Ch ina Co nstruc tion (So uth Pacif ic) Deve lopm ent C o Pte L td

PTW Serial No( 序列号 ): ______________________________


PERMIT TO WORK 施工准许证 - GENERAL WORK 一般工作
Form No( 文件号): EHSMS - 02 –
(THIS COPY SHALL BE DISPLAYED AT PLACE OF WORK, AS APPROPRIATE)
(将此复印并贴示在施工作业区内)
PROJECT TITLE(项目名称 : Home Team Tactical Center Phase 2A
APPLICANT COMPANY(申请公司名称 ): ____________________________________________________________
NAME OF APPLICANT(申请人姓名 ): Mr / Ms(先生/小姐 )__________________________(Delete as appropriate 删除相应的)
WORK TO BE PERFORMED (所申请的施工类型 ):_____________________________________________________
DURATION OF WORK(施工历时 ): From(从 )______ to(至 )______ (time) Total(共计 ):______ hours
LOCATION OF WORK(施工地点 ) : ________________________________________________________________

NO. OF WORKMEN INVOLVED IN THIS WORKS (人数): _____________________(Refer to page 2 for list of workers 查看第二页工人名单)
This Permit-To-Work (PTW) is valid only for the duration stated above. The conditions of issue must be complied with throughout the duration
of the work; otherwise, this PTW can be withdrawn at anytime. The applicant of this PTW shall be responsible for maintaining a copy of this
permit and must produce it upon request. 这份施工许可证只在以上说明的期限内有效。施工期间必须满足规定的安全工作条件,否则许可证
可以随时撤销。申请者负责保留一份副本并严格按照安全工作程序和要求施工。
SAFETY CONDITIONS TO BE COMPLIED WITH PRIOR TO PERMIT APPROVAL
在施工许可证批准之前必须符合下列安全条件

SAFETY CONDITONS 安全条件 / X / *NA


1. All work activities in the worksite carried out are due regard to the safety and health of persons carrying
out the high-risk construction work in the worksite. 在现场进行的所有建筑工作均应适当考虑在现场进行高
风险建筑工作的人员的安全和健康
2. Relevant safety documents have been submitted to safety department (Method Statement (MS), Safe
Work Procedure (SWP), Risk Assessment (RA), and Emergency Procedure (EP). 相关安全文件已提交给
安全部门(方法声明(MS),安全工作程序(SWP),风险评估(RA)和紧急程序(EP)。
3. All person involves in the work are train and briefed on MS, SWP, RA and EP? 参与工作的所有人都经
过培训并向他们介绍 MS,SWP,RA 和 EP?
4. All persons are informed or brief of the hazards associated with the construction work activities and the
precaution they have to take before commencing of work. 在开始工作之前,应将所有与建筑工作
关的危害以及他们必须采取的预防措施告知或告知所有人
5. Basic PPE of helmet, safety belts / harness, etc are provided. 提供基本安全配备如安全帽/带,等等
*Indicate “NA” against conditions that are not required
Permit Application by Supervisor/ Competent Person of the work group 高空作业检察员/技能人员申请施工许可证
I fully understand the nature of the work and safety conditions that must be met. I have inspected the safety conditions relating to the work
to be performed. 我完全理解了工作的性质和需要满足的安全条件。我已经检查了与工作相关的安全条件。
Name & Signature 姓名和签名 : _________________________ Company 公司 : ___________________________
Date / Time 日期/时间 : ______________________________ Position 职位 : ___________________________

Permit Verification By Respective duty Engineer and duty foreman : 现场区域主管或现场工程师确认许可证 :


Name 姓名 : ______________________________ Signature 签名: _______________________________
Date 日期 : ______________________________ Time 时间 : _____________________________
Permit Verification By WSH Officer / WSH Coordinator /Safety Assessor: 安全官/ 安全评估员/委任的技能人员确认许
可证 :
Name 姓名 :_ . Signature 签名 : _________________________
Date 日期 : ________________________________ Time 时间 : _________________________
Permit Approval By Project Manager /Authorized Work at height Manager 项目经理/委任的高空作业经理批准许可证:
Name 姓名 : _ _____ Signature 签名 : _________________________
Date 日期 : ________________________________ Time 时间 : ________________________

Notification of Works Completion (to be reported by permit applicant) 工作完成的通知(由施工许可申请人报告):

The above mentioned work was completed on 上述施工完成于: _______________________ (date / Time 日期 / 时间 )

Name 姓名 : _________________________ ________ Signature 签名 : ________________________


Revocation of Permit (if any) By Project Manager /Authorized Manager/ WSHO / WSH Assessor 取消施工许可证

Name 姓名 : ________________________________ Signature 签名 : _________________________


Date/Time 日期/时间 : _________________________ Reasons 原因: ________________________
Ch ina Co nstruc tion (So uth Pacif ic) Deve lopm ent C o Pte L td

List of Workmen involved in Works 挖掘工作工人名单


Work Timing

Name of Worker Please indicate a tick only


S/N Start Time End Time if worker had carried out Signature
工人姓名
夜班时间 完工时间 normal day work 备注
白天如有施工请在格里打√
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
EXTG
EXTG BUILDING RANGE
(Phase 1)
EXTG BIN POINT

EXISTING HILL
1:2.5

AB
SL
PC C
TH C/
1:2.5 WI m
0) 4.0 m
20 AT 900m
(1: G 5 x 140mm
AT 4.0m C/CCASCADES
IN m~

BLOCK G4
AIN AT 0m P
TA

CH 13 3.0
DR GR 75

TL 13
. 13 3.7 00
EN AN OM

IL=
300 THK WALL
OP RI FR FROM CBP

6.0 0
) ST IT CH. 156.0m CAPPING
(W DE ES SU BEAM

m
TL 132.90 SAFETY RAILINGWITH TYPE 'B'
1:2.5 0m PE VARI TO

CB 3.8
THROUGHO

13
IL=132.200

P 0m
0.6 D H E CH.99.0m UT

TO
AN PT AD P TL=131.60 CH. 140.0m

EFH 1

P
DE SC TO TL 133.57
CA P 0m IL=130.840
CB 3.0 60 IL=132.840
13 2.1
13
m IL= LL

0.6 AIN
3.5 7 IL=130.660

DR
WA

0m (1:
.16 2.7 10 OF m
P 7 2.6 40
UP

(W 20
CH 13 2.0
TL 13 .11

) 0)
TO 2.8 0.2

CO
IL= 13 CH 13 IL=132.980

Phase 1 Boundary Line


IL=

TA

VE
IL 130.440

RE
65 CASCADES CH.
1.9

AR
89.5

D
13 0mm TL 131. m
IL= 4x17 C/C IL=1 83
30.8 IL=

1:30
N m AT 4.7m 1:25 90

CH 13 4.5
GRAD. 13

D
IO 1.0 0) GR

TL 13
. 12 5.3 75
20 AD. 1.0

IL=
SIT = 0 (15.0m) (15.
(1: .8m 0m) 1:25 CH 70

2.0 0
UN
AN TH .58 .117 .85
TR NG 32 15 AIN TL .

m
CH 130 0 IL= 13 80.0m
LE =1 1.8 DR TL= 130.04

1:
TL 13 0 13 2.0

CH =1 1.0
45
PROP. 1:2.5 MAX. SLOPE

1.1 5
WITH TURFING

30
IL= IL=

IL=
TL 13
. 84 32.2200
BO
60

IL=
20

13 CB
9.8

.0m 5
1:

4.7 P TO0m
12

CH =1 9.0

30
IL

90
TL 12
.13 30.0240

13
IL=
L

5.5
7.8 5

CH 13 4.8
TL 13
m

P
A

. 11 5.5 10
0) m

IL=
20 0
5.8

8.0 1
CH 13
. 1:2

45 TH m
(1: AIN
. 12 60

ON

IL=

WI 4.0
0
m
CH 13 1.5
. 10 0.2
AIN CH 129.4 AD DR

AT

WI 180mC/C
)
GR RED ES 00

TL 13
. 74 2.2 00
DR

0.0 00

IL=

DE m (G
0 IL AD

TI
VE SC 1:2

SU .0. 29.0030

.0m 5
m
60

CH 13 1.9
CH =1 8.5

CO CA D.
CO CA RAD.

TL 13
MM 0m

CH 13 5.3
. 66 2.6 00
TL 12
CH =1 9.8

IL=

TL 13
m (G

VE SC 1:2
CH =1 8.2 =1 8.0

IL=
TL 12

. 10 6.0 20
60

IT
DE

IL=
. 10 31.0200
TL 12 TL 12

.0m 5
WI 180mC/C

IL=

RE AD 00
.15 29.2240 29 40
8.8

NO

IL=

6.0 2
0

RA
7.4 5
12

D ES )
3.8 5
60 TH m

GR 68.0m.02
IL

DR
m

CH =1 1.8
WI 4.0

AD
TL 13

AIN
AT

. 33 00
IL=

. 1:2
IL=
2A

0
RC P
60

CH 00x1 9.0 00 CH. MM 0

.02
TO
8.4

11 12 7.8

5
WA131.9
. 15 00 25
12

TL 12

5
IL TH

IL=
TH

LL 5m
E

8.7 0 SU
WI
WI

m
RB RR
RB 1:

AS
KE PE
KE PE 30
UP m
K2 SCUP
m

60 TH m

CH 13 .50 .4520
K2

CH 13 5.8
MP
SC 6.0
6.0

IL= CH =1332.5
WI 4.0
0

.58 2.3 .0m

TL 13
GH 55 AT
GH 1:

AT

WI 180mC/C

. 94 6.5 30
AT

IL=
HI )x7 30
55 HI )x7

.0m 00

CH 13 6.0
PH

DE
GS

SU 12 8.0
GS

.0m 3

TL 13
1:
17 0(W ININ

TL 12
17 0(W

TL 13

. 90 6.7 00
16 IT

IL=
IL=
CO CA RAD.
IL=

30
25 EN
25 EN

CH =1 8.8
9.3

.0m 0
AIN

m (G
TL 12
OP
OP

VE SC 1:2
9.0 60

. 12 30.0200
m

IL=
DR

CH 13
RE AD 00
1:
AB

IL=
7.4 5
DE 00

.56 2.4
SL

30

D ES )

