A B B C D E
8000 8000 8000 8000
8000 8000 8000 8000
PAVEMENT
1 1 1 1
WC MAN
LIVING ROOM
TECHNICAL ROOM
+0.00
CORRIDOR
7300
7300
7300
7300
7300
TECHNICAL ROOM WC
MEETING ROOM WOMEN
2 2 2 2
300
THE MAIN LOBBY
22400
22400
7800
7800
7800
7200
7800
A A A A
+2.50
OFFICE ROOM
300
3 3 3 3
500
3650
-1.00
4750
4000
7300
7300
EQUIPMENT ROOM
100
WC WOMEN WC MAN
3650
2800
2400
2550
4 4 4 4
8000 1500 4500 2000 2000 6000 8000
KT-01
A B B C D E A B B C D E
8000 8000 8000 8000
8000 8000 8000 8000
1 1
1 1
WC
MAN
7300
7300
7300
7300
+29.800
WC
WOMEN
OFFICE
2 2 2 2
i=3%
i=3%
i=3%
i=3%
22400
7800
7800
BALCONY
22400
7800
8000
LOBBY
A A A A
+26.500
i=3%
i=3%
i=3%
+6.700
i=3%
LOBBY OF OFFICE
3 3 3 3
3650
4750
4750
7300
OFFICE
100
WC WOMEN WC MAN
3650
2400
2550
2550
2550
WATER TANK
4 4 4 4
8000 1500 4500 2000 2000 6000 8000
8000 1500 4500 2000 2000 6000 8000
32000
32000
A B C D E A B C D E
B 2ND TO 8TH FLOOR PLAN
KT-02
M
1000
+33.100
M M
3300
T
i=3% i=3%
+29.800 +29.800
Roof Floor Roof Floor
+28.150
3300
3300
S1 S1 T
+26.500 +26.500
8th Floor 8th Floor
+24.850
3300
3300
S1 S1 T
+23.200 +23.200
7th Floor 7th Floor
+21.550
3300
3300
S1 S1 T
+19.900 +19.900
6th Floor 6th Floor
+18.250
3300
3300
S1 S1 T
+16.600 +16.600
5th Floor 5th Floor
+14.950
3300
3300
S1 S1 T
+13.300 +13.300
4th Floor 4th Floor
+11.650
3300
3300
S1 S1 T
+10.000 +10.000
3rd Floor 3rd Floor
+8.350
3300
3300
S1 S1 T
+6.700 +6.700
2nd Floor 2nd Floor
+4.600
4200
4200
S1 S1 T
+2.500 +2.500
1st Floor 1st Floor
2500
2500
+0.750
±0.000 T ±0.000
B B
1000
1000
Basement Basement
-1.000 -1.000
7300 7800 7300
8000 8000 8000 8000
22400
32000
A B C D E 1 2 3 4
S1 B M T
Faculty of Building and
THANH XUAN Office Building
- Ceramic Tile 100x100 thickness 10mm - Tiles Layer thickness t= 15mm Industrial Construction Location: Le Duan street - Vinh city - Nghe An
- Cement Mortar thickness 30mm -Epoxi coating - Waterproof layer thickness 30 mm - Cement Mortar
- Reiforced Concrete slab - Cement Mortar Layer B3.5 ,t= 30mm - Slope Mortar Layer thickness 30mm - Reinforced-concrete thickness 120 mm
- Ceiling plaster thickness 15mm - Reiforced-Concrete slab - Reinforced-Concrete slab - Plastering mortar thickness 15mm SECTION
- Ceiling plaster thickness 15mm
KT-03
+33.100 +33.100
3300
+29.800 +29.800
ROOF Roof Floor
3300
+26.500 +26.500
STORY 8 8th Floor
3300
+23.200 +23.200
STORY 7 7th Floor
3300
+19.900 +19.900
STORY 6 6th Floor
3300
+16.600 +16.600
STORY 5 5th Floor
3300
+13.300 +13.300
STORY 4 4th Floor
3300
+10.000 +10.000
STORY 3 3rd Floor
3300
+6.700 +6.700
STORY 2 2nd Floor
4200
+2.500 +2.500
STORY 1 1st Floor
2500
±0.000 ±0.000
1 2 3 4 A B C D E
ELEVATION
Instructors 1 Instructors 2 Student Drawing No.
KT-04