Toto unit 1,00 Rp 9.625.000,00 Rp 9.625.000,00

IX 8TH FLOOR Rp 305.987.000,00


1 Pas. Closet duduk monoblok lkp. Assesories ex. Toto unit 23,00 Rp 3.562.500,00 Rp 81.937.500,00
2 Pas. Paper holder ex. Toto bh 23,00 Rp 534.900,00 Rp 12.302.700,00
3 Pas. Jet washer ex. Toto bh 23,00 Rp 545.900,00 Rp 12.555.700,00
4 Pas. Floor drain stainless steel ex. Toto bh 47,00 Rp 406.300,00 Rp 19.096.100,00
5 Pas. Wastafel meja lkp. Assesories + kran ex. Toto ( 1 bh ) a unit 1,00 Rp 2.000.000,00 Rp 2.000.000,00
5 Pas. Wastafel meja lkp. Assesories + kran ex. Toto ( 1 bh ) unit 24,00 Rp 2.000.000,00 Rp 48.000.000,00
6 Pas. Cermin (Rk. Kayu 4/6 + multipleks 9 mm + cermin tbl. 5 unit 1,00 Rp 1.218.800,00 Rp 1.218.800,00
mm) a
6 Pas. Cermin (Rk. Kayu 4/6 + multipleks 9 mm + cermin tbl. 5 unit 24,00 Rp 1.218.800,00 Rp 29.251.200,00
7 Pas. Clear tempered glass partisi unit 24,00 Rp 937.500,00 Rp 22.500.000,00
8 Pas. Shower set unit 24,00 Rp 2.812.500,00 Rp 67.500.000,00
9 Pas. Bath tub lkp. Assesories ex. Toto unit 1,00 Rp 9.625.000,00 Rp 9.625.000,00

Jumlah Rp 1.843.322.000,00
BILL OF QUANTITY ( BQ )
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Tangga
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

I. PEKERJAAN TANGGA

I BASEMENT FLOOR Rp 41.584.725,00


1 Pek. Railing + Hand Railing tangga m1 37,99 Rp 862.500,00 Rp 32.766.375,00
2 Pek. Floor finish (06) m2 45,58 Rp 22.500,00 Rp 1.025.550,00
3 Pek. Stepnozing keramik 5x20 cm (05) m' 40,80 Rp 191.000,00 Rp 7.792.800,00

II 1ST FLOOR Rp 85.911.450,00


1 Pek. Railing + Hand Railing tangga m1 75,97 Rp 862.500,00 Rp 65.524.125,00
2 Pek. Floor finish (06) m2 91,17 Rp 22.500,00 Rp 2.051.325,00
3 Pek. Stepnozing keramik 5x20 cm (05) m' 96,00 Rp 191.000,00 Rp 18.336.000,00

III 2ND FLOOR Rp 85.911.450,00


1 Pek. Railing + Hand Railing tangga m1 75,97 Rp 862.500,00 Rp 65.524.125,00
2 Pek. Floor finish (06) m2 91,17 Rp 22.500,00 Rp 2.051.325,00
3 Pek. Stepnozing keramik 5x20 cm (05) m' 96,00 Rp 191.000,00 Rp 18.336.000,00

IV 3RD FLOOR Rp 85.911.450,00


1 Pek. Railing + Hand Railing tangga m1 75,97 Rp 862.500,00 Rp 65.524.125,00
2 Pek. Floor finish (06) m2 91,17 Rp 22.500,00 Rp 2.051.325,00
3 Pek. Stepnozing keramik 5x20 cm (05) m' 96,00 Rp 191.000,00 Rp 18.336.000,00

V 4TH FLOOR Rp 79.035.450,00


1 Pek. Railing + Hand Railing tangga m1 75,97 Rp 862.500,00 Rp 65.524.125,00
2 Pek. Floor finish (06) m2 91,17 Rp 22.500,00 Rp 2.051.325,00
3 Pek. Stepnozing keramik 5x20 cm (05) m' 60,00 Rp 191.000,00 Rp 11.460.000,00

VI 5TH FLOOR Rp 79.035.450,00


1 Pek. Railing + Hand Railing tangga m1 75,97 Rp 862.500,00 Rp 65.524.125,00
2 Pek. Floor finish (06) m2 91,17 Rp 22.500,00 Rp 2.051.325,00
3 Pek. Stepnozing keramik 5x20 cm (05) m' 60,00 Rp 191.000,00 Rp 11.460.000,00

VII 6TH FLOOR Rp 79.035.450,00


1 Pek. Railing + Hand Railing tangga m1 75,97 Rp 862.500,00 Rp 65.524.125,00
2 Pek. Floor finish (06) m2 91,17 Rp 22.500,00 Rp 2.051.325,00
3 Pek. Stepnozing keramik 5x20 cm (05) m' 60,00 Rp 191.000,00 Rp 11.460.000,00

VIII 7TH FLOOR Rp 79.035.450,00


1 Pek. Railing + Hand Railing tangga m1 75,97 Rp 862.500,00 Rp 65.524.125,00
4 Pek. Floor finish (06) m2 91,17 Rp 22.500,00 Rp 2.051.325,00
5 Pek. Stepnozing keramik 5x20 cm (05) m' 60,00 Rp 191.000,00 Rp 11.460.000,00

IX 8TH FLOOR Rp 79.035.450,00


1 Pek. Railing + Hand Railing tangga m1 75,97 Rp 862.500,00 Rp 65.524.125,00
2 Pek. Floor finish (06) m2 91,17 Rp 22.500,00 Rp 2.051.325,00
3 Pek. Stepnozing keramik 5x20 cm (05) m' 60,00 Rp 191.000,00 Rp 11.460.000,00

XII ROOF FLOOR Rp 21.475.650,00


1 Pek. Railing + Hand Railing tangga m1 18,99 Rp 862.500,00 Rp 16.378.875,00
2 Pek. Floor finish (06) m2 22,79 Rp 22.500,00 Rp 512.775,00
3 Pek. Stepnozing keramik 5x20 cm (05) m' 24,00 Rp 191.000,00 Rp 4.584.000,00

Jumlah Rp 715.971.975,00
BILL OF QUANTITY ( BQ )
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Kanopi
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

I. PEKERJAN KANOPI DAN TAMPAK (EKSTERIOR)

1 Pek. Groove plester aci fin cat weathershield (I) ls 1,00 Rp 181.300,00 Rp 181.300,00
2 Pek. Marmer ex. Kota Marmer lot 1,00 Rp Rp -
2 Pek. Lettering Sign Board stainless steel plate + indirect lamp (D) unit 1,00 Rp 8.562.500,00 Rp 8.562.500,00
3 Pek. Lettering Sign Board acrylic 8mm custom+ indirect lamp (D) unit 1,00 Rp 9.500.000,00 Rp 9.500.000,00
4 Pek. Dinding beton fin cat weathershield (J) m2 150,87 Rp 181.300,00 Rp 27.352.731,00
5 Pek. Pas. Alumunium Clading Panel+frame alumunium (K) m2 196,24 Rp 458.100,00 Rp 89.897.544,00
6 Pek. Box pintu rel stainless steel palte custom (N) unit 1,00 Rp 3.000.000,00 Rp 3.000.000,00
7 Pek. Pas. Batu paras jogja (B) m2 110,09 Rp 156.300,00 Rp 17.207.067,00
7 Pek. Function Hall roof m2 288,09 Rp 172.500,00 Rp 49.695.525,00
8 Pek. Canopy Drop Off > Penutup atap kaca 12 mm m2 122,92 Rp 1.125.000,00 Rp 138.285.000,00
9 Pek. Pas. Railling besi fin cat duco m2 31,50 Rp 862.500,00 Rp 27.168.750,00
10 Pek. Pas. Grill Alumunium m2 105,97 Rp 343.800,00 Rp 36.432.486,00
11 Pek. Pas. Lampu dinding unit 44,00 Rp 206.300,00 Rp 9.077.200,00

Jumlah Rp 416.360.103,00
BILL OF QUANTITY ( BQ )
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Mekanikal & Elektrikal
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

III. PEKERJAN MEKANIKAL & ELEKTRIKAL

A. PEKERJAAN KONSTRUKSI FISIK


Penawaran pekerjaan termasuk pengadaan dan pemasangan
material di-site, lengkap dan berfungsi dengan baik.
Catatan :
- Bill of Quantity ini hanya merupakan Guidence . Pemborong
harus melakukan pemeriksaan dan membuat perhitungan
kembali perihal besaran listrik, komponen, proteksi, dll.
- Penawaran termasuk upah kerja, peralatan pendukung, P3K,
dan bertanggung jawab terhadap keselamatan kerja
karyawannya pada proyek ini.
- Harga Penawaran termasuk Asuransi All Risk yang akan
dilakukan oleh Pemborong pekerjaan ini.
- Harga Penawaran telah diperhitungkan terhadap adanya
kemungkinan biaya proses perijinan selama dan sampai
selesainya pekerjaan ini.
- Harga Penawaran termasuk resiko pekerjaan yang dilaksa-
nakan (Lumpsum Price) ; kemungkinan adanya tambahan biaya
karena pekerjaan lapangan, sudah diperhitungkan dan termasuk
dalam penawaran Pemborong.
- Pemborong telah dianggap mengerti dan memahami serta
mematuhi seluruh peraturan yang berlaku dilingkungan proyek.
PEKERJAAN PERSIAPAN
- Mobilisasi dan Demobilisasi
- Pembuatan Shop drawings dan As built drawings
- Pembuatan Direksi Keet dan gudang kerja
- Air kerja dan listrik kerja
- Peralatan P3K dan Asuransi tenaga kerja (All Risk), dll
PEKERJAAN SITE, UTILITAS ME PERALATAN LISTRIK GENSET
& EQUIPMENT
Pekerjaan termasuk pengadaan dan pemasangan material di site
lengkap dengan accessories, terminasi, grounding, dll
I. PEKERJAAN PERISAPAN Rp 1.029.882.000,00

- Mobilisasi dan Demobilisasi Ls 1,00 Rp 791.000.000,00 Rp 791.000.000,00


- Pembuatan Shop Drawing dan As Built Drawing Ls 1,00 Rp 15.820.000,00 Rp 15.820.000,00
- Pembuatan Direksi Keet dan Gudang Kerja M² 120,00 Rp 1.265.600,00 Rp 151.872.000,00
- Air Kerja dan Listrik Kerja Ls 1,00 Rp 47.460.000,00 Rp 47.460.000,00
- Peralatan P3K dan Asuransi Tenaga Kerja (All Risk), dll, Ls 1,00 Rp 23.730.000,00 Rp 23.730.000,00

I.1 PEKERJAAN SITE, UTILITAS ME

I.2 PERALATAN LISTRIK GENSET & EQUIPMENT Rp 4.317.910.800,00


Pekerjaan termasuk pengadaan dan pemasangan material di site
lengkap dengan accessories, terminasi, grounding, dll.
a. Stand by Genset 850 kVA, 20 kV - 380 V Unit 1,00 Rp 2.784.320.000,00 Rp 2.784.320.000,00
b. Transformator Oil Type 1000 kVA, 20 kV - 380 V Unit 1,00 Rp 506.240.000,00 Rp 506.240.000,00
c. Medium Voltage Distribusu Panel (MVMDP - 20 kV) Hotel Unit 1,00 Rp 332.220.000,00 Rp 332.220.000,00
d. Panel Distribusi Tegangan Rendah (TR) Unit 1,00 Rp 503.708.800,00 Rp 503.708.800,00
e. Pentanahan Netral pada Ruang Panel Utama, dll Lot 1,00 Rp 13.763.400,00 Rp 13.763.400,00
f. Pekerjaan sistem Penangkal Petir Lot 1,00 Rp 177.658.600,00 Rp 177.658.600,00
Rp - Rp -
II.2 PEKERJAAN PLUMBING (AIR BERSIH, BUANGAN & AIR Rp 3.859.542.100,00
KOTOR)

II.2.1 PERALATAN UTAMA Rp 2.632.542.900,00


- Pompa Deliveri, Kap. 250 L/mnt, H=50M (Centrifugal end Unit 2,00 Rp 138.899.600,00 Rp 277.799.200,00
- Packaged Booster Pump, Kap. 150 L/M, Head 30 M Set 1,00 Rp 92.863.400,00 Rp 92.863.400,00
- Sump Pump, Kap. 100 L/mnt, H=15 M (drain) Unit 9,00 Rp 68.817.000,00 Rp 619.353.000,00
- Pompa Penguras, Kap 150 L/mnt, H=30 M (Horizontal Suction Unit 1,00 Rp 91.439.600,00 Rp 91.439.600,00
single)
- Top Reservoir, Kap. 30 m3 Fibreglass Unit 1,00 Rp 196.959.000,00 Rp 196.959.000,00
-Sewage Teratment Plant (STP), Extended aerasi, Kap. 100 m3 Unit 1,00 Rp 633.369.500,00 Rp 633.369.500,00
- Pemipaan, header, valve, strainer, scheck valve, dll Ls 1,00 Rp 522.060.000,00 Rp 522.060.000,00
- Panel Pompa, Kabel Distribusi dll Ls 1,00 Rp 198.699.200,00 Rp 198.699.200,00
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Mekanikal & Elektrikal
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

II.2.2 PEMIPAAN UTAMA Rp 1.226.999.200,00


Pipa Utama
a. Pipa Air Bersih Galvanized Iron Pipe lengkap peralatan bantu dan Ls 1,00 Rp 996.660.000,00 Rp 996.660.000,00
aksesories
b. Pipa Air Kotor uPVC lengkap peralatan bantu dan accessories Ls 1,00 Rp 230.339.200,00 Rp 230.339.200,00

II.3 PEKERJAAN DEEP WELL (1 unit) Rp 743.540.000,00


- Pekerjaan Deep Well Kapasitas 150 L/Menit, termasuk Unit 2,00 Rp 371.770.000,00 Rp 743.540.000,00
pekerjaan boring pipe, panel valve, kabel kontrol dll