BO
m
WI . 1:2

DR

.0m 00
SE
PC C 0

2M
IL=
TH C/ 45 AD

AIN
12
WI m GR

75 AIN TH
0) 4.0 m

7.7

0.4 SL ST
IL=
DR NG
m

0x
20 AT 900m

PC DE
75
LE

UN
O

IL=
4.1 00

5m AB RI
80 (1: =10.5

13

PL

PE
(1: G
. 15 8.8 80

2.7
IN m~

0 50 m

12

CH 13 6.2

(W TH
AIN AT 0m

OP

BO 0)
CH 12 7.9

8.4

TL 13 136.6
00

) DR RO GR
. 86 6.9 60
DR GR 75

IL= IL=
X
TL 12

00

AN
EN AN OM

.0m 6
IL=

AIN UG IN
AN
DA
CH MP 900 .825
OP RI FR

TL 12
) ST

SU 0x 33 00
IT

PR

(1: UTG AT
.52 S2
IL=
S2
(W DE ES SU

=1 7.9

90 =1 2.6

CB 6.8
CH =1 2.7
0m PE VARI TO

TIN

20
13

HO
TL 13

.0m
29 80

AT
TL 13

P 0m
IL=

0) AN 6.0
.46 33 20
IL=
.17

TO

20
0.6 D H E

WI D m C/
.0m.65
AN PT AD

RY
5
00

P
AIN

TH
S1
DE SC 7.8 DR

TL 12

G
CA 12 0 0)

BLOCK G1

IL=

CH 13 6.9
11 MP 8.9 55

=1 7.8
1:2.5 IL= 60 20

TL 13
SU 12 7.7
00
(1:

29 73 IL=

. 74 7.6 80
IL=
30 OM TY HO
TL 12

ST
x1

.00

/
11 =1 7.7

FR FE UG
IL=

C
0

.0m 8
00
0

TL 12
00 29 00

SA RO

EX
0

TH CB RA UT
TL 13
0

IL=

TH
10

x1 .00

IL=

K P ILING
=1 2.9
1:

10
0

RIP
WA
75 AIN TH

33 10
0
DR NG
0x

.82

LL
SU
TAP

12
LE
PROP. DROP INLET CHAMBER

85 (1: =16.1

IS
7.7

5
MP

IL=
0 50 m
AT 6.0m C/C

20
BO 0)

13
E

7.3

TI
LIN
CH. 142.1m

40
TL 128.75

GATE 1
IL=127.740
T

N
CH 13 7.7
EN

TL 13
CH =1 8.2

. 62 8.4 00
IL=
1:

TL 12

G
S1

. 54 29.0060

.0m 0
IL=127.560

IL=
30
EM
X

0
600 (W) COVERED

.0m
BO 0)
00 50 m

CH 00x1 9.1 40
1:

1:105
S

11 12 7.6
10 (1: =17.8
30

FE
. 12 10 75
TL 12
BA
0x

DRAIN (1:200)

IL=
75 AIN TH

1.5 0 SU

IL=
DR NG

13
45 RA
T1

60 RA
LE

(G

8.0
(G

0 D.
0 D.

NC
WI 1:2
85 HI m
WI 1:2

60
MP

45 RA

VE 6.0
K

0x CU

DE 00
DE 00
(G
0 D.

AT

55 LA
SU .0. 29.1750
OC

WI 1:2

CO )
CO )
CH =1 8.6

0
MM 0m 5

DE 50

HI R GR
TL 12

CB 9.4 .0m
VE
VE
P

IL=
BL

NG

13 . 50 2
IT
60

P 0m
IN
CO )
S7

RE
30 TA

RE

CH 13 8.4
CH. 130.1m 7.6

TO
ED ATIN
1:

TL 13
VE

D
D
TL 128.65 12

IL=

P
IL

DR
DR
RE
IL=127.500

G
9.1 20
AI

AIN
D

G
N
DR
30
1:

AIN
IL=127.320

CH 13 8.6
TL 13
GRAD. 1:20

CH =1 8.5

. 47 9.3 00
IL=
TL 12
. 20 29.1770
750 WIDE COVERED

IL=

.0m 0
DRAIN (1:500)

.3m 5

IL=

0.4 SL ST
13

PC DE
8.5

5m AB RI
PE
EXISTING

85

(W TH
CH.106.1m
MK14-01776A

) DR RO GR
CH. 118.1m TL=129.175

CH =1 2.9
FLAG

TL 12

AIN UG IN
AN
45 RA

TL 13
TL 128.05 IL=127.610

IL=

.0. 33.65 50
=1 8.4

(G

IL=
0 D.

(1: UTG AT
IL=126.900

0m
29 50

WI 1:2

20
HO
.00

AT
DE 50

30 OM TY HO

0) AN 6.0
POLES

FR FE UG
0

WI D m C/
CO )
0.60m(W) OPEN DRAIN (1:200) WITH PC SLAB

SA RO

TH CB RA UT

TH
IL=126.720

TH
VE

K P ILING
(Phase 1)

RE

WA
1:30

AND PEDESTRIAN GRATING AT 4.0m C/C

LL
DEPTH VARIES FROM 750mm~900mm

DR

C
AIN
TL=122.875
1:30

SU .0. 33.6580
IL=122.525

CH =1 2.9
MM 0m 0
MANHOLE/GIS ID

TL 13
IC-A-22

IL=
CH =1 8.3

IT
TL 112.800 CH.100.0m

EXISTING

TL 12

SU .0. 33.8275
. 39 29.0075
TL=129.175

IL=
1817965

CH =1 3.1
IL 110.860

MM 0m 5
TR NG
IL=127.595

TL 13
.3m
EXTG Ø250 VCP

LE
D 1.94m

IL=

IT
AN TH
20m (1:120) 175 HIGH K2 KERB WITH
CH. 110.1m

BLOCK F1

SIT =1
CASCADE TO SUIT
250(W)x75 SCUPPER 30
Ø1 IL=126.320

Phase 1 Boundary Line


SECURITY 1:

IO .0m
OPENINGS AT 6.0m

N
17 50 IC T2-18 30

GRAD. 1:20
IC T2-22 IC T2-21 IC T2-20 IC T2-19 IC T2-17 1:

IL=
.8m HD TL 117.520

12
POST

17 LS
TL 119.350

8.2

60 RA
(1 DIP

FA
TL 114.300 TL 116.222

5m ED
TL 113.580 TL 114.300

(G
0 D.
25

m KE
IL 115.875

WI 1:2
:80

HI RB
IL 116.542

DE 50
IL 112.519 IL 113.019

GH
) IL 111.519 IL 112.019

CO )
D=1.645m CH. 98.1m

RC
CH. 65.3m

VE
GATE 3 Ø150 HDDIP D=2.061m Ø150 HDDIP D=2.281m Ø150 HDDIP D=1.781m Ø150 HDDIP D=3.203m Ø150 HDDIP D=2.808m TL 127.05 TL=122.700

RE
Ø150 HDDIP IL=125.900

60 RA IN
IL=122.310

(G AT
0 D. GS
DR

GR

WI 1:2 AT
35.0m(1:80) 40.0m(1:80) 40.0m(1:80) 40.0m(1:80) 40.0m(1:70) 40.0m(1:60)

AIN

DE 00
IL=125.720
IL 111.082

IC T2-23
D=2.318m

TL 113.400

CO ) WI m
TAP

VE TK C/
CH =1 8.1

RE VE C
BD IL 115.303
Ø150

TL 12

CB 9.4
5.2
. 59 29.0045
31.96

IL=

13
D HI
600 WIDE COVERED DRAIN

P 0m
DR CU
.9m 0

CH =1 2.7
AT 4.0m C/C (GRAD. 1:200)

TO
WITH 180mm CASCADES

TL 13
AI LA

.44 33.6530
CH. 90.1m
HDDI

P
m (1:76

IL=
N

.0m
TL 126.65

CH =1 2.8
TL 13
IL=125.500

.35 33.8200
IL=
p

R
CH =1 8.1

.6m 5

SU . 0.0 9.3 40
EXISTING
)

TL 12

CH 13 8.8
. 65 29.1720
IL=

MM m 0
TL 13
.9m 5

IL=
IL=
IL=125.320

IT
13
BUILDING
BLOCK T1 & T2

2.7
10

0.4 SL ST
TO ITB LEVEL 1M BELOW
CH.75.0m

PC DE
CH 13

5m AB RI
TL=129.175

CH =1 2.5

PE
IL=
Ø150 HDDIP
ELE

TL 13

. 60 2.1
38.3m(1:80)
IL=127.545

(W TH
.48 33.4530
1:30

IL=
DROP

GR

) DR RO GR
.0m10
.0m
PIT

AD
TEL

AIN UG IN
AN
. 1:2
MH SUMMIT
CH. 78.1m 0.0 IT

(1: UTG AT
IC-A-21

0
CH.44.0m

IL=
CH MM -1 75

20
TL 126.05

45 TH m

HO
AT
TL 113.100 TL=122.875 SU 1-0 9.1 00

13

WI 4.0

0) AN 6.0
0
IL=124.900

AT
DS 12 8.7

WI 180m C
2.6

WI D m C/
IL 111.280 IL=122.110
TL 12

DE m (G

TH
20
D 1.82m IL

60 RA

CO CA D.
C/
(G
0 D.
IL=124.720

VE SC 1:2
750 WIDE COVERED

WI 1:2
P

RE AD 00
DE 50
DRAIN (1:500)

C
CH 13 1.5
MK14-01779X DI

RA

TL 13
D ES )
CH =1 2.0
HD :80)

. 72 2.2 10
CO )

IL=
DR
TL 13
.51 33.0200
50 m(1

IL=
BLOCK

VE

.0m 5
AIN
17 0(W IN
.6m 5
RE
Ø1 .0

25 EN
5
CH. 70.1m

OP

HI )x7
45 MP

GRAD. 1:20

D
m

GH 5 AT
SU

DR
IL=124.500
0.0 0

AIN
CH 0x60 -2 75

K2 UP6.0
60 TH m

GS
WI 4.0

SC
0

KE PEm
60 1-0 9.1 70

AT

WI 180mC/C
.1m 75 DS 12 8.2 P

RB R
17 9.1 TA

DE m (G
IL=124.300 TL 12

GR
Ø150 HDDIP

CH 12 8.200
26.4m (1:80)

WI

IL=
75 IL

CO CA D.

AD
TH
TL 12 1-A 9.1

F2

13
TL=125.50

CH =1 8.0
DS 12 8.800

. 1:2
VE SC 1:2
IL
EXISTING SUBSTATION

8000

1.3
TL 12
IL=124.400

. 95 29.1700
450 WIDE 0PEN TL 12

IL=

RE AD 00

IL=
10
0
RA
IL

IC 12
DRAIN (1:250)

.9m 5

D ES )
MP

13
CH. 65.1m

TL

DR
75

T2 9.00
.4m SU

1.0
2000x1100 SUMP 17 0 1-A 9.1

AIN
DS 12 8.775

-1
IL 2.73

60
TL 125.40 CH 0x75 -3 75
IC T2-16

0 0
D=
12
75 1-0 9.1 00 TL 12

SLOPE TO FALL
IL=124.180

CH =1 1.1
IL

CH =1 1.2
6. 9m
(Phase 1)
DS 12 8.1

TL 13
TL 13
26

.76 32.0500
IL=
TL 119.000 TL 12

.67 32.2200
IL=
CH.50.0m

.0m
IL

.6m 5
CH MM 9.1 00
CH. 58.1m TL=129.175

SU 12 8.7

CH 13 0.8
.4m AIN

0.0 IT 75
TL 12
IL 117.021 23 75

TL 13
TL=125.05 IL=127.495 75 75

. 84 1.8 80
IL
DR 1-A 9.1 00

IL=
1-A 9.1

CH 13 0.9
m
CH 3-1 9.1 75
IL=123.970 DS 12 8.775 DS 12 8.8

TL 13

.0m 15
. 75 1.9 80
DQ 12 8.0

IL=
600 (W) BOX DRAIN (1:250)
TL 12 TL 12
D=1.979m

900 WIDE COVERED DRAIN


TL 12

900 WIDE COVERED DRAIN

.6m 9
IL IL

EXISTING TACTICAL

AT 4.0m C/C (GRAD. 1:200)