II.4 PEKERJAAN FIRE FIGHTING ( HYDRANT & SPRINKLER ) Rp 3.167.353.800,00

II.4.1 PERALATAN UTAMA Rp 1.307.997.600,00


.- Electric Fire Hydrant Pump Kap.750 Usgpm, H=80 M' Unit 1,00 Rp 423.659.600,00 Rp 423.659.600,00
.- Automatic Diesel Pump Kap.750 Usgpm, H=150 M' Unit 1,00 Rp 689.119.200,00 Rp 689.119.200,00
.- Jockey Fire Hydrant Pump Kap. 25 Usgpm, H=160 M' Unit 1,00 Rp 195.218.800,00 Rp 195.218.800,00

II.4.2 PEMIPAAN, FITTINGS DAN VALVE, DLL Rp 1.859.356.200,00


a. Pemipaan di-ruang Pompa, dll Ls 1,00 Rp 513.359.000,00 Rp 513.359.000,00
Pipa menggunakan Black Steel Pipe (BSP), SCh.40
lengkap elbow, reducer, T-Way, dll
b. Pemipaan dari ruang Pompa dan ke Site, dll Ls 1,00 Rp 1.003.779.000,00 Rp 1.003.779.000,00
Pipa menggunakan Black Steel Pipe (BSP), SCh.40
standard BS.1387/67 lengkap elbow, reducer, T-Way, dll
c. Peralatan Fire Fighting (site)
- Hydrant Pillar (HP), Two ways type Unit 2,00 Rp 7.213.900,00 Rp 14.427.800,00
- Hose Rell Cabinet (HRC) type C Unit 2,00 Rp 6.802.600,00 Rp 13.605.200,00
- Seamesse Connection (SC) Unit 2,00 Rp 2.056.600,00 Rp 4.113.200,00
- Pekerjaan galian & pengurugan tanah u/pipa Ls 1,00 Rp 37.018.800,00 Rp 37.018.800,00
d. Peralatan bantu Pompa
- Strainer diameter 150mm Buah 2,00 Rp 7.277.200,00 Rp 14.554.400,00
- Fleksible Connection diameter 150mm Buah 4,00 Rp 1.977.500,00 Rp 7.910.000,00
- Check Valve diameter 150mm Buah 2,00 Rp 5.537.000,00 Rp 11.074.000,00
- Gate Valve diameter 150mm Buah 4,00 Rp 22.939.000,00 Rp 91.756.000,00
- Foot Valve diameter 150mm Buah 2,00 Rp 13.763.400,00 Rp 27.526.800,00
- Water Level Control Buah 2,00 Rp 10.283.000,00 Rp 20.566.000,00
- Pressure Gauge Buah 4,00 Rp 791.000,00 Rp 3.164.000,00
- Pressure Switch Buah 4,00 Rp 7.356.300,00 Rp 29.425.200,00
- Reducer 150x100mm Buah 4,00 Rp 3.638.600,00 Rp 14.554.400,00
- Strainer diameter 65mm Buah 1,00 Rp 5.537.000,00 Rp 5.537.000,00
- Fleksible Connection diameter 65mm Buah 2,00 Rp 1.977.500,00 Rp 3.955.000,00
- Check Valve diameter 65mm Buah 1,00 Rp 3.638.600,00 Rp 3.638.600,00
- Gate Valve diameter 65mm Buah 2,00 Rp 5.695.200,00 Rp 11.390.400,00
- Foot Valve diameter 65mm Buah 1,00 Rp 4.271.400,00 Rp 4.271.400,00
e. Testing and commissioning Ls 1,00 Rp 23.730.000,00 Rp 23.730.000,00

Jumlah Rp 13.118.228.700,00
BILL OF QUANTITY ( BQ )
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Mekanikal & Elektrikal - Gedung A dan Gedung B (Typical)
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

PEKERJAN MEKANIKAL & ELEKTRIKAL


Penawaran pekerjaan termasuk pengadaan dan pemasangan material di
site, lengkap dan berfungsi dengan baik

III.1 PEKERJAAN INSTALASI PENERANGAN DAN FIXTURES Rp 5.929.916.115,00

III.1.1 BASEMENT FLOOR Rp 551.879.160,00


a. Pekerjaan Panel lengkap peralatan proteksi, komponen panel,
Busbar, terminasi, grounding system dan accessories, dll.
SDP-01
Unit 1,00 Rp 16.539.810,00 Rp 16.539.810,00
- PP - Pompa Air Besih Unit 1,00 Rp 29.986.810,00 Rp 29.986.810,00
- PP - Fire Pump Unit 1,00 Rp 46.392.150,00 Rp 46.392.150,00
- PP - SP-1 S/D 5 ( PANEL SUM PUM PIT ) Unit 1,00 Rp 16.539.810,00 Rp 16.539.810,00
- PP - Laundry Unit 7,00 Rp 19.632.620,00 Rp 137.428.340,00
- PP - Workshop Unit 1,00 Rp 23.935.660,00 Rp 23.935.660,00
- PP - Engineering Control Room Unit 1,00 Rp 7.732.025,00 Rp 7.732.025,00
- PP- STP Unit 1,00 Rp 8.505.270,00 Rp 8.505.270,00
b. Pekerjaan Kabel Feeder Unit 1,00 Rp 7.732.025,00 Rp 7.732.025,00
KABEL FEEDER PHBU-BASEMENT FLOOR -
- NYY - 4 x 35 mm2 Dari SDP- 01- BS Ke.PP-AIR BERSIH M' 50,00 Rp 370.855,00 Rp 18.542.750,00
- NYY - 4 x 6 mm2 Dari SDP - 01- KE PP-LP-01 M' 10,00 Rp 91.460,00 Rp 914.600,00
- NYY - 4 x 16mm2 Dari SDP - 01 - BS Ke.PP-LAUNDRY M' 35,00 Rp 166.770,00 Rp 5.836.950,00
- NYY - 4 x 16mm2 Dari SDP - 01 - BS Ke.PP-WORKSHOP M' 50,00 Rp 166.770,00 Rp 8.338.500,00
- NYY - 4 x 6mm2 Dari SDP - 01 BS ke Ke PP-ENG KTR ROOM M' 50,00 Rp 91.460,00 Rp 4.573.000,00
- NYY - 4 x 6mm2 Dari SDP - 01 - BS Ke PP-STP M' 52,00 Rp 91.460,00 Rp 4.755.920,00
- NYY - 4 x 4 mm2 Dari PP - 01- Exhaust fan parkir M' 60,00 Rp 71.825,00 Rp 4.309.500,00
- NYM - 3 x 2,5 mm2 Dari PP - 01- KE Indoor AC M' 30,00 Rp 35.615,00 Rp 1.068.450,00
c. Pekerjaan Grounding Panel -
- Kabel BC 10 mm M' 85,00 Rp 32.980,00 Rp 2.803.300,00
- Kabel BC 70 mm M' 60,00 Rp 185.555,00 Rp 11.133.300,00
d Pekerjaan instalasi Penerangan dan Stop Kontak lengkap -
kabel NYA 2 x 1,5 mm2, konduit, T-does, dan accessories. -
- Instalasi Penerangan Titik 150,00 Rp 344.250,00 Rp 51.637.500,00
- Instalasi Stop Kontak dinding 1 Ph, 10 A Titik 51,00 Rp 416.840,00 Rp 21.258.840,00
- Instalasi Stop Kontak EF 1 Ph, 16 A Titik 3,00 Rp 416.840,00 Rp 1.250.520,00
e. Pengadaan dan pemasangan Fixtures dan Armatures -
Lampu TL 1 x 36 Watt / V-Shape -
Lampu Tangga TL 1 x 36 Watt, GMS (with Battery Unit) Buah 50,00 Rp 430.270,00 Rp 21.513.500,00
Lampu Exit 2 x TLD 8 Watt ( With Battery Unit ) Buah 4,00 Rp 3.092.810,00 Rp 12.371.240,00
Lampu Fitting E.27 PL-C 18 Watt/220V Buah 2,00 Rp 232.645,00 Rp 465.290,00
Lampu Fitting E.27 PL-C 13 Watt/220V C/W Glass cover ( lp toilet ) Buah 3,00 Rp 329.460,00 Rp 988.380,00
Lampu ramp parkir Wall Mounted type Hallogen 50w 220V Buah 1,00 Rp 232.645,00 Rp 232.645,00
Stop Kontak 1 Ph, 10 A Buah 6,00 Rp 232.645,00 Rp 1.395.870,00
Stop Kontak EF 1 Ph, 16 A Buah 51,00 Rp 247.435,00 Rp 12.619.185,00
Saklar Tunggal Buah 7,00 Rp 247.435,00 Rp 1.732.045,00
Saklar Serie Buah 15,00 Rp 247.435,00 Rp 3.711.525,00
f. Pekerjaan kabel tray -
kabel tray 800 mm x 100 mm M' 28,00 Rp 437.070,00 Rp 12.237.960,00
kabel tray 400 mm x 100 mm M' 55,00 Rp 357.425,00 Rp 19.658.375,00
kabel tray 200 mm x 100 mm M' 22,00 Rp 309.825,00 Rp 6.816.150,00
elbow 800 mm Buah 3,00 Rp 437.070,00 Rp 1.311.210,00
elbow 400 mm Buah 8,00 Rp 357.425,00 Rp 2.859.400,00
reducer 800 mm x 400 mm Buah 1,00 Rp 437.070,00 Rp 437.070,00
g. Pkerjaan kabel leader -
kabel leader 800 mm x 100 mm M' 5,00 Rp 437.070,00 Rp 2.185.350,00
kabel leader 600 mm x 100 mm M' 5,00 Rp 360.400,00 Rp 1.802.000,00
kabel leader 400 mm x 100 mm M' 5,00 Rp 357.425,00 Rp 1.787.125,00
h. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 16.539.810,00 Rp 16.539.810,00

III.1.2 1ST FLOOR Rp 1.591.194.390,00


a. Pekerjaan Panel lengkap peralatan proteksi, komponen panel,
Busbar, terminasi, grounding system dan accessories, dll.
- Low Voltage Main Distribution Panel (LVMDP ) Unit 1,00 Rp 419.949.810,00 Rp 419.949.810,00
- Capacitor bank Unit 1,00 Rp 15.060.640,00 Rp 15.060.640,00
- PHBU-TR Unit 1,00 Rp 44.912.980,00 Rp 44.912.980,00
- PHBU-GF Unit 1,00 Rp 38.592.890,00 Rp 38.592.890,00
- SDP - 03 Unit 1,00 Rp 44.912.980,00 Rp 44.912.980,00
- PP - LP-01 Unit 1,00 Rp 16.539.810,00 Rp 16.539.810,00
- PP - LP-02 Unit 1,00 Rp 16.539.810,00 Rp 16.539.810,00
- PP - LP-3 KITCHEN Unit 1,00 Rp 46.392.150,00 Rp 46.392.150,00
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Mekanikal & Elektrikal - Gedung A dan Gedung B (Typical)
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

- PP - LP-4 PH ( POWER HOUSE ROOM ) Unit 1,00 Rp 28.776.580,00 Rp 28.776.580,00


b. Pekerjaan Kabel Feeder -
dari PHBU-TR - KE PHB GROUND FLOOR -
- NYY - 4 x 1C x 300mm2 Dari LVMDV KE SDP-2 - GF M' 25,00 Rp 11.349.540,00 Rp 283.738.500,00
- FRC - 4 x 1c x 95mm2 Dari LVMDP GF KE-PP FIRE PUMP M' 65,00 Rp 1.546.405,00 Rp 100.516.325,00
- NYY - 4 x 240 mm2 Dari SDP-2 - GF ke SDP-1 BSF M' 50,00 Rp 2.516.765,00 Rp 125.838.250,00
- NYY - 4 x 50mm2 Dari SDP-02 GF Ke SDP-03 MGF M' 25,00 Rp 538.390,00 Rp 13.459.750,00
- NYY - 4 x 6 mm2 Dari SDP-02 GF Ke PP-LP-01 GF M' 10,00 Rp 91.460,00 Rp 914.600,00
- NYY - 4 x 25mm2 Dari SDP-02 GF Ke PP-LP-02 GF AC & EF M' 15,00 Rp 287.215,00 Rp 4.308.225,00
- NYY - 4 x 95mm2 Dari SDP-02 GF Ke PP-LP-03 GF AC & EF Kitchen M' 15,00 Rp 1.546.405,00 Rp 23.196.075,00
- FRC - 4 x 4 mm2 Dari LVMDP GF Ke-PP - 04 PH M' 30,00 Rp 208.590,00 Rp 6.257.700,00
e. Pekerjaan Grounding Panel -
- Kabel BC 10 mm M' 40,00 Rp 32.980,00 Rp 1.319.200,00
- Kabel BC 70 mm M' 50,00 Rp 185.555,00 Rp 9.277.750,00
a. Pekerjaan Kabel Feeder -
c. Pekerjaan Leader lak & lal ( electrical & electronic ) -
-Size 800 mm x 100 mm M' 10,00 Rp 437.070,00 Rp 4.370.700,00
-Size 600 mm x 100 mm M' 10,00 Rp 360.400,00 Rp 3.604.000,00
d. Pkerjaan kabel tray -
-Size 200 mm x 100 mm M' 22,00 Rp 252.705,00 Rp 5.559.510,00
-Size 300 mm x 100 mm M' 22,00 Rp 299.880,00 Rp 6.597.360,00
-Size 400 mm x 100 mm M' 4,00 Rp 357.425,00 Rp 1.429.700,00
e. Pekerjaan Grounding Panel -
- Kabel BC 10 mm M' 85,00 Rp 32.980,00 Rp 2.803.300,00
- Kabel BC 70 mm M' 3,00 Rp 185.555,00 Rp 556.665,00
f. Pekerjaan instalasi Penerangan dan Stop Kontak lengkap -
kabel NYA 2 x 1,5 mm2, konduit, T-does, dan accessories. -
- Instalasi Penerangan Titik 216,00 Rp 344.250,00 Rp 74.358.000,00
- Instalasi Stop Kontak dinding 1 Ph, 10 A Titik 110,00 Rp 416.840,00 Rp 45.852.400,00
- Instalasi Penerangan Luar Titik 52,00 Rp 685.780,00 Rp 35.660.560,00
g. Pengadaan dan pemasangan Fixtures dan Armatures -
Lampu TL 2 x 18 Watt / V-Shape Buah 4,00 Rp 430.270,00 Rp 1.721.080,00
Lampu Tangga TL 1 x 18 Watt, GMS (with Battery Unit) Buah 8,00 Rp 1.654.015,00 Rp 13.232.120,00
Lampu Exit 2 x TLD 8 Watt ( With Battery Unit ) Buah 2,00 Rp 3.092.810,00 Rp 6.185.620,00
Lampu Fitting E.27 PL-C 13 Watt/220V Buah 243,00 Rp 232.645,00 Rp 56.532.735,00
Recessed mounted Downlight PL-C-4P-18 W ( c/w Bateray ) Buah 4,00 Rp 1.196.800,00 Rp 4.787.200,00
Surface mounted fluorecen light 2 x TL.D.18/54/220 " V-Shave Buah 8,00 Rp 388.620,00 Rp 3.108.960,00
Surface mounted fluorecen light 1 x TL.D.36/84/220 " V-Shave Buah 48,00 Rp 285.515,00 Rp 13.704.720,00
Lampu Taman HPL-N 50 Watt, c/w tiang t-2,5 meter, pondasi Buah 2,00 Rp 1.680.875,00 Rp 3.361.750,00
Stop Kontak 1 Ph, 10 A Buah 110,00 Rp 247.435,00 Rp 27.217.850,00
Saklar Tunggal Buah 75,00 Rp 247.435,00 Rp 18.557.625,00
Saklar Serie Buah 20,00 Rp 247.435,00 Rp 4.948.700,00
h. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 16.539.810,00 Rp 16.539.810,00

III.1.3 2ND FLOOR Rp 315.752.730,00


a. Pekerjaan Panel lengkap peralatan proteksi, komponen panel,
Busbar, terminasi, grounding system dan accessories, dll.
- Sub Distribution Panel (SDP- 03 MGF ) Unit 1,00 Rp 86.060.800,00 Rp 86.060.800,00
- PP - LP-01 AC & EF ( ORRIDOR & LIFT LOBBY ) Unit 1,00 Rp 16.539.810,00 Rp 16.539.810,00
- PP - LP-02 AC & EF ( DISCOTIQ ) Unit 1,00 Rp 16.539.810,00 Rp 16.539.810,00
- PP - LP-03 AC & EF ( CORRIDOR & GYM ) Unit 1,00 Rp 11.698.890,00 Rp 11.698.890,00
- PP - LP-04 AC & EF. BOH ( BACK OF THE HOUSE ) Unit 1,00 Rp 8.740.550,00 Rp 8.740.550,00
b. Pekerjaan Kabel Feeder -
dari PHBU-TR - KE PHB GROUND FLOOR -
- NYY - 4 x 6mm2 Dari SDP- 03 Ke LP - 01 M' 10,00 Rp 91.460,00 Rp 914.600,00
- NYY - 4 x 10mm Dari SDP- 03 Ke LP - 02 M' 15,00 Rp 147.220,00 Rp 2.208.300,00
- NYY - 4 x 10mm Dari SDP -03 ke LP - 03 M' 30,00 Rp 147.220,00 Rp 4.416.600,00
- NYY - 4 x 10mm Dari SDP -03 ke LP - 04 M' 30,00 Rp 147.220,00 Rp 4.416.600,00
d. Pekerjaan Grounding Panel -
- Kabel BC 10 mm M' 15,00 Rp 32.980,00 Rp 494.700,00
- Kabel BC 70 mm M' 15,00 Rp 185.555,00 Rp 2.783.325,00
e. Pekerjaan Kabel Feeder -
f. Pekerjaan Leader lak & lal ( electrical & electronic ) -
-Size 800 mm x 100 mm M' 4,00 Rp 437.070,00 Rp 1.748.280,00
-Size 600 mm x 100 mm M' 4,00 Rp 360.400,00 Rp 1.441.600,00
g. Pkerjaan kabel tray -
-Size 200 mm x 100 mm M' 52,00 Rp 252.705,00 Rp 13.140.660,00
-Size 300 mm x 100 mm M' 5,00 Rp 299.880,00 Rp 1.499.400,00
-Size 400 mm x 100 mm M' 4,00 Rp 185.555,00 Rp 742.220,00
h. Pekerjaan Grounding Panel -
- Kabel BC 10 mm M' 15,00 Rp 32.980,00 Rp 494.700,00
- Kabel BC 70 mm M' 15,00 Rp 185.555,00 Rp 2.783.325,00
i. Pekerjaan instalasi Penerangan dan Stop Kontak lengkap -
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Mekanikal & Elektrikal - Gedung A dan Gedung B (Typical)
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

kabel NYA 2 x 1,5 mm2, konduit, T-does, dan accessories. -


- Instalasi Penerangan Titik 80,00 Rp 344.250,00 Rp 27.540.000,00
- Instalasi Stop Kontak dinding 1 Ph, 10 A Titik 50,00 Rp 416.840,00 Rp 20.842.000,00
y. Pengadaan dan pemasangan Fixtures dan Armatures -
Lampu TL 2 x 18 Watt / V-Shape Buah 4,00 Rp 430.270,00 Rp 1.721.080,00
Lampu Tangga TL 1 x 18 Watt, GMS (with Battery Unit) Buah 8,00 Rp 1.654.015,00 Rp 13.232.120,00
Lampu Exit 2 x TLD 8 Watt ( With Battery Unit ) Buah 2,00 Rp 3.092.810,00 Rp 6.185.620,00
Lampu Fitting E.27 PL-C 13 Watt/220V Buah 50,00 Rp 232.645,00 Rp 11.632.250,00
Recessed mounted Downlight PL-C-4P-18 W ( c/w Bateray ) Buah 4,00 Rp 1.196.800,00 Rp 4.787.200,00
Surface mounted fluorecen light 2 x TL.D.18/54/220 " V-Shave Buah 8,00 Rp 388.620,00 Rp 3.108.960,00
Surface mounted fluorecen light 1 x TL.D.36/84/220 " V-Shave Buah 48,00 Rp 285.515,00 Rp 13.704.720,00
Stop Kontak 1 Ph, 10 A Buah 50,00 Rp 247.435,00 Rp 12.371.750,00
Saklar Tunggal Buah 10,00 Rp 247.435,00 Rp 2.474.350,00
Saklar Serie Buah 20,00 Rp 247.435,00 Rp 4.948.700,00
k. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 16.539.810,00 Rp 16.539.810,00

III.1.4 3RD FLOOR Rp 323.935.085,00


a. Pekerjaan Panel lengkap peralatan proteksi, komponen panel,
Busbar, terminasi, grounding system dan accessories, dll.
- Sub Distribution Panel SDP- 04 st FL Unit 1,00 Rp 86.060.800,00 Rp 86.060.800,00
- PP - LP - 01 LIGHTING Unit 1,00 Rp 16.539.810,00 Rp 16.539.810,00
- PP - LP - 02 AC LIGHTING FH ( FUNCTION HALL ) Unit 1,00 Rp 11.698.890,00 Rp 11.698.890,00
- PP - LP - 03 AC & EF Unit 1,00 Rp 8.740.550,00 Rp 8.740.550,00
b. Pekerjaan Kabel Feeder -
dari PHBU-TR - KE PHB GROUND FLOOR -
- NYY - 4 x 240mm2 Dari LVMDV- Ke- SDP-01 1st FL M' 65,00 Rp 2.516.765,00 Rp 163.589.725,00
- NYY - 4 x 4mm Dari SDP - 01- Ke PP- LP- 01 M' 15,00 Rp 71.825,00 Rp 1.077.375,00
- NYY - 4 x 6mm Dari SDP - 01- Ke PP- LP- 02 M' 60,00 Rp 91.460,00 Rp 5.487.600,00
- NYY - 4 x 25mm Dari SDP - 01- Ke PP- LP- 03 M' 10,00 Rp 287.215,00 Rp 2.872.150,00
d. Pekerjaan Grounding Panel -
- Kabel BC 10 mm M' 15,00 Rp 32.980,00 Rp 494.700,00
- Kabel BC 70 mm M' 15,00 Rp 185.555,00 Rp 2.783.325,00
e. Pekerjaan Kabel Feeder -
f. Pekerjaan Leader lak & lal ( electrical & electronic ) -
-Size 800 mm x 100 mm M' 4,00 Rp 437.070,00 Rp 1.748.280,00
-Size 600 mm x 100 mm M' 4,00 Rp 360.400,00 Rp 1.441.600,00
g. Pkerjaan kabel tray -
-Size 200 mm x 100 mm M' 5,00 Rp 252.705,00 Rp 1.263.525,00
-Size 300 mm x 100 mm M' 5,00 Rp 299.880,00 Rp 1.499.400,00
-Size 400 mm x 100 mm M' 4,00 Rp 185.555,00 Rp 742.220,00
h. Pekerjaan Grounding Panel -
i. Pekerjaan instalasi Penerangan dan Stop Kontak lengkap -
kabel NYA 2 x 1,5 mm2, konduit, T-does, dan accessories. -
- Instalasi Penerangan Titik 6,00 Rp 344.250,00 Rp 2.065.500,00
- Instalasi Stop Kontak dinding 1 Ph, 10 A Titik 4,00 Rp 416.840,00 Rp 1.667.360,00
y. Pengadaan dan pemasangan Fixtures dan Armatures -
Lampu TL 2 x 18 Watt / V-Shape Buah 4,00 Rp 430.270,00 Rp 1.721.080,00
Saklar Tunggal Buah 2,00 Rp 247.435,00 Rp 494.870,00
Saklar Serie Buah 1,00 Rp 247.435,00 Rp 247.435,00
k. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 11.698.890,00 Rp 11.698.890,00

III.1.5 4nd FLOOR UP TO 8th FLOOR ( 5 FL ) Rp 2.827.978.135,00


a. Pekerjaan Panel lengkap peralatan proteksi, komponen panel,
Busbar, terminasi, grounding system dan accessories, dll.
b. Pekerjaan Panel unit
- Sub Distribution Panel SDP- 05 CORRIDOR 2 nd FL s/d 6 th FL Unit 1,00 Rp 86.060.800,00 Rp 86.060.800,00
- PP-Kamar 1 S/25 2nd FL s/d 6 th Floor Unit 5,00 Rp 726.155,00 Rp 3.630.775,00
- KEY TAG -Kamar 1 S/25 2nd FL s/d 6 th Floor Unit 125,00 Rp 100.895,00 Rp 12.611.875,00
c. Pekerjaan Kabel Feeder Unit 125,00 Rp 107.610,00 Rp 13.451.250,00
dari SDP- 04 1 st FL ke SDP Corridor 2nd Floor -
- NYY - 4 x 70 M' 10,00 Rp 1.512.830,00 Rp 15.128.300,00
dari LVMDP- GF Ke SDP-06 Corridor 3rd Floor -
- NYY - 4 x 240 M' 70,00 Rp 2.516.765,00 Rp 176.173.550,00
dari SDP- 05 3 rd FL ke SDP-06 Corridor 4th Floor -
- NYY - 4 x 70 M' 10,00 Rp 1.512.830,00 Rp 15.128.300,00
dari LVMDP- GF Ke SDP-08 Corridor 5rd Floor -
- NYY - 4 x 300 M' 70,00 Rp 11.349.285,00 Rp 794.449.950,00
dari SDP- 07 5 th FL ke SDP-9 Corridor 6th Floor -
- NYY - 4 x 120 M' 10,00 Rp 1.506.030,00 Rp 15.060.300,00
dari SDP- 09 6 th FL ke SDP-10 Roof Floor -
- NYY - 4 x 70 M' 10,00 Rp 1.512.830,00 Rp 15.128.300,00
dari SDP-Corridor ke Nym 4x4mm2 ke PP-Kamar 1 s/d 25 M' 1000,00 Rp 71.825,00 Rp 71.825.000,00
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Mekanikal & Elektrikal - Gedung A dan Gedung B (Typical)
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

d. Pekerjaan Leader lak & lal ( electrical & electronic ) -


-Size 800 mm x 100 mm M' 50,00 Rp 437.070,00 Rp 21.853.500,00
-Size 600 mm x 100 mm M' 50,00 Rp 360.400,00 Rp 18.020.000,00
e. Pkerjaan kabel tray -
-Size 200 mm x 100 mm M' 200,00 Rp 252.705,00 Rp 50.541.000,00
-Size 300 mm x 100 mm M' 200,00 Rp 299.880,00 Rp 59.976.000,00
f. Pekerjaan Grounding Panel -
- Kabel BC 6 mm2 Panel Kamar M' 150,00 Rp 19.380,00 Rp 2.907.000,00
- Kabel BC 25 mm2 SDP Corridor M' 15,00 Rp 47.090,00 Rp 706.350,00
g. Pekerjaan instalasi Penerangan dan Stop Kontak lengkap -
-kabel NYA 2 x 1,5 mm2, konduit, T-does, dan accessories. -
'Instalasi Penerangan Kamar 1 s/d 25 x 6 x 5 = 750 + 55 Titik 850,00 Rp 344.250,00 Rp 292.612.500,00
- Instalasi Stop Kontak dinding 1 Ph, 10 A kamar 1 s/d 25 x 8 x 5 Titik 1020,00 Rp 416.840,00 Rp 425.176.800,00
kabel NYA 3 x 2,5 mm2, konduit, T-does, dan accessories. -
h. Pengadaan dan pemasangan Fixtures dan Armatures Kamar 1 s/d 25 -
-Lampu Fitting E.27 PL-C 13 Watt/220V Kamar 1 s/d 25 Buah 625,00 Rp 232.645,00 Rp 145.403.125,00
-Lampu Wastafel TL 1 x 10 Watt c/w glass Cover Toilet 1 s/d 25 Buah 125,00 Rp 360.145,00 Rp 45.018.125,00
-Recessed mounted Downlight PL-C-4P-18 W Toilet c/w Glass Cover 1 Buah 125,00 Rp 388.620,00 Rp 48.577.500,00
-Lampu Tangga TL 1 x 18 Watt, GMS (with Battery Unit) lt.1 s/d 25 Buah 20,00 Rp 1.654.015,00 Rp 33.080.300,00
-Lampu Exit 2 x TLD 8 Watt ( With Battery Unit ) Corridor lt.1 s/d 25 Buah 50,00 Rp 3.092.810,00 Rp 154.640.500,00
-Recessed mounted Downlight PL-C-4P-18 W Corridor lt.1 s/d 25 Buah 60,00 Rp 388.620,00 Rp 23.317.200,00
-Surface mounted fluorecen light1 x TL.D.36/84/220V-Shave lift lobby Buah 60,00 Rp 330.225,00 Rp 19.813.500,00
-Stop Kontak 1 Ph, 10 A Kamar 1 s/d 25 Buah 375,00 Rp 247.435,00 Rp 92.788.125,00
-Stop Kontak Corridor lt.1 s/d 25 Buah 15,00 Rp 247.435,00 Rp 3.711.525,00
-Saklar Tunggal Kamar lt. 1 s/d 25 Buah 250,00 Rp 247.435,00 Rp 61.858.750,00
-Saklar Serie Kamar lt.1 s/d 25 Buah 250,00 Rp 247.435,00 Rp 61.858.750,00
-Saklar Hotel Kamar lt.1 s/d 25 Buah 125,00 Rp 247.435,00 Rp 30.929.375,00
g. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 16.539.810,00 Rp 16.539.810,00

III.1.6 Roof FLOOR Rp 319.176.615,00


a. Pekerjaan Panel lengkap peralatan proteksi, komponen panel,
Busbar, terminasi, grounding system dan accessories, dll.
b. Pekerjaan Panel unit
- PP-Roof Unit 1,00 Rp 11.698.890,00 Rp 11.698.890,00
- PP-Passanger Lift Unit 1,00 Rp 102.197.200,00 Rp 102.197.200,00
- PP-Service Lift Unit 1,00 Rp 102.197.200,00 Rp 102.197.200,00
- PP-BP (BOOSTER PUM) Unit 1,00 Rp 16.539.810,00 Rp 16.539.810,00
c. Pekerjaan kabel tray lift Machine Room -
-Size 200 mm x 50 mm M' 10,00 Rp 252.705,00 Rp 2.527.050,00
d. Pekerjaan Grounding Panel -
- Kabel BC 10 mm2 Panel Roof M' 10,00 Rp 32.980,00 Rp 329.800,00
- Kabel BC 16 mm2 Panel Passanger Lift M' 10,00 Rp 46.410,00 Rp 464.100,00
- Kabel BC 16 mm2 Panel Service Lift M' 10,00 Rp 46.410,00 Rp 464.100,00
e. Pekerjaan instalasi Penerangan dan Stop Kontak lengkap -
-kabel NYA 2 x 1,5 mm2, konduit, T-does, dan accessories. -
-Instalasi Penerangan lift Machine Room Titik 8,00 Rp 344.250,00 Rp 2.754.000,00
-Instalasi Stop Kontak dinding 1 Ph, 10 A kamar 1 s/d 24 Titik 6,00 Rp 416.840,00 Rp 2.501.040,00
-kabel NYA 3 x 2,5 mm2, konduit, T-does, dan accessories. -
f. Pengadaan dan pemasangan Fixtures dan Armatures Kamar 1 s/d 24 -
-Lampu Fitting E.27 PL-C 13 Watt/220V Kamar 1 s/d 24 Buah 168,00 Rp 232.645,00 Rp 39.084.360,00
-Lampu Wastafel TL 1 x 10 Watt c/w glass Cover Toilet 1 s/d 24 Buah 48,00 Rp 360.145,00 Rp 17.286.960,00
-Surface mounted fluorecen light 1 x TL.D.36/84/220 " V-Shave lift Buah 12,00 Rp 330.225,00 Rp 3.962.700,00
-Saklar Tunggal Buah 2,00 Rp 247.435,00 Rp 494.870,00
-Saklar Serie Buah 1,00 Rp 247.435,00 Rp 247.435,00
-Saklar Hotel Buah 24,00 Rp 247.435,00 Rp 5.938.440,00
g. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 10.488.660,00 Rp 10.488.660,00

III.2 PEKERJAAN PENGINDERA API ( FIRE ALARM ) Rp 462.553.935,00

III.2.1 BASEMENT FLOOR Rp 50.258.035,00


a. PERALATAN UTAMA
- Master Control Fire Alarm (MCFA) Kapasitas 2 Loop Unit 1,00 Rp 6.185.620,00 Rp 6.185.620,00
- Back up Battery (Nicad type), dll Ls 1,00 Rp 1.936.385,00 Rp 1.936.385,00
- MDF, Annunciator, Kabel distribusi, dll Ls 1,00 Rp 3.866.055,00 Rp 3.866.055,00
b. Adressible Moudul Box ( AMB ) Unit 1,00 Rp 4.639.215,00 Rp 4.639.215,00
c. Instalasi peralatan lengkap kabel, konduit dan accessories -
- Instalasi Rate of Rise Detector Titik 25,00 Rp 463.930,00 Rp 11.598.250,00
- Instalasi Smoke Detector Titik 13,00 Rp 463.930,00 Rp 6.031.090,00
- Instalasi Fixed Temperature Detector Titik 2,00 Rp 463.930,00 Rp 927.860,00
- Instalasi Alarm Bell Titik 5,00 Rp 463.930,00 Rp 2.319.650,00
- Instalasi Manual Break Glass Push Button Titik 5,00 Rp 463.930,00 Rp 2.319.650,00
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Mekanikal & Elektrikal - Gedung A dan Gedung B (Typical)
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

- Instalasi Indicating Lamp Titik 1,00 Rp 463.930,00 Rp 463.930,00


- Instalasi Flow Switch Titik 1,00 Rp 463.930,00 Rp 463.930,00
d. Fixtures dan armatures -
- Rate of Rise Detector Buah 25,00 Rp 147.900,00 Rp 3.697.500,00
- Smoke Detector Buah 13,00 Rp 123.675,00 Rp 1.607.775,00
- Fixed Temperature Detector Buah 2,00 Rp 155.975,00 Rp 311.950,00
- Alarm Bell Buah 2,00 Rp 231.965,00 Rp 463.930,00
- Manual Break Glass Push Button Buah 2,00 Rp 231.965,00 Rp 463.930,00
- Multi Purpose Dry Chemical Fire Extinguisher 3,5 kg (ABC) Buah 2,00 Rp 231.965,00 Rp 463.930,00
- Mobile Fire Extinguisher Co2 , 23 kg ( R. Genset ) Buah 1,00 Rp 270.640,00 Rp 270.640,00
- Box Fire Extinguisher Buah 2,00 Rp 193.290,00 Rp 386.580,00
- Indicating Lamp Buah 1,00 Rp 146.880,00 Rp 146.880,00
- Instalasi Flow Switch Buah 1,00 Rp 146.880,00 Rp 146.880,00
d. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 1.546.405,00 Rp 1.546.405,00

III.2.2 IST FLOOR Rp 66.563.415,00


a. Adressible Moudul Box ( AMB ) Unit 1,00 Rp 4.639.215,00 Rp 4.639.215,00
b. Instalasi peralatan lengkap kabel, konduit dan accessories -
- Instalasi Rate of Rise Detector Titik 25,00 Rp 1.008.525,00 Rp 25.213.125,00
- Instalasi Smoke Detector Titik 13,00 Rp 1.008.525,00 Rp 13.110.825,00
- Instalasi Fixed Temperature Detector Titik 2,00 Rp 1.008.525,00 Rp 2.017.050,00
- Instalasi Alarm Bell Titik 5,00 Rp 1.008.525,00 Rp 5.042.625,00
- Instalasi Manual Break Glass Push Button Titik 5,00 Rp 1.008.525,00 Rp 5.042.625,00
- Instalasi Indicating Lamp Titik 1,00 Rp 1.008.525,00 Rp 1.008.525,00
- Instalasi Flow Switch Titik 1,00 Rp 1.008.525,00 Rp 1.008.525,00
c. Fixtures dan armatures -
- Rate of Rise Detector Buah 25,00 Rp 146.880,00 Rp 3.672.000,00
- Smoke Detector Buah 13,00 Rp 123.675,00 Rp 1.607.775,00
- Fixed Temperature Detector Buah 2,00 Rp 155.975,00 Rp 311.950,00
- Alarm Bell Buah 2,00 Rp 231.965,00 Rp 463.930,00
- Manual Break Glass Push Button Buah 2,00 Rp 231.965,00 Rp 463.930,00
- Multi Purpose Dry Chemical Fire Extinguisher 3,5 kg (ABC) Buah 2,00 Rp 231.965,00 Rp 463.930,00
- Mobile Fire Extinguisher Co2 , 23 kg ( R. Genset ) Buah 1,00 Rp 270.640,00 Rp 270.640,00
- Box Fire Extinguisher Buah 2,00 Rp 193.290,00 Rp 386.580,00
- Indicating Lamp Buah 1,00 Rp 146.880,00 Rp 146.880,00
- Instalasi Flow Switch Buah 1,00 Rp 146.880,00 Rp 146.880,00
d. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 1.546.405,00 Rp 1.546.405,00

III.2.3 2ND FLOOR Rp 66.563.415,00


a. Adressible Moudul Box ( AMB ) Unit 1,00 Rp 4.639.215,00 Rp 4.639.215,00
b. Instalasi peralatan lengkap kabel, konduit dan accessories -
- Instalasi Rate of Rise Detector Titik 25,00 Rp 1.008.525,00 Rp 25.213.125,00
- Instalasi Smoke Detector Titik 13,00 Rp 1.008.525,00 Rp 13.110.825,00
- Instalasi Fixed Temperature Detector Titik 2,00 Rp 1.008.525,00 Rp 2.017.050,00
- Instalasi Alarm Bell Titik 5,00 Rp 1.008.525,00 Rp 5.042.625,00
- Instalasi Manual Break Glass Push Button Titik 5,00 Rp 1.008.525,00 Rp 5.042.625,00
- Instalasi Indicating Lamp Titik 1,00 Rp 1.008.525,00 Rp 1.008.525,00
- Instalasi Flow Switch Titik 1,00 Rp 1.008.525,00 Rp 1.008.525,00
c. Fixtures dan armatures -
- Rate of Rise Detector Buah 25,00 Rp 146.880,00 Rp 3.672.000,00
- Smoke Detector Buah 13,00 Rp 123.675,00 Rp 1.607.775,00
- Fixed Temperature Detector Buah 2,00 Rp 155.975,00 Rp 311.950,00
- Alarm Bell Buah 2,00 Rp 231.965,00 Rp 463.930,00
- Manual Break Glass Push Button Buah 2,00 Rp 231.965,00 Rp 463.930,00
- Multi Purpose Dry Chemical Fire Extinguisher 3,5 kg (ABC) Buah 2,00 Rp 231.965,00 Rp 463.930,00
- Mobile Fire Extinguisher Co2 , 23 kg ( R. Genset ) Buah 1,00 Rp 270.640,00 Rp 270.640,00
- Box Fire Extinguisher Buah 2,00 Rp 193.290,00 Rp 386.580,00
- Indicating Lamp Buah 1,00 Rp 146.880,00 Rp 146.880,00
- Instalasi Flow Switch Buah 1,00 Rp 146.880,00 Rp 146.880,00
d. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 1.546.405,00 Rp 1.546.405,00

III.2.4 3RD FLOOR Rp 66.563.415,00


a. Adressible Moudul Box ( AMB ) Unit 1,00 Rp 4.639.215,00 Rp 4.639.215,00
b. Instalasi peralatan lengkap kabel, konduit dan accessories -
- Instalasi Rate of Rise Detector Titik 25,00 Rp 1.008.525,00 Rp 25.213.125,00
- Instalasi Smoke Detector Titik 13,00 Rp 1.008.525,00 Rp 13.110.825,00
- Instalasi Fixed Temperature Detector Titik 2,00 Rp 1.008.525,00 Rp 2.017.050,00
- Instalasi Alarm Bell Titik 5,00 Rp 1.008.525,00 Rp 5.042.625,00
- Instalasi Manual Break Glass Push Button Titik 5,00 Rp 1.008.525,00 Rp 5.042.625,00
- Instalasi Indicating Lamp Titik 1,00 Rp 1.008.525,00 Rp 1.008.525,00
- Instalasi Flow Switch Titik 1,00 Rp 1.008.525,00 Rp 1.008.525,00
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Mekanikal & Elektrikal - Gedung A dan Gedung B (Typical)
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

c. Fixtures dan armatures -


- Rate of Rise Detector Buah 25,00 Rp 146.880,00 Rp 3.672.000,00
- Smoke Detector Buah 13,00 Rp 123.675,00 Rp 1.607.775,00
- Fixed Temperature Detector Buah 2,00 Rp 155.975,00 Rp 311.950,00
- Alarm Bell Buah 2,00 Rp 231.965,00 Rp 463.930,00
- Manual Break Glass Push Button Buah 2,00 Rp 231.965,00 Rp 463.930,00
- Multi Purpose Dry Chemical Fire Extinguisher 3,5 kg (ABC) Buah 2,00 Rp 231.965,00 Rp 463.930,00
- Mobile Fire Extinguisher Co2 , 23 kg ( R. Genset ) Buah 1,00 Rp 270.640,00 Rp 270.640,00
- Box Fire Extinguisher Buah 2,00 Rp 193.290,00 Rp 386.580,00
- Indicating Lamp Buah 1,00 Rp 146.880,00 Rp 146.880,00
- Instalasi Flow Switch Buah 1,00 Rp 146.880,00 Rp 146.880,00
d. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 1.546.405,00 Rp 1.546.405,00

III.2.5 4TH FLOOR UP TO 8TH FLOOR ( 5 FL) Rp 212.605.655,00


a. Adressible Moudul Box ( AMB ) Unit 5,00 Rp 4.639.215,00 Rp 23.196.075,00
b. Instalasi peralatan lengkap kabel, konduit dan accessories -
- Instalasi Rate of Rise Detector Kamar Titik 125,00 Rp 1.008.525,00 Rp 126.065.625,00
- Instalasi Smoke Detector Corridor Titik 30,00 Rp 1.008.525,00 Rp 30.255.750,00
- Instalasi Alarm Bell Titik 5,00 Rp 1.008.525,00 Rp 5.042.625,00
- Instalasi Manual Break Glass Push Button Titik 5,00 Rp 1.008.525,00 Rp 5.042.625,00
- Instalasi Indicating Lamp Titik 5,00 Rp 1.008.525,00 Rp 5.042.625,00
- Instalasi Flow Switch Titik 5,00 Rp 1.008.525,00 Rp 5.042.625,00
c. Fixtures dan armatures -
- Smoke Detector Buah 30,00 Rp 123.675,00 Rp 3.710.250,00
- Alarm Bell Buah 5,00 Rp 155.975,00 Rp 779.875,00
- Manual Break Glass Push Button Buah 5,00 Rp 231.965,00 Rp 1.159.825,00
- Multi Purpose Dry Chemical Fire Extinguisher 3,5 kg (ABC) Buah 10,00 Rp 231.965,00 Rp 2.319.650,00
- Box Fire Extinguisher Buah 10,00 Rp 193.290,00 Rp 1.932.900,00
- Indicating Lamp Buah 5,00 Rp 146.880,00 Rp 734.400,00
- Instalasi Flow Switch Buah 5,00 Rp 146.880,00 Rp 734.400,00
d. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 1.546.405,00 Rp 1.546.405,00

III.3 PEKERJAAN TELEPON & DATA Rp 1.402.591.205,00

III.3.1 BASEMENT FLOOR Rp 195.311.130,00


a. - PABX 16/150 Extension + MDF Set 1,00 Rp 38.660.125,00 Rp 38.660.125,00
- Moniter Server,Sistribution Switch Set 1,00 Rp 30.928.100,00 Rp 30.928.100,00
- MDF, Annunciator, Kabel distribusi, dll Ls 1,00 Rp 28.608.535,00 Rp 28.608.535,00
b. Instalasi peralatan lengkap kabel, konduit dan accessories -
- Instalasi Telepon Titik 5,00 Rp 1.936.385,00 Rp 9.681.925,00
- Instalasi Data Titik 3,00 Rp 1.936.385,00 Rp 5.809.155,00
c. TeleponFixtures -
- Outlet Telepon Buah 5,00 Rp 8.269.905,00 Rp 41.349.525,00
- Outlet Data Buah 3,00 Rp 8.269.905,00 Rp 24.809.715,00
d. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 15.464.050,00 Rp 15.464.050,00

III.3.2 1ST FLOOR Rp 163.300.640,00


a. Instalasi peralatan lengkap kabel, konduit dan accessories
- Instalasi Telepon Titik 11,00 Rp 1.936.385,00 Rp 21.300.235,00
- Instalasi Data Titik 5,00 Rp 1.936.385,00 Rp 9.681.925,00
b. TeleponFixtures -
- Outlet Telepon Buah 11,00 Rp 8.269.905,00 Rp 90.968.955,00
- Outlet Data Buah 5,00 Rp 8.269.905,00 Rp 41.349.525,00
d. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 1.546.405,00 Rp 1.546.405,00

III.3.3 2ND FLOOR Rp 83.196.725,00


a. Instalasi peralatan lengkap kabel, konduit dan accessories
- Instalasi Telepon Titik 5,00 Rp 1.936.385,00 Rp 9.681.925,00
- Instalasi Data Titik 3,00 Rp 1.936.385,00 Rp 5.809.155,00
b. TeleponFixtures -
- Outlet Telepon Buah 5,00 Rp 8.269.905,00 Rp 41.349.525,00
- Outlet Data Buah 3,00 Rp 8.269.905,00 Rp 24.809.715,00
c. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 1.546.405,00 Rp 1.546.405,00

III.3.4 3RD FLOOR Rp 68.351.305,00


a. Instalasi peralatan lengkap kabel, konduit dan accessories
- Instalasi Telepon Titik 6,00 Rp 1.936.385,00 Rp 11.618.310,00
- Instalasi Data Titik 6,00 Rp 1.936.385,00 Rp 11.618.310,00
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Mekanikal & Elektrikal - Gedung A dan Gedung B (Typical)
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

b. TeleponFixtures -
- Outlet Telepon Buah 6,00 Rp 3.630.690,00 Rp 21.784.140,00
- Outlet Data Buah 6,00 Rp 3.630.690,00 Rp 21.784.140,00
c. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 1.546.405,00 Rp 1.546.405,00

III.3.5 4TH FLOOR UP TO 8TH Floor ( 5 FL ) Rp 892.431.405,00


a. Instalasi peralatan lengkap kabel, konduit dan accessories
ITC Cable 4x0,6mm2 Kamar 1 s/d 25
- Instalasi Telepon Kamar 1 s/d 25 Titik 250,00 Rp 1.781.770,00 Rp 445.442.500,00
- Outlet Telepon 1 s/d 25 Buah 250,00 Rp 1.781.770,00 Rp 445.442.500,00
b. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 1.546.405,00 Rp 1.546.405,00

III.3 PEKERJAAN MATV Rp 685.109.180,00

III.3.1 1ST FLOOR Rp 174.900.165,00


a Pengadaan dan pemasangan instalasi peralatan MATV Titik 3,00 Rp 3.866.055,00 Rp 11.598.165,00
b Kabel Feeder MATV RG 11/ 7C, 75 ohm m2 30,00 Rp 3.402.125,00 Rp 102.063.750,00
c Kabel Instalasi ke kamar MATV RG 6 / 7C, 75 ohm m2 15,00 Rp 3.402.125,00 Rp 51.031.875,00
d Outlet MATV Buah 3,00 Rp 3.402.125,00 Rp 10.206.375,00

III.3.2 2ND FLOOR Rp 20.259.835,00


a Pengadaan dan pemasangan instalasi peralatan MATV Titik 7,00 Rp 773.245,00 Rp 5.412.715,00
b Kabel Feeder MATV RG 11/ 7C, 75 ohm m2 30,00 Rp 309.315,00 Rp 9.279.450,00
c Kabel Instalasi ke kamar MATV RG 6 / 7C, 75 ohm m2 15,00 Rp 309.315,00 Rp 4.639.725,00
d Outlet MATV Buah 3,00 Rp 309.315,00 Rp 927.945,00

III.3.3 3RD FLOOR Rp 20.259.835,00


a Pengadaan dan pemasangan instalasi peralatan MATV Titik 7,00 Rp 773.245,00 Rp 5.412.715,00
b Kabel Feeder MATV RG 11/ 7C, 75 ohm m2 30,00 Rp 309.315,00 Rp 9.279.450,00
c Kabel Instalasi ke kamar MATV RG 6 / 7C, 75 ohm m2 15,00 Rp 309.315,00 Rp 4.639.725,00
d Outlet MATV Buah 3,00 Rp 309.315,00 Rp 927.945,00

III.3.4 4TH nd s/d 8TH Floor Bedd Room 1 s/d 25 Rp 469.689.345,00


a Pengadaan dan pemasangan instalasi peralatan MATV Titik 125,00 Rp 773.245,00 Rp 96.655.625,00
b Kabel Feeder MATV RG 11/ 7C, 75 ohm m2 200,00 Rp 309.315,00 Rp 61.863.000,00
c Kabel Instalasi ke kamar MATV RG 6 / 7C, 75 ohm m2 1000,00 Rp 309.315,00 Rp 309.315.000,00
d Outlet MATV Buah 1,00 Rp 309.315,00 Rp 309.315,00
e UNP long drat fisher stapping, dll. ls 1,00 Rp 1.546.405,00 Rp 1.546.405,00

III.4 PEKERJAAN CCTV Rp 110.127.870,00

III.4.1 PERALATAN UTAMA CCTV DAN INSTALASI, DLL Rp 41.719.445,00


1.1 16 Channel Digital Video Recording (DVR) Unit 2,00 Rp 8.505.270,00 Rp 17.010.540,00
1.2 20" SVGA Monitor Unit 1,00 Rp 4.639.215,00 Rp 4.639.215,00
1.3 17" Flat Colour Monitor Unit 1,00 Rp 3.866.055,00 Rp 3.866.055,00
1.4 2 Channel Zoom Controller Unit 1,00 Rp 3.092.810,00 Rp 3.092.810,00
1.5 Pengadaan material dan Instalasi peralatan utama Ls 1,00 Rp 5.378.800,00 Rp 5.378.800,00
2 Programming Ls 1,00 Rp 6.185.620,00 Rp 6.185.620,00
b. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 1.546.405,00 Rp 1.546.405,00

III.4.2 PEKERJAAN INSTALASI DAN FIXTURES, DLL Rp 68.408.425,00


2.1 1/3" Colour CCD DSP High Resolution - Camera Unit 1,00 Rp 2.319.650,00 Rp 2.319.650,00
(Type Day/Night Camera, Colour/B/W moveable/pantil) -
2.2 1/3" Colour CCD DSP High Resolution Unit 20,00 Rp 2.554.930,00 Rp 51.098.600,00
(Type Dome Shaped Camera) -
2.3 5,7-34,2 Motorized Zoom Lens Unit 1,00 Rp 1.936.385,00 Rp 1.936.385,00
2.4 Outdoor Housing (Large) Unit 1,00 Rp 1.936.385,00 Rp 1.936.385,00
2.5 Bracket Housing Unit 1,00 Rp 463.930,00 Rp 463.930,00
2.6 Pengadaan material (kabel, conduit, bracket, dll) Titik 21,00 Rp 386.580,00 Rp 8.118.180,00
2.7 Instalasi dan upah pemasangan Titik 21,00 Rp 47.090,00 Rp 988.890,00
b. Alat bantu Hanger & Support -
UNP Long drat Fisher Stapping DLL Ls 1,00 Rp 1.546.405,00 Rp 1.546.405,00

IV.1 PEKERJAAN PLUMBING ( AIR BERSIH,BUANGAN & AIR KOTOR ) Rp 973.850.525,00

IV.1.1 Basement Floor Rp 18.556.860,00


- Pipa Air bersih, Vertikal./Riser,uPVC dia.75mm,dll Ls 1,00 Rp 4.639.215,00 Rp 4.639.215,00
- Pipa Air Kotor, Vertikal./Riser,uPVC dia.100mm,dll Ls 1,00 Rp 4.639.215,00 Rp 4.639.215,00
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Mekanikal & Elektrikal - Gedung A dan Gedung B (Typical)
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

- Pipa Air Buangan, Vertikal./Riser,uPVC dia.100mm,dll Ls 1,00 Rp 4.639.215,00 Rp 4.639.215,00


- Pipa Air Bersih Galvanized Iron Pipe lengkap peralatan bantu dan Ls 1,00 Rp 4.639.215,00 Rp 4.639.215,00

IV.1.2 PEKERJAAN PEMIPAAN, FITTING DAN VALVE, DLL Rp 75.805.550,00


a. Instalasi Air Bersih :
Pipa menggunakan PIPA PVC Class AW
standard JIS.K 6742 lengkap accessories, dll
- Diameter 15mm M' 36,00 Rp 92.820,00 Rp 3.341.520,00
- Diameter 20mm M' 75,00 Rp 100.895,00 Rp 7.567.125,00
- Diameter 25mm M' 9,00 Rp 107.610,00 Rp 968.490,00
- Diameter 32mm M' 25,00 Rp 107.610,00 Rp 2.690.250,00
- Diameter 40mm M' 45,00 Rp 123.675,00 Rp 5.565.375,00
Peralatan bantu pipa, dll -
- Gate Valve diameter 40mm Buah 2,00 Rp 850.510,00 Rp 1.701.020,00
- Faucet (dinding), diameter 15mm Buah 4,00 Rp 3.946.720,00 Rp 15.786.880,00
-Gate Valve diameter 20mm Buah 2,00 Rp 618.545,00 Rp 1.237.090,00
- Peralatan bantu, sambungan, Tee, Elbow, bracket/support, dll Ls 1,00 Rp 1.546.405,00 Rp 1.546.405,00
b. Instalasi Air Kotor dan Air Buangan : -
Pipa menggunakan uPVC type Plain end/Ts End Class VP -
standard JIS.K 6742 lengkap accessories, dll -
- Diameter 100mm M' 24,00 Rp 146.880,00 Rp 3.525.120,00
- Diameter 80mm M' 12,00 Rp 107.610,00 Rp 1.291.320,00
- Diameter 50mm M' 18,00 Rp 92.820,00 Rp 1.670.760,00
- Diameter 40mm M' 18,00 Rp 71.230,00 Rp 1.282.140,00
- Diameter 32mm ( Ventilasi ) M' 42,00 Rp 64.515,00 Rp 2.709.630,00
Peralatan bantu pipa, dll -
- Floor Drain (FD) diameter 50mm Buah 6,00 Rp 107.610,00 Rp 645.660,00
- Clean Out (CO) diameter 100mm Buah 4,00 Rp 115.940,00 Rp 463.760,00
- Peralatan bantu, sambungan, Tee, Elbow, bracket/support, dll Ls 1,00 Rp 309.315,00 Rp 309.315,00
Instalasi Air Hujan, dll : -
- Pipa uPVC dia.150mm M' 125,00 Rp 185.555,00 Rp 23.194.375,00
- Peralatan bantu, sambungan, Tee, Elbow, bracket/support, dll Ls 1,00 Rp 309.315,00 Rp 309.315,00

IV.1.3 1ST FLOOR Rp 215.283.750,00


a. Instalasi Air Bersih :
-Pipa menggunakan PIPA PPR PN - 10
standard JIS.K 6742 lengkap accessories, dll
- Diameter 15mm M' 288,00 Rp 92.820,00 Rp 26.732.160,00
- Diameter 20mm M' 80,00 Rp 100.895,00 Rp 8.071.600,00
- Diameter 25mm M' 3,00 Rp 107.610,00 Rp 322.830,00
- Diameter 32mm M' 3,00 Rp 115.940,00 Rp 347.820,00
- Diameter 40mm M' 3,00 Rp 123.675,00 Rp 371.025,00
Peralatan bantu pipa, dll -
- Gate Valve diameter 40mm Buah 24,00 Rp 850.510,00 Rp 20.412.240,00
- Faucet (dinding), diameter 15mm Buah 24,00 Rp 3.946.720,00 Rp 94.721.280,00
- Water Meter, diameter 20mm Buah 24,00 Rp 618.545,00 Rp 14.845.080,00
- Peralatan bantu, sambungan, Tee, Elbow, bracket/support, dll Ls 1,00 Rp 1.546.405,00 Rp 1.546.405,00
b. Instalasi Air Kotor dan Air Buangan : -
Pipa menggunakan PIPA PVC Class AW -
standard JIS.K 6742 lengkap accessories, dll -
- Diameter 100mm M' 24,00 Rp 146.880,00 Rp 3.525.120,00
- Diameter 80mm M' 3,00 Rp 107.610,00 Rp 322.830,00
- Diameter 50mm M' 156,00 Rp 92.820,00 Rp 14.479.920,00
- Diameter 40mm M' 3,00 Rp 71.230,00 Rp 213.690,00
- Diameter 32mm ( Ventilasi ) M' 3,00 Rp 64.515,00 Rp 193.545,00
Peralatan bantu pipa, dll -
- Floor Drain (FD) diameter 50mm Buah 24,00 Rp 107.610,00 Rp 2.582.640,00
- Clean Out (CO) diameter 100mm Buah 24,00 Rp 115.940,00 Rp 2.782.560,00
- Peralatan bantu, sambungan, Tee, Elbow, bracket/support, dll Ls 1,00 Rp 309.315,00 Rp 309.315,00
Instalasi Air Hujan, dll : -
- Pipa uPVC dia.150mm M' 125,00 Rp 185.555,00 Rp 23.194.375,00
- Peralatan bantu, sambungan, Tee, Elbow, bracket/support, dll Ls 1,00 Rp 309.315,00 Rp 309.315,00

IV.1.4 2ND FLOOR Rp 122.792.020,00


a. Instalasi Air Bersih :
Pipa menggunakan PIPA PPR-PN-10
standard JIS.K 6742 lengkap accessories, dll
- Diameter 15mm M' 36,00 Rp 92.820,00 Rp 3.341.520,00
- Diameter 20mm M' 75,00 Rp 100.895,00 Rp 7.567.125,00
- Diameter 25mm M' 9,00 Rp 107.610,00 Rp 968.490,00
- Diameter 32mm M' 25,00 Rp 115.940,00 Rp 2.898.500,00
- Diameter 40mm M' 45,00 Rp 123.675,00 Rp 5.565.375,00
Peralatan bantu pipa, dll -
- Gate Valve diameter 40mm Buah 12,00 Rp 850.510,00 Rp 10.206.120,00
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Mekanikal & Elektrikal - Gedung A dan Gedung B (Typical)
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

- Faucet (dinding), diameter 15mm Buah 12,00 Rp 3.946.720,00 Rp 47.360.640,00


- Water Meter, diameter 20mm Buah 12,00 Rp 618.545,00 Rp 7.422.540,00
- Peralatan bantu, sambungan, Tee, Elbow, bracket/support, dll Ls 1,00 Rp 1.546.405,00 Rp 1.546.405,00
b. Instalasi Air Kotor dan Air Buangan : -
Pipa menggunakan uPVC type Plain end/Ts End Class VP -
standard JIS.K 6742 lengkap accessories, dll -
- Diameter 100mm M' 24,00 Rp 146.880,00 Rp 3.525.120,00
- Diameter 80mm M' 12,00 Rp 107.610,00 Rp 1.291.320,00
- Diameter 50mm M' 18,00 Rp 92.820,00 Rp 1.670.760,00
- Diameter 40mm M' 18,00 Rp 71.230,00 Rp 1.282.140,00
- Diameter 32mm ( Ventilasi ) M' 42,00 Rp 71.230,00 Rp 2.991.660,00
Peralatan bantu pipa, dll -
- Floor Drain (FD) diameter 50mm Buah 6,00 Rp 107.610,00 Rp 645.660,00
- Clean Out (CO) diameter 100mm Buah 6,00 Rp 115.940,00 Rp 695.640,00
- Peralatan bantu, sambungan, Tee, Elbow, bracket/support, dll Ls 1,00 Rp 309.315,00 Rp 309.315,00
Instalasi Air Hujan, dll : -
- Pipa uPVC dia.150mm M' 125,00 Rp 185.555,00 Rp 23.194.375,00
- Peralatan bantu, sambungan, Tee, Elbow, bracket/support, dll Ls 1,00 Rp 309.315,00 Rp 309.315,00

IV.1.5 3RD FLOOR Rp 134.819.180,00


a. Instalasi Air Bersih :
-Pipa menggunakan PIPA PPR PN - 10
standard JIS.K 6742 lengkap accessories, dll
- Electirc Water Heater Cap.30Ltr Unit 2,00 Rp 463.930,00 Rp 927.860,00
- Diameter 15mm M' 50,00 Rp 92.820,00 Rp 4.641.000,00
- Diameter 20mm M' 25,00 Rp 100.895,00 Rp 2.522.375,00
- Diameter 25mm M' 10,00 Rp 107.610,00 Rp 1.076.100,00
- Diameter 32mm M' 10,00 Rp 115.940,00 Rp 1.159.400,00
- Diameter 40mm M' 12,00 Rp 123.675,00 Rp 1.484.100,00
Peralatan bantu pipa, dll -
- Gate Valve diameter 40mm Buah 1,00 Rp 850.510,00 Rp 850.510,00
- Faucet (dinding), diameter 15mm Buah 22,00 Rp 3.946.720,00 Rp 86.827.840,00
- Water Meter, diameter 20mm Buah 3,00 Rp 618.545,00 Rp 1.855.635,00
- Peralatan bantu, sambungan, Tee, Elbow, bracket/support, dll Ls 1,00 Rp 1.546.405,00 Rp 1.546.405,00
b. Instalasi Air Kotor dan Air Buangan : -
Pipa menggunakan PIPA PVC Class AW -
standard JIS.K 6742 lengkap accessories, dll -
- Diameter 100mm M' 24,00 Rp 146.880,00 Rp 3.525.120,00
- Diameter 80mm M' 3,00 Rp 107.610,00 Rp 322.830,00
- Diameter 50mm M' 156,00 Rp 92.820,00 Rp 14.479.920,00
- Diameter 40mm M' 3,00 Rp 71.230,00 Rp 213.690,00
- Diameter 32mm ( Ventilasi ) M' 3,00 Rp 64.515,00 Rp 193.545,00
Peralatan bantu pipa, dll -
- Floor Drain (FD) diameter 50mm Buah 10,00 Rp 107.610,00 Rp 1.076.100,00
- Clean Out (CO) diameter 100mm Buah 4,00 Rp 115.940,00 Rp 463.760,00
- Peralatan bantu, sambungan, Tee, Elbow, bracket/support, dll Ls 1,00 Rp 309.315,00 Rp 309.315,00
c. Instalasi Air Hujan, dll : -
- Pipa uPVC dia.150mm M' 10,00 Rp 185.555,00 Rp 1.855.550,00
- Diameter 100mm M' 42,00 Rp 146.880,00 Rp 6.168.960,00
- Diameter 50mm M' 25,00 Rp 77.350,00 Rp 1.933.750,00
- Diameter 32mm ( Ventilasi ) M' 20,00 Rp 53.805,00 Rp 1.076.100,00
- Peralatan bantu, sambungan, Tee, Elbow, bracket/support, dll Ls 1,00 Rp 309.315,00 Rp 309.315,00

IV.1.6 4TH Floor s/d 8TH Floor ( typical 5 Floor ) Rp 406.593.165,00


a. Instalasi Air Bersih & Air panas
-Pipa menggunakan PIPA PPR PN - 10
standard JIS.K 6742 lengkap accessories, dll
- Electirc Water Heater Cap.30Ltr Unit 120,00 Rp 463.930,00 Rp 55.671.600,00
- Diameter 15mm M' 600,00 Rp 92.820,00 Rp 55.692.000,00
- Diameter 20mm M' 72,00 Rp 100.895,00 Rp 7.264.440,00
- Diameter 25mm M' 72,00 Rp 107.610,00 Rp 7.747.920,00
- Diameter 32mm M' 72,00 Rp 115.940,00 Rp 8.347.680,00
- Diameter 40mm M' 240,00 Rp 123.675,00 Rp 29.682.000,00
Peralatan bantu pipa, dll -
- Gate Valve diameter 40mm Buah 24,00 Rp 850.510,00 Rp 20.412.240,00
- Faucet (dinding), diameter 15mm Buah 24,00 Rp 3.946.720,00 Rp 94.721.280,00
-Gate Valve diameter 20mm Buah 24,00 Rp 618.545,00 Rp 14.845.080,00
- Peralatan bantu, sambungan, Tee, Elbow, bracket/support, dll Ls 1,00 Rp 1.546.405,00 Rp 1.546.405,00
b. Instalasi Air Kotor dan Air Buangan : -
Pipa menggunakan PIPA PVC Class AW -
standard JIS.K 6742 lengkap accessories, dll -
- Diameter 100mm M' 150,00 Rp 146.880,00 Rp 22.032.000,00
- Diameter 80mm M' 24,00 Rp 107.610,00 Rp 2.582.640,00
- Diameter 50mm M' 156,00 Rp 92.820,00 Rp 14.479.920,00
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Mekanikal & Elektrikal - Gedung A dan Gedung B (Typical)
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

- Diameter 40mm M' 3,00 Rp 71.230,00 Rp 213.690,00


- Diameter 32mm ( Ventilasi ) M' 3,00 Rp 64.515,00 Rp 193.545,00
Peralatan bantu pipa, dll -
- Floor Drain (FD) diameter 50mm Buah 24,00 Rp 107.610,00 Rp 2.582.640,00
- Clean Out (CO) diameter 100mm Buah 24,00 Rp 115.940,00 Rp 2.782.560,00
- Peralatan bantu, sambungan, Tee, Elbow, bracket/support, dll Ls 1,00 Rp 309.315,00 Rp 309.315,00
c. Instalasi Air Hujan, dll : -
- Pipa uPVC dia.150mm M' 125,00 Rp 185.555,00 Rp 23.194.375,00
- Peralatan bantu, sambungan, Tee, Elbow, bracket/support, dll Ls 1,00 Rp 146.880,00 Rp 146.880,00
- Diameter 150mm M' 42,00 Rp 106.930,00 Rp 4.491.060,00
- Diameter 50mm M' 50,00 Rp 115.940,00 Rp 5.797.000,00
- Diameter 32mm ( Ventilasi ) M' 3,00 Rp 309.315,00 Rp 927.945,00
Peralatan bantu pipa, dll -
- Roff Drain (RD) diameter 80mm Buah 20,00 Rp 773.245,00 Rp 15.464.900,00
- Peralatan bantu, sambungan, Tee, Elbow, bracket/support, dll Ls 1,00 Rp 15.464.050,00 Rp 15.464.050,00

V.1 PEKERJAAN FIRE FIGHTING ( HYDRANT & SPRINKLER ) Rp 1.001.865.420,00


PEKERJAAN PEMIPAAN, FITTING DAN VALVE
V.1.1 Basement Floor Rp 94.054.625,00
a Pipa menggunakan Black Steel Pipe (BSP), Medium Class
Standar BS.1387 / 85 lengkap elbow, reducer, T-Way, dll
- Diameter 25 mm M' 156,00 Rp 63.835,00 Rp 9.958.260,00
- Diameter 32 mm M' 22,00 Rp 72.590,00 Rp 1.596.980,00
- Diameter 40 mm M' 40,00 Rp 81.685,00 Rp 3.267.400,00
- Diameter 50 mm M' 45,00 Rp 90.780,00 Rp 4.085.100,00
- Diameter 65 mm M' 9,00 Rp 100.895,00 Rp 908.055,00
- Diameter 80 mm M' 8,00 Rp 107.610,00 Rp 860.880,00
- Diameter 100 mm M' 18,00 Rp 117.640,00 Rp 2.117.520,00
- Diameter 150 mm M' 3,00 Rp 127.755,00 Rp 383.265,00
- Fitting, Elbow, tee,reducer dll Ls 1,00 Rp 403.410,00 Rp 403.410,00
- Hanger, klem, bracket / support , dll Ls 1,00 Rp 336.175,00 Rp 336.175,00
b Sprinkler Head Buah 44,00 Rp 1.142.995,00 Rp 50.291.780,00
Type : Pendant glass bulb -
Temp. Ratings : 57° C -
Warna : Orange -
Size : 1/2" -
c Peralatan bantu pipa, dll : -
- Gate Valve 16K, dia. 25 mm Buah 2,00 Rp 376.550,00 Rp 753.100,00
- Gate Valve 16K, dia.150 mm Buah 4,00 Rp 457.215,00 Rp 1.828.860,00
- Check Valve 16K, dia.150 mm Buah 1,00 Rp 457.215,00 Rp 457.215,00
- Pressure Gauge Buah 4,00 Rp 376.550,00 Rp 1.506.200,00
- Flow Switch Buah 2,00 Rp 874.055,00 Rp 1.748.110,00
-
d Hydrant Box Unit (HB) -
Bahan boxes baja sheet T=2mm produk pabrik, di-cat merah, daun -
Stainless Steel sheet T=1,2mm, tulisan HYDRANT warna merah dicetak -
timbul, lengkap rubber hose L=minimal 30 meter, nozzle, valve & -
accessories
e Pipa menggunakan Black Steel Pipe (BSP), Schedule 40, A.53 / A.120 -
Standar BS.1387 / 85 lengkap elbow, reducer, T-Way, dll -
- Diameter 100 mm M' 15,00 Rp 127.755,00 Rp 1.916.325,00
- Diameter 65 mm M' 100,00 Rp 100.895,00 Rp 10.089.500,00
- Fitting, Elbow, tee,reducer dll Ls 1,00 Rp 403.410,00 Rp 403.410,00
- Hanger, klem, bracket / support, dll Ls 1,00 Rp 268.940,00 Rp 268.940,00
f Peralatan bantu pipa, dll : -
- Gate Valve 10K, dia.100 mm Buah 1,00 Rp 437.070,00 Rp 437.070,00
- Gate Valve 10K, dia.65 mm Buah 1,00 Rp 437.070,00 Rp 437.070,00

V.1.1 1ST FLOOR Rp 116.645.585,00


a Pipa menggunakan Black Steel Pipe (BSP), Medium Class
Standar BS.1387 / 85 lengkap elbow, reducer, Tee
- Diameter 25 mm M' 156,00 Rp 63.835,00 Rp 9.958.260,00
- Diameter 32 mm M' 22,00 Rp 72.590,00 Rp 1.596.980,00
- Diameter 40 mm M' 40,00 Rp 81.685,00 Rp 3.267.400,00
- Diameter 50 mm M' 45,00 Rp 90.780,00 Rp 4.085.100,00
- Diameter 65 mm M' 9,00 Rp 100.895,00 Rp 908.055,00
- Diameter 80 mm M' 8,00 Rp 107.610,00 Rp 860.880,00
- Diameter 100 mm M' 18,00 Rp 117.640,00 Rp 2.117.520,00
- Diameter 150 mm M' 3,00 Rp 127.755,00 Rp 383.265,00
- Fitting, Elbow, tee,reducer dll Ls 1,00 Rp 403.410,00 Rp 403.410,00
- Hanger, klem, bracket / support , dll Ls 1,00 Rp 336.175,00 Rp 336.175,00
b Sprinkler Head Buah 60,00 Rp 1.142.995,00 Rp 68.579.700,00
Type : Pendant glass bulb -
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Mekanikal & Elektrikal - Gedung A dan Gedung B (Typical)
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

Temp. Ratings : 57° C -


Warna : Orange -
Size : 1/2" -
c Peralatan bantu pipa, dll : -
- Gate Valve 16K, dia. 25 mm Buah 2,00 Rp 376.550,00 Rp 753.100,00
- Gate Valve 16K, dia.150 mm Buah 4,00 Rp 457.215,00 Rp 1.828.860,00
- Check Valve 16K, dia.150 mm Buah 1,00 Rp 457.215,00 Rp 457.215,00
- Pressure Gauge Buah 4,00 Rp 376.550,00 Rp 1.506.200,00
- Flow Switch Buah 2,00 Rp 874.055,00 Rp 1.748.110,00
d Hydrant Box Unit (HB) Unit 2,00 Rp 2.151.520,00 Rp 4.303.040,00
Bahan boxes baja sheet T=2mm produk pabrik, di-cat merah, daun -
Stainless Steel sheet T=1,2mm, tulisan HYDRANT warna merah dicetak -
timbul, lengkap rubber hose L=minimal 30 meter, nozzle, valve & -
accessories
e Pipa menggunakan Black Steel Pipe (BSP), Schedule 40, A.53 / A.120 -
Standar BS.1387 / 85 lengkap elbow, reducer, Tee dll -
- Diameter 100 mm M' 15,00 Rp 127.755,00 Rp 1.916.325,00
- Diameter 65 mm M' 100,00 Rp 100.895,00 Rp 10.089.500,00
- Fitting, Elbow, tee,reducer dll Ls 1,00 Rp 403.410,00 Rp 403.410,00
f - Hanger, klem, bracket / support, dll Ls 1,00 Rp 268.940,00 Rp 268.940,00
Peralatan bantu pipa dll. -
- Gate Valve 10K dia. 100 mm Buah 1,00 Rp 437.070,00 Rp 437.070,00
- Gate Valve 10K dia. 65 mm Buah 1,00 Rp 437.070,00 Rp 437.070,00

V.1.2 2ND FLOOR Rp 289.759.985,00


a Pipa menggunakan Black Steel Pipe (BSP), Medium Class
Standar BS.1387 / 85 lengkap elbow, reducer, T-Way, dll
- Diameter 25 mm M' 156,00 Rp 63.835,00 Rp 9.958.260,00
- Diameter 32 mm M' 22,00 Rp 72.590,00 Rp 1.596.980,00
- Diameter 40 mm M' 40,00 Rp 81.685,00 Rp 3.267.400,00
- Diameter 50 mm M' 45,00 Rp 90.780,00 Rp 4.085.100,00
- Diameter 65 mm M' 9,00 Rp 100.895,00 Rp 908.055,00
- Diameter 80 mm M' 8,00 Rp 107.610,00 Rp 860.880,00
- Diameter 100 mm M' 18,00 Rp 117.640,00 Rp 2.117.520,00
- Diameter 150 mm M' 3,00 Rp 127.755,00 Rp 383.265,00
- Fitting, Elbow, tee,reducer dll Ls 1,00 Rp 403.410,00 Rp 403.410,00
- Hanger, klem, bracket / support , dll Ls 1,00 Rp 403.410,00 Rp 403.410,00
b Sprinkler Head Buah 60,00 Rp 1.142.995,00 Rp 68.579.700,00
Type : Pendant glass bulb -
Temp. Ratings : 57° C -
Warna : Orange -
Size : 1/2" -
c Peralatan bantu pipa, dll : -
- Gate Valve 16K, dia. 25 mm Buah 2,00 Rp 376.550,00 Rp 753.100,00
- Gate Valve 16K, dia.150 mm Buah 2,00 Rp 457.215,00 Rp 914.430,00
- Pressure Gauge Buah 4,00 Rp 376.550,00 Rp 1.506.200,00
- Flow Switch Buah 2,00 Rp 874.055,00 Rp 1.748.110,00
d Hydrant Box Unit (HB) -
Bahan boxes baja sheet T=2mm produk pabrik, di-cat merah, daun -
Stainless Steel sheet T=1,2mm, tulisan HYDRANT warna merah dicetak -
timbul, lengkap rubber hose L=minimal 30 meter, nozzle, valve & -
accessories
e Pipa menggunakan Black Steel Pipe (BSP), Schedule 40, A.53 / A.120 -
Standar BS.1387 / 85 lengkap elbow, reducer, Tee, dll -
- Diameter 100 mm M' 15,00 Rp - Rp -
- Diameter 65 mm M' 30,00 Rp 100.895,00 Rp 3.026.850,00
- Fitting, Elbow, tee,reducer dll Ls 1,00 Rp 403.410,00 Rp 403.410,00
- Hanger, klem, bracket / support, dll Ls 1,00 Rp 268.940,00 Rp 268.940,00
f Peralatan bantu pipa, dll : -
- Gate Valve 10K, dia.100 mm Buah 1,00 Rp 437.070,00 Rp 437.070,00
- Gate Valve 10K, dia.65 mm Buah 1,00 Rp 437.070,00 Rp 437.070,00

V.1.3 3RD FLOOR Rp 187.700.825,00


a Pipa menggunakan Black Steel Pipe (BSP), Medium Class
Standar BS.1387 / 85 lengkap elbow, reducer, T-Way, dll
- Diameter 25 mm M' 156,00 Rp 63.835,00 Rp 9.958.260,00
- Diameter 32 mm M' 22,00 Rp 72.590,00 Rp 1.596.980,00
- Diameter 40 mm M' 40,00 Rp 81.685,00 Rp 3.267.400,00
- Diameter 50 mm M' 45,00 Rp 90.780,00 Rp 4.085.100,00
- Diameter 65 mm M' 9,00 Rp 100.895,00 Rp 908.055,00
- Diameter 80 mm M' 8,00 Rp 107.610,00 Rp 860.880,00
- Diameter 100 mm M' 18,00 Rp 117.640,00 Rp 2.117.520,00
- Diameter 150 mm M' 3,00 Rp 127.755,00 Rp 383.265,00
- Fitting, Elbow, tee,reducer dll Ls 1,00 Rp 403.410,00 Rp 403.410,00
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Mekanikal & Elektrikal - Gedung A dan Gedung B (Typical)
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

- Hanger, klem, bracket / support , dll Ls 1,00 Rp 403.410,00 Rp 403.410,00


b Sprinkler Head Buah 126,00 Rp 1.142.995,00 Rp 144.017.370,00
Type : Pendant glass bulb -
Temp. Ratings : 57° C -
Warna : Orange -
Size : 1/2" -
c Peralatan bantu pipa, dll : -
- Gate Valve 16K, dia. 25 mm Buah 2,00 Rp 376.550,00 Rp 753.100,00
- Gate Valve 16K, dia.150 mm Buah 4,00 Rp 457.215,00 Rp 1.828.860,00
- Check Valve 16K, dia.150 mm Buah 1,00 Rp 457.215,00 Rp 457.215,00
- Pressure Gauge Buah 4,00 Rp 376.550,00 Rp 1.506.200,00
- Flow Switch Buah 2,00 Rp 874.055,00 Rp 1.748.110,00
d Hydrant Box Unit (HB) 2,00 -
Bahan boxes baja sheet T=2mm produk pabrik, di-cat merah, daun -
Stainless Steel sheet T=1,2mm, tulisan HYDRANT warna merah dicetak -
timbul, lengkap rubber hose L=minimal 30 meter, nozzle, valve & -
accessories
e Pipa menggunakan Black Steel Pipe (BSP), Schedule 40, A.53 / A.120 -
Standar BS.1387 / 85 lengkap elbow, reducer, Tee, dll -
- Diameter 100 mm M' 15,00 Rp 117.980,00 Rp 1.769.700,00
- Diameter 65 mm M' 100,00 Rp 100.895,00 Rp 10.089.500,00
- Fitting, Elbow, tee,reducer dll Ls 1,00 Rp 403.410,00 Rp 403.410,00
- Hanger, klem, bracket / support, dll Ls 1,00 Rp 268.940,00 Rp 268.940,00
f Peralatan bantu pipa, dll : -
- Gate Valve 10K, dia.100 mm Buah 1,00 Rp 437.070,00 Rp 437.070,00
- Gate Valve 10K, dia.65 mm Buah 1,00 Rp 437.070,00 Rp 437.070,00

V.1.4 4TH Floor s/d 8TH Floor ( Typical 5 Floor ) Rp 313.704.400,00


a Pipa menggunakan Black Steel Pipe (BSP), Medium Class
Standar BS.1387 / 85 lengkap elbow, reducer, T-Way, dll
- Diameter 25 mm M' 60,00 Rp 63.835,00 Rp 3.830.100,00
- Diameter 32 mm M' 75,00 Rp 72.590,00 Rp 5.444.250,00
- Diameter 40 mm M' 40,00 Rp 81.685,00 Rp 3.267.400,00
- Diameter 50 mm M' 45,00 Rp 90.780,00 Rp 4.085.100,00
- Diameter 65 mm M' 250,00 Rp 100.895,00 Rp 25.223.750,00
- Diameter 80 mm M' 50,00 Rp 107.610,00 Rp 5.380.500,00
- Diameter 100 mm M' 20,00 Rp 117.980,00 Rp 2.359.600,00
- Diameter 150 mm M' 30,00 Rp 127.755,00 Rp 3.832.650,00
- Fitting, Elbow, tee,reducer dll Ls 1,00 Rp 268.940,00 Rp 268.940,00
- Hanger, klem, bracket / support , dll Ls 1,00 Rp 403.410,00 Rp 403.410,00
b Sprinkler Head Buah 125,00 Rp 874.055,00 Rp 109.256.875,00
Type : Side Wall glass bulb -
Temp. Ratings : 57° C -
Warna : Orange -
Size : 1/2" -
b Sprinkler Head Buah 205,00 Rp 605.115,00 Rp 124.048.575,00
Type : Pendant glass bulb -
Temp. Ratings : 57° C -
Warna : Orange -
Size : 1/2" -
c Peralatan bantu pipa, dll : -
- Gate Valve 16K, dia. 25 mm Buah 5,00 Rp 376.550,00 Rp 1.882.750,00
- Gate Valve 16K, dia.150 mm Buah 5,00 Rp 457.215,00 Rp 2.286.075,00
- Pressure Gauge Buah 5,00 Rp 376.550,00 Rp 1.882.750,00
- Flow Switch Buah 5,00 Rp 874.055,00 Rp 4.370.275,00
d Hydrant Box Unit (HB) Unit 5,00 Rp 2.151.520,00 Rp 10.757.600,00
Bahan boxes baja sheet T=2mm produk pabrik, di-cat merah, daun -
Stainless Steel sheet T=1,2mm, tulisan HYDRANT warna merah dicetak -
timbul, lengkap rubber hose L=minimal 30 meter, nozzle, valve & -
accessories
e Pipa menggunakan Black Steel Pipe (BSP), Schedule 40, A.53 / A.120 -
Standar BS.1387 / 85 lengkap elbow, reducer, T-Way, dll -
- Fitting, Elbow, tee,reducer dll Ls 1,00 Rp 376.550,00 Rp 376.550,00
- Hanger, klem, bracket / support, dll Ls 1,00 Rp 376.550,00 Rp 376.550,00
f Peralatan bantu pipa, dll : -
- Gate Valve 10K, dia.100 mm Buah 5,00 Rp 437.070,00 Rp 2.185.350,00
- Gate Valve 10K, dia.65 mm Buah 5,00 Rp 437.070,00 Rp 2.185.350,00

VI. PEKERJAAN AC & VENTILASI MEKANIK Rp 1.920.446.905,00

VI.1 PEKERJAAN AC & VENTILASI MEKANIK BASEMENT Rp 110.467.105,00


A. PERALATAN UTAMA Rp 99.978.445,00
a. Exhaust Fan Parkir Unit 2,00 Rp 17.481.100,00 Rp 34.962.200,00
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Mekanikal & Elektrikal - Gedung A dan Gedung B (Typical)
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

Type : Axial Type -


Aliran Udara : 10.000 CFM -
b. Intake fan ( IF ) Unit 1,00 Rp 17.481.100,00 Rp 17.481.100,00
Type : Axial Type -
Aliran Udara : 10.000 CFM -
c. Exhaust fan Pump Room ( E F.BS ) Unit 1,00 Rp 5.042.625,00 Rp 5.042.625,00
Type : Axial Duct -
Aliran Udara : 1400 CFM -
d. Exhaust fan Workshop ( E F.BS ) -
Type : Propeller type Unit 3,00 Rp 2.689.400,00 Rp 8.068.200,00
Aliran Udara : 100 CFM -
e. Exhaust fan Laundry Room ( E F.BS ) -
Type : Axial Duct Unit 1,00 Rp 5.042.625,00 Rp 5.042.625,00
Aliran Udara : 1400 CFM -
f. Intake fan Laundry Room ( E F.BS ) -
Type : Axial Duct Unit 1,00 Rp 5.042.625,00 Rp 5.042.625,00
Aliran Udara : 1400 CFM -
g. Exhaust fan Toilet ( E F.BS ) -
Type : Propeller type R.Scuruty Unit 1,00 Rp 2.689.400,00 Rp 2.689.400,00
Aliran Udara : 100 CFM -
h. Exhaust fan STP ( E F.BS ) -
Type : Axial Duct Unit 1,00 Rp 4.706.450,00 Rp 4.706.450,00
Aliran Udara : 2000 CFM -
i. Intake Air fan STP ( E F.BS ) -
Type : Axial Duct Unit 1,00 Rp 5.378.800,00 Rp 5.378.800,00
Aliran Udara : 2500 CFM -
y. AC SPLIT Scurity Control Room & Garbage Room Unit 2,00 Rp 5.782.210,00 Rp 11.564.420,00
Type : Wall Mounted

B. INSTALASI DUCTING AND GRILLE Rp 10.488.660,00


- Ducting tanpa isolasi BJLS 100, bracket / support dll. LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Ducting tanpa isolasi 100 x 100 BJLS 50, bracket / support dll. LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Ducting tanpa isolasi 150 x 150 BJLS 50, bracket / support dll. LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Ducting tanpa isolasi 200 x 200 BJLS 60, bracket / support dll. LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Ducting tanpa isolasi 1000 x 350 BJLS 100, bracket / support dll. LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Bracket / support dll LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Grille, Diffuser, dll. Testing & Commissioning LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Testing & Commissioning Lot 1,00 Rp 2.017.050,00 Rp 2.017.050,00

VI.2 PEKERJAAN AC & VENTILASI 1ST FLOOR Rp 245.407.750,00


A. PERALATAN UTAMA Rp 234.919.090,00
a. AC SPLIT-6&7 Lift Lobby Hall & all day dinning Unit 2,00 31.465.980,00 Rp 62.931.960,00
Type : Split Duct -
Aliran Udara : 121.500 Btuh/4050 CFM -
b. AC SPLIT-8 Lounge Unit 1,00 31.465.980,00 Rp 31.465.980,00
Type : Split Duct -
Aliran Udara : 121.500 Btuh/4200 CFM -
c. AC-4 Drag Store Unit 1,00 9.009.490,00 Rp 9.009.490,00
Type : Wall Mounted -
Aliran Udara : 12.000 Btuh/400 CFM -
d. AC-5 Front Office Unit 1,00 9.009.490,00 Rp 9.009.490,00
Type : Wall Mounted -
Aliran Udara : 12.000 Btuh/400 CFM -
e. AC-1-2-3 Kitchen Unit 3,00 9.009.490,00 Rp 27.028.470,00
Type : Wall Mounted -
Aliran Udara : 12.000 Btuh/400 CFM -
f. Exhaust Main Kitchen Unit 1,00 Rp 17.481.100,00 Rp 17.481.100,00
Type : Axial Type (Main Kitchen Hood) -
Aliran Udara : 10.000 CFM -
g. Intake Air Fan Area Fan Kitchen (IF) Unit 1,00 Rp 7.395.850,00 Rp 7.395.850,00
Type : Axial Type -
Aliran Udara : 3.000 CFM -
h. Exhaust Air Fan Area Fan Kitchen (EF) Unit 1,00 Rp 7.395.850,00 Rp 7.395.850,00
Type : Axial Type -
Aliran Udara : 3.000 CFM -
i. Exhaust Air Fan Trafo & Genset Room (EF. GF) Unit 2,00 Rp 7.395.850,00 Rp 14.791.700,00
Type : Axial Type -
Aliran Udara : 3.000 CFM -
j. Exhaust Air Fan Storage Room Unit 1,00 Rp 2.689.400,00 Rp 2.689.400,00
Type : Propeller Ceiling Mounted -
Aliran Udara : 100 CFM -
k. Exhaust Air Fan Toilet Room Unit 17,00 Rp 2.689.400,00 Rp 45.719.800,00
Type : Propeller Ceiling Mounted
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Mekanikal & Elektrikal - Gedung A dan Gedung B (Typical)
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

Aliran Udara : 100 CFM

B. INSTALASI DUCTING AND GRILLE Rp 10.488.660,00


- Ducting tanpa isolasi BJLS 100, bracket / support dll. LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Ducting tanpa isolasi 100 x 100 BJLS 50, bracket / support dll. LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Ducting tanpa isolasi 150 x 150 BJLS 50, bracket / support dll. LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Ducting tanpa isolasi 200 x 200 BJLS 60, bracket / support dll. LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Ducting tanpa isolasi 1000 x 350 BJLS 100, bracket / support dll. LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Bracket / support dll LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Grille, Diffuser, dll. Testing & Commissioning LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Testing & Commissioning Lot 1,00 Rp 2.017.050,00 Rp 2.017.050,00

VI.3 PEKERJAAN AC & VENTILASI 2ND FLOOR Rp 253.758.490,00


A. PERALATAN UTAMA Rp 243.269.830,00
a. AC SPLITSpa Bed Room 1-2-3-4-5 Unit 5,00 9.009.490,00 Rp 45.047.450,00
Type : Wall Mounted -
Aliran Udara : 12.000 Btuh/400 CFM -
b. AC SPLIT BOH Back of The House Unit 1,00 35.634.550,00 Rp 35.634.550,00
Type : Split Duct -
Aliran Udara : 102.600 Btuh/3500 CFM -
c. AC SPLIT BOH Back of The House GRL 1-2-B-C Unit 2,00 7.261.380,00 Rp 14.522.760,00
Type : Wall Mounted -
Aliran Udara : 9000 Btuh/400 CFM -
d. AC SPLIT Discotig & Bar Unit 1,00 35.903.490,00 Rp 35.903.490,00
Type : Split Duct -
Aliran Udara : 97.600 Btuh/3500 CFM -
e. AC SPLIT Lift Lobby & Coridor Unit 1,00 35.903.490,00 Rp 35.903.490,00
Type : Split Duct -
Aliran Udara : 97.600 Btuh/3500 CFM -
f. AC SPLIT Receptionis Unit 1,00 6.320.090,00 Rp 6.320.090,00
Type : Wall Mounted -
Aliran Udara : 7000 Btuh/400 CFM -
g. Intake Air Fan Discotic & Bar (I.F.MGF) Unit 1,00 Rp 3.825.000,00 Rp 3.825.000,00
Type : Axial Duct -
Aliran Udara : 2.200 CFM -
h. Intake Air Fan Discotic & Bar (E.F.MGF) Unit 1,00 Rp 3.825.000,00 Rp 3.825.000,00
Type : Axial Duct -
Aliran Udara : 2.200 CFM -
i. Exhaust Air Fan Fitness Room (I.F.MGF) Unit 1,00 Rp 3.187.500,00 Rp 3.187.500,00
Type : Axial Type -
Aliran Udara : 1.400 CFM -
k. Exhaust Air Fan Fitness Room (I.F.MGF) Unit 1,00 Rp 3.187.500,00 Rp 3.187.500,00
Type : Axial Type -
Aliran Udara : 1.400 CFM -
j. Exhaust Air Fan Storage (E.F.MGF) Unit 1,00 Rp 2.125.000,00 Rp 2.125.000,00
Type : Axial Duct -
Aliran Udara : 1200 CFM -
k. Exhaust Air Fan Toilet Room Unit 20,00 Rp 2.689.400,00 Rp 53.788.000,00
Type : Propeller Ceiling Mounted
Aliran Udara : 100 CFM

B. INSTALASI DUCTING AND GRILLE Rp 10.488.660,00


- Ducting tanpa isolasi BJLS 100, bracket / support dll. LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Ducting tanpa isolasi 100 x 100 BJLS 50, bracket / support dll. LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Ducting tanpa isolasi 150 x 150 BJLS 50, bracket / support dll. LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Ducting tanpa isolasi 200 x 200 BJLS 60, bracket / support dll. LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Ducting tanpa isolasi 1000 x 350 BJLS 100, bracket / support dll. LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Bracket / support dll LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Grille, Diffuser, dll. Testing & Commissioning LS 1,00 Rp 1.210.230,00 Rp 1.210.230,00
- Testing & Commissioning Lot 1,00 Rp 2.017.050,00 Rp 2.017.050,00

VI.4 PEKERJAAN AC & VENTILASI MEKANIK 4TH up to 8TH Floor Rp 1.310.813.560,00


A. PERALATAN UTAMA Rp 1.300.324.900,00
a AC SPLIT Std Bed room 1 up to 25 unit 125,00 9.009.490,00 Rp 1.126.186.250,00
Type : Split duct (ceiling Conceal) -
Aliran Udara : 12.000 Btuh/400BCfm -
b AC SPLIT Coridor & lift Lobby unit 5,00 22.456.490,00 Rp 112.282.450,00
Type : Split duct (ceiling Conceal) -
Aliran Udara : 48.000 Btuh/2000Cfm -
c AC SPLIT Service station room unit 5,00 9.009.490,00 Rp 45.047.450,00
Type : Split duct (ceiling Conceal) -
Aliran Udara : 12.000 Btuh/00Cfm -
d Exhaust air fan panel room unit 5,00 Rp 3.361.750,00 Rp 16.808.750,00
Proyek : Pembangunan Hotel Wisanti
Pekerjaan : Mekanikal & Elektrikal - Gedung A dan Gedung B (Typical)
Lokasi : Yogyakarta
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. JUMLAH

Type : Propelerr ceiling mounted


Aliran Udara : 150Cfm

B. INSTALASI DUCTING AND GRILLE Rp 10.488.660,00


Ducting tanpa isolasi.100 x 100. BJLS 50, bracket/support, dll lot 1,00 Rp 1.210.230,00 Rp 1.210.230,00
Ducting tanpa isolasi.150 x 150. BJLS 50, bracket/support, dll lot 1,00 Rp 1.210.230,00 Rp 1.210.230,00

Ducting tanpa isolasi.200 x 200. BJLS 60, bracket/support, dll lot 1,00 Rp 1.210.230,00 Rp 1.210.230,00
Ducting tanpa isolasi.1000 x 350. BJLS 100, bracket/support, dll lot 1,00 Rp 1.210.230,00 Rp 1.210.230,00
Bracket/support dll lot 1,00 Rp 1.210.230,00 Rp 1.210.230,00
Grille,Diffuser, dll lot 1,00 Rp 1.210.230,00 Rp 1.210.230,00
Instalansi kabel power NYM 3x2,5 mm2 (bed room) lot 1,00 Rp 1.210.230,00 Rp 1.210.230,00
Testing & Commisioning lot 1,00 Rp 2.017.050,00 Rp 2.017.050,00

VII PEKERJAAN LIFT PASSENGER (ELEVATOR), 2 UNIT 10 ORANG,


Rp 7.179.353.300,00
90 MPM DAN LIFT SERVICE 2 UNIT, 1000 KG, 90 MPM
A. LIFT PENUMPANG unit 2,00 Rp 1.873.167.100,00 Rp 3.746.334.200,00
Fungsi : Lift penumpang -
Merk : Hyundai -
Kapasitas : 10 Orang -
Kapasitas : 1000 Kg -
Kecepatan : 90 meter/menit -
Jumlah Stop : 9 Stop / Opening -
Power Cap : Kw -
Machine Room : Direct Above Hoistway -
Lengkap Automatic Rescue Device (ARD ) dan Alat bantu -
-
B. LIFT SERVICE / FREIGHT ELEVATOR unit 1,00 Rp 1.873.167.100,00 Rp 1.873.167.100,00
Fungsi : Service / fireman -
Merk : Hyundai -
Kapasitas : 1000 Kg -
Kecepatan : 90 meter/menit -
Jumlah Stop : 9 Stop / Opening -
Power Cap : Kw -
Machine Room : Direct Above Hoistway -
Lengkap Automatic Rescue Device (ARD ) dan Alat bantu -
Biaya instalansi Unit Lift -
lift penumpang unit 3 Rp 60.511.500,00 Rp 181.534.500,00
Lift Service unit 1 Rp 60.511.500,00 Rp 60.511.500,00
Test & Commisioning unit 3 Rp 13.447.000,00 Rp 40.341.000,00
-
-
C. PEKERJAAN GONDOLA set 1 Rp 1.277.465.000,00 Rp 1.277.465.000,00
Instalansi Gondola Berikut material bantu
Gondola Dvit socket type

Jumlah Rp 32.784.043.155,00
THREAD MILL
HIGH PULLEY
BENCH
PRESS
WEIGHTS
DOWN

G.Toilet

MULTI GYM
3.5MX2.4M L.Toilet

DUMBELLS
3.5MX2.8M

G.Toilet
L.Toilet 3.5MX2.4M
3.5MX2.8M
R . Bilas

WARM UP PLATE/
FLOOR EXERSICE

R. Olahraga
Souna

Souna

Chef CABIN
4mx2m

LIFT
Gudang Peralatan

GUEST CORE
LIFT
DOWN
KITCHEN

UP

COLD
STORAGE

MANAGER CABIN STAGE


STORE
ROOM

LIFT
BARANG RUANG
CLOCK ROOM
KARYAWAN
DOWN

GARDU ATM
PLN CENTRE

SECURITY SECURITY

TROTOAR

SITEPLAN
JALAN TAMAN SISWA

U
HOTEL
WISANTI

TAMPAK DEPAN
TAMPAK KANAN
TAMPAK BELAKANG
Finising cat abu-abu muda

Finising cat abu-abu tua


Finising cat abu-abu tua

Finising cat abu-abu muda


Pintu Jendela alumunium kaca

Finising cat abu-abu tua

Relling alumunium kaca

Finising cat warna abu-abu tua


Relling alumunium kaca
Finising cat abu-abu tua
Tanaman rambat
HOTEL
Ornamen cutting
motif batik kawung WISANTI

Spotlight

Jendela alumunium kaca

Tanaman hias

TAMPAK DEPAN