IL

AT 4.0m C/C (GRAD. 1:200)


IL=123.790

WITH 180mm CASCADES

CH 13 0.8
WITH 180mm CASCADES

TL 13 AD. )
. 92 1.7 40
IL= GR .5m
IL=
75
1-A 9.1

.0m 8
13
IC-A-20 DS 12 8.775

1.0
1:30

BLOCK S1
TL 114.067 TL 12

20

(20
IL 111.610 IL

MANEUVERING AREA

1:3
175 HIGH K2 KERB WITH

CH 0m
CH 128.6
D 2.457m

12
IL.

IL=1

4
250(W)x75 SCUPPER

. 96 m CA
SIZE:700x900

10 55
.8m
OPENINGS AT 6.0m 1:30

GRAD. 1:20

.0m SC
75 AIN 75

30.8
CH 12 7.8
MK14-01776A 1-A 9.1 DR 1-A 9.1 00
Ø150 HDDIP

TL 12
DS 12 8.775

. 12 9.1 95
DS 12 8.8

IL=
CH. 99.7m

00
TB IL:113.179
13m (1:80)

CH. 46.1m TL 12 TL 12

3.6 75

AD
TL=124.45 IL IL TL131.60

CB 9.7
m

13
IL=123.370 IL=130.680

P 0m
1:30 1:30 CH. 85.1m

33.9 HDDIP

TO
Ø15
Ø150 HDDIP
75 TL 131.625

38.3m(1:80)

P
450 WIDE DRAIN (1:200) 1-A 9.1
DS 12 8.775 IL=130.540 1:30

m(1

CH 13 8.7
0
WITH VEHICULAR GRATING

CH 00 29 70

TL 13
IL=123.190 TL 12

. 56 9.6 00
11 =1 7.6

IL=
. 17x100 .17
:80)
IL IL=130.500

TL 12
750 WIDE COVERED IL=130.360
UP

.0m 0
S1

IL=

8.5 0 SU
IC-A-23

CH 128.6
DRAIN (1:500)

IL=
IC-A-19

m
IL.
IL 128.650

DQ3-B
DRAIN
TL 114.067

TL 129.175
CH 40.3m

22 05

12
TL 114.067 CH. 38.1m TL=122.675 .2m CH. 91.6m
IL 113.267 DQ3-1 75 49 -2 75

.8m

7.7

5
TL=124.05 IL=122.050 1-A 9.1 AIN 75 ) 0) TL 131.375

MP
IL 111.772 IL=121.950 1-1
TL 129.175 DS 12 8.775 (D 50

20
D 0.800m CH.25.0m DR 1-A 9.1 00 CH DS 9.1 05

CASCADES 150mm
WITH 2 NOS
0.45m (W)
IL=122.970 CH. 15.2m DS 12 8.8 00 (1: IL=130.330 CH.

600 (W) BOX DRAIN (1:250)


D 2.295m TL=129.175 IL 128.005 TL 12 T 12 8.5 10 T
TL=122.50 TL 12 TL 12 TL= 111.0m
SIZE:700x900 IL=127.445 IL ) x ER m
IL=121.400 IL IL (W LV 7.5 IL=13131.20
450 DRAIN (1:250) 0 CU =1 0.440
Ø150

IL=122.790

75 RA
7.1m

30

PUDDLE FLANGES
PIPE (SA) C/W
90 X TH

Ø150 CAST-IN
TAP

(G
IL=130.150

0 D.
CH. 32.8m 75 BO NG 1:

DRAIN (1:200)
MK14-01774P

WI 1:5

TO SUIT
LE
Existing 1350x1100 SUMP IL=123.500 1-A 9.1

DE 00
TL 123.90
IL=121.920 CH.0.0m DS 12 8.775 1:3
GATE 4 700x700 SUMP TL 12

CO )
IL=121.400 IL=122.000 IL 30 .8m 0
Bin 600 DRAIN TL 122.675 1: 106

VE
IL=121.350 CH. 130.625 1:3

CH 128.5
CH. 80.5m

RE
IL=121.980 40 0

IL.
1350x2000 SUMP IL=121.350 IC T2-11 TL= 29.3

D
IL=130

TAP
34 60
Centre AIN 75 m

GR
(20 .
IL=1 .300

DR
IN

.8m
TL 123.73 TL 122.815 75 DR 1-A 9.1 00 6.0 30

EXISTING ROAD

Ø2 6.0
IC-A-18

.5m 1:3 13
AD
1-A 9.1 DRA

AIN
DS 12 8.8

AT
IC
IL=119.650 .19 7.6

IL 128.650

DQ3-B
DRAIN
DS 12 8.775

TL 129.175

IL 128.800

50
DQ3-A
DRAIN
IL 120.096

TL 129.175
TH
TL 114.067 NEW WATER PIPES FROM TOP TO BOTTOM SUMMIT DETENTION TANK 3 CH 55.8m TL 12 ED ES

) 4
TL 9.005.83
CH 12
IC T2-15

T2
VER CAD 0)

uP C/
Ø150mm POTABLE WATER PIPE TL 12

TPA
TL 123.70

12 12 163m
D=2.719m DQ3-1 IL IL= CH. 119.0m
IL 111.861 BELOW E CO CASAD. 1:20 CBP TOP

m
-1

VC C
CH 128.5
IL

IL=
Ø200mm FIRE SPRINKLER PIPE

IL 3.
IL 122.760 (600 DRAIN) TL 129.175 TL= 131.03

IL.
D

1
D 2.206m 139.0m
IC T2-14 WID mm

FOO

D=
Ø150mm NEWATER PIPE 600 H 180C/C (GR m
IC T2-13

PIP
IL=130.260

47 10
TL 119.000 IL 127.945 RE

0.0
SIZE:700x900 900(W) BOX DRAIN TOP=122.50 CH. 8.0m 99.6

0 7

.4m
)

VE CH. 131.025

ES
(1:80.4

.8m WIT 4.0m N

80
(SAME DETAIL AS IL=120.100 TL 122.95 69 20 0) 40 AI
HDDIP

) CO 50

CH 12 8.510 MP
TL 121.200 AT

. 1:17.5
MP TL= 29.7
IL 117.500 TL 121.800 IL=122.460 CH 128.4SU

TL 12
CH. 72.0m BOX CULVERT) OUTLET (W (1: DR IL=130.120

47 9.1
IL 600
0 IL=1 0

75 1-2 9.1 00
IL 0
1
IC BELOW
T2-12 450 OPEN DRAIN 45

.4m 75
BOX DRAIN 90 AIN

DS 12 8.2
60

0x -2 75
IL 118.166
21.72m

0x -3 75

TL 12
WITH 210mm
IL 118.832 DR

1:3
TOP 121.12
D=1.500m TL 122.000 CH 68.8m

GRAD

IL
Ø150

CH. 36.0m HDDIP 60 1-1 9.1 20 .7m


TL=120.58 Phase 1CH.Boundary
900x750 CHAMBER Line IL 119.620IL 119.498 Ø150 (1:60) AT 4.0m C/C DQ3-1 DS 12 8.3 126
CH. 130.85

SU
MP 20

0
DISCHARGED POINT IL=119.330 CH. 0.0m CH. 54.0m TL 12 m
D=3.034m 48.0m 35.9m TL 129.175 00

IL
28.9
D=2.968m 0.9 SU
GRA

BLOCK Q3
FROM BOX DRAIN D=2.502m IL
FROM DETENTION Ø150 HDDIP (EXTG INVERT LEVEL
Ø150 HDDIP
DRAIN/FOOTPATH CH. 18.0m
Ø150BOX HDDIP BOX DRAIN BELOW IL=1 TL= 29.9

12
BOX DRAIN BOX DRAIN DRAIN IL 127.890 m . 14 00 5
D.

1:3
TOP SLAB 1:20
TO BE CONFIRMED) TL 121.06 160mm CASCADE
3 IL=1

8.3
TOP 120.58 SILT TRAP 0.0 80
TANK TO EXISTING DRAIN/FOOTPATH TOP 120.945 TOP 121.00 TL 122.06 TOP 121.04
(600 DRAIN) .22 7.5 CH 00x1129.0200 .8m

05
IL 119.380 IL 119.560 30 134 .8m
40.0m(1:60)

0
40.0m(1:60) TOP 121.31
40.0m(1:60) 11 =1 7.8 CH. 129.225

CH 12 8.170
IL 119.445 IL 119.540 CH 12 118
SUMP IL 119.500 BOX DRAIN 1: CH. 130.025

TL 12
(PROP) IL 119.440 TL 12 40 .7m
S5 (BELOW FOOTPATH) CH. 16.0m IL=

55 9.1
IL
TOP 121.15 CH 68.8m IL= TL= 27.9 40 146

BLOCK S2
CH.268.2m TL= 28.7 CH. 129.85

.6m 75
TL 123.40 IL=1 H

BLOCK G3
600 DRAIN/FOOTPATH IL=122.920 DQ3-1 1350x1000 SUMP IL=1 80 80 WIT
900 (W) COVERED 30
PROP. 900(W) BOX IL 121.260 SUMMIT IL 121.620 SUMMIT
TL 123.28
ABOVE
123.48
4 DRAIN (1:500)
TL 129.175
IL 127.890
TL 129.175
IL=127.380
1:
20 IN
TL= 29.0
IL=1 IL=1
28.6
IN
00)
(1:2 T AND
C/C
OU AT 6.0m~75
0mm

TAP
EXTG DRAIN/FOOTPATH 900x750 ACCESS IL 122.380 CH. 281.4m SILT TRAP CH. 242.2m 28.1 DRA DRAOUGH G mm
DRAIN (1:300) BELOW (600 DRAIN) IL 121.460 (600 DRAIN) TL 123.05 IL=127.400 IL=127.445 ED ES .8m
EXTG 1200x1000
TO REMAIN TO FOOTPATH
(600 DRAIN)
(600 DRAIN)
SUMMIT IL=127.300 IL=127.360 IL=127.430 900 (W) COVERED TL 129.175 IL=1 VER CAD 0) 134 00 m (W) THR GRATINM 600
1500 WIDE FOOTPATH IL 122.010
E CO CASAD. 1:20 0.45 SLAB RIAN
2 123.740
EXISTING 5.1M DRAINAGE RESERVE
IC-A-17 LEVEL 160mm CH. 66.0m CH. 28.5 FRO
SUMP
2
123.220 (600 DRAIN) CH. 24.0m DRAIN (1:500) IL 127.485 CH. 220.0m
10 IES

EXISTING 5.1M DRAINAGE RESERVE


TL 115.450 CH. 167.0m CH. 149.0m CH. 131.0m CH. 113.0m CH. 100.0m CH. 76.0m CH. 40.0m CASCADE PROP. 1000x850 CHAMBER 1100x1100 SUMP WID mm IL=1 PC EST
TL 115.786 CH. 261.5m PROP. 450 COVERED TL 118.125 CH. 158.0m TL 118.47 CH. 140.0m TL 118.815 CH. 122.0m TL 119.160 TL 119.49 TL 119.97 TL 120.93 CH. 52.0m TL 121.89
CH. 28.0m
(TYP)
CH. 16.0m CH. 4.0m TL 123.85 S17 27.9 600 H 180C/C (GR PED TH VAR
IL 112.131 CH. 202.9m TL 120.45 TL 122.37 TL 122.85 TL 123.33 WITH ALUMINIUM RUNGS TL 129.175 IL=1
EXTG. 0.75 IL 112.610 1100x1100 SUMP S4 PROP. 750 DRAIN CUM CH. 220.9m DRAIN (1:150) IL117.185 IL117.365 IL117.545 IL117.725 IL117.905 IL118.085 IL118.265 IL118.620 IL119.100 IL120.060 TL 121.41 IL121.020 IL=123.170 50 WIT 4.0m DEP

PROPOSED PHASE 2A NOTIONAL BOUNDARY


1100x1100 SUMP S1 IL119.580 IL121.500 IL121.980 IL122.460 & PEDESTRIAN GRATING
D 3.319m
(W)x900(D) BOX TL 116.145 1.5m FOOTPATH (1:150) 1100x1100 SUMP S2 IL 115.730 TL 117.350
PROP. 600 DRAIN CUM CH. 186.2m
IL116.935
IL120.540 12 900 (W)x1100 BOX IL 127.530
P.750
(w)x8 AT
1.5m FOOTPATH (1:150) PRO RNAL) 60
CULVERT
EXTG 1200x1000 SUMP
IL 115.260
PROP. 750 (W) BOX
TL 117.000
IL 115.680
IL 115.850
IL 116.020
3.7 1350x1350 SUMP
DRAIN (1:500)
LENGTH=15.0m (INTE CULVERT) IL=1
27.9
28.9
00
SUMP TL 129.175
TL 115.929 SUMP DR4-1-6 DR4-1-7 CULVERT (1:250) 50SUMMIT BOX D. 1:300 .7m IL=1
Ø1
16. 50 HD
IL 113.290
(TO BE CONFIRMED)
TL 116.260
IL 115.450
TL 116.290
IL117.425 IL117.785 IL118.145 IL118.965 IL120.405 IL121.845
4 CH. 44.1m
IL=127.200
CH. 0.00m
CH. 229.4m
TL 129.175
(GRA TH=8
LENG 167.7m
.5m
P
158
CH. 129.2500
TL 28.3

IL
0m IL 115.245 TL 123.75 CH. x800 SUM
(1:8DIP
EFH 2 DR4-1-5 DRAIN DR1-1-6
3 IL=127.150 IL 127.510 65

12
IL=1

TAP
IL 115.310 IL 115.430 CH. 238.9m EXTG DRAIN IL=122.720 5 8.0 1100 128.95

8.4
0) TL 116.190 450 DRAIN 600 CULVERT TL 116.400
IL 116.700 CH. 190.6m IL117.065 PROP. 600 BOX DRAIN PROP. 600 BOX DRAIN TL 119.33 PROP. 600 BOX DRAIN PROP. 600 BOX DRAIN CH.0.0m 12 MP
IL 115.547 IL 115.380 TL 116.620 CH.196.7m TO REMAIN 8.6 TL= 27.850

30
IL 115.650 IL 116.900 CH.171.8m GRAD. 1:300 CH.141.8m GRAD. 1:300 CH.111.8m IL118.325 CH.81.8m GRAD. 1:300 CH.51.8m CH.21.8m GRAD. 1:300 SUMP DR1-1-2 DR1-1-1 12 00 IL SU
T/B IL 113.413 116.340 TL 117.150 TL 117.150 TL 117.150 TL 117.150 TL 117.150 TL 117.150 TL 117.150 TL 117.150 = 7.7 0
70 m IL=1
116.190 CH. 248.9m IL 115.560 TL 117.150 TL 12 20
IL 116.040 850x700 PEDESTRAIN 0x

DETENTION TANK 2
IL 116.130 IL 116.230 850x700 PEDESTRAIN IL 116.330 IL 116.430 IL 116.530 IL 116.630 IL 116.750 IL= 90 . 0.0 7.7

RC FLAT ROOF 1 BLOCK G2


IL 115.600 IL 115.400 1100x1100 SUMP S3 IL 116.700 CH. 36.0m
0.450m Ø RC

1:
IL 115.750 GRATING AT 6.0m C/C GRATING AT 6.0m C/C IL 121.615 CH 12 TOP
PIPE (H. D.)

200mm

30
SUMP DR4-1-6 TL 116.420 300 (W) DRAIN m CBP .2m
IL= 90

IL=122.000
IC-A-17A TL 116.260 IL 115.360 (1:200) CASCADES . 0.0 8.9 70 134

BLOCK Q2
450 CASCADED DRAIN CH 12 8.0
TL 115.450 WITH HEAVY DUTY GRATING IL 115.745 CH. 273.1m
CH 13.2m TL 12
IL 113.600 DR1-DT1 CH 0.0m PROP. 600(W) ROADSIDE
Ø150 HDDIP

IL=
24.3m (1:77)

DR1-6-2 DR1-6-1
GRAD. 1:18

BUS
D 1.20m OUTLET INLET DRAIN/1500(W) FOOTPATH
T1 4 Nos 180mm
CASCADES
AT 3.0m C/C
IL 113.530
V
TL 116.530
IL 115.210
TL 122.180
IL 121.540
TL 122.180
IL 121.680
(1:200) TO REPLACE EXTG
OPEN DRAIN
NEW Ø250 12
8.6
15

SCUPPER IL
GRAD. 1:150 70
PIPES
V

7.4 70
12 7.7
LOADING & IL 12

PARKING
DR3-0-1 PROPOSE WATER PIPES CH. 28.0m IL
DR4-1-2 TL 117.175 DRAINAGE RESERVE - LEFT TO RIGHT
OVER-CROSS UNLOADING BAY 200mm

BLOCK R1
IL 117.825

CH =1 8.0
TL 117.000 Ø150mm NEWATER PIPE 8000
117.000 CASCADES

TL 12
117.150

. 14 28.87 00
IL=
IL 116.550 Ø200mm FIRE SPRINKLER PIPE 175 HIGH K2 KERB WITH 70

.0
Ø150mm POTABLE WATER PIPE 250(W)x75 SCUPPER 6.9

123.050
Roof
IL=122.200 DISCHARGE POINT 12

BLOCK Q4
OPENINGS AT 6.0m FOR DETENTION TANK 2 IL
IL 115.630 DETENTION TANK 1 5100 AIN
TO RC SUMP .0m 5

CH =1 7.7
TAP DR

SHED-P1
IL=103.530 DR. RESERVE . 26 8.1 D ES )

TL 12
. 18 28.65 50
IC-A-16 CH 12 7.250 RE AD 00

IL=
MK14-01776A DRAIN DR1
Ø150 HDDIP

VE SC 1:2

.0m
34.5m (1:70)

TL 115.450 SUMMIT PROPOSED ELECTRICAL TL 12

BLOCK Q1
70 IL CO CA RAD.
IL 112.447
ROOF ROOF TL 117.300 UNDER-CROSSING
PIPES DRAINAGE RESERVE m (G

0.4 MO IN 1:2
6.4 DE

RE AT .
D 3.003m IL 116.900 4 ROWS 3 NOS. Ø110mm ELV PIPES 12 WI 230mC/C

5m VA G 00
GR AD
SIZE:1050Ø IL 0
GRAD. 1:150 CH.20.0m

GR

(W BL 60
60 TH m
.0m WI 4.0
(BELOW) (BELOW)

) OP E
1100x1000 SUMP
V

TL 122.95 . 42 27.1550 AT

EN SL MM
AT
129.23 CH =1 6.2

PC 00
IL=121.300 TL 12

DR AB IN
.5m 5
IL=

AI AN TERV
.27 7.1
CH 12 5.970

EXISTING BUILDING

N
W D AL
TL 12

ITH
CH 39.8m PROP.750 (W) .5m 5 IL
SUMP .43 6.1
DR1-6-3 BOX DRAIN CH 12 4.970
T2 DR2-1-6
TL 117.175
600x600 SUMP IL 121.410 IL 121.550 CUM FOOTPATH TL 12 AIN

C/
TL 122.180 (GRAD. 1:200) IL DR

(Phase 1)

C
SUMMIT DR4-1-1 IL 115.550 EXTG DRAIN 70 D ES )
IL 121.370 TO REMAIN 5.4 RE AD 00
TL 117.000 117.000 PROP 450 DRAIN 12 VE SC 1:2
IL 116.700 117.15 (GRAD 1:200) IL CO CA D. 30
33.13m (1:77)

DETENTION TANK CH.0.0m CH 26.6m m (G RA 6.0


Ø150 HDDIP

117.150 850x700 PEDESTRAIN IL 121.410 DE


INLET IL 115.600 CH.201.6m CH.171.6m CH.141.6m 117.150 CH.111.6m CH.81.6m CH.51.6m 117.150 CH.21.6m SUMP DR1-2-2 DR1-2-1 WI 230mC/C 12
DR2-DT1 TL 117.150 TL 117.150 TL 117.150
GRATING AT 6.0m C/C
TL 117.150 TL 117.150 TL 117.150 850x700 PEDESTRAIN TL 117.150 TL 117.150
EFH 7 TL 117.150
TL 122.180
CH.50.
6m 0 IL

S15
PROP. 600 BOX DRAIN TL 117.150 IL 121.475 60 TH m
TL 117.150 IL 115.960 IL 116.030 IL 116.130 IL 116.230 IL 116.330 PROP. 600 BOX DRAIN IL 116.430 GRATING AT 6.0m C/C IL 116.530 PROP. 600 BOX DRAIN IL 116.630 IL 116.750 TL 125.750
IL 115.510 IL 116.700 CH 46.0m WI 4.0
GRAD. 1:300 GRAD. 1:300 GRAD. 1:300 PROP.750x1050 IL 124.71 AT
IL 121.340 BOX CULVERT
IC-A-17B IC-A-12B

TL 125.0
TL 117.350
COVERED (GRAD. 1:200) .0m

IL
TL 117.075 . 58 26.1550

12 50
IL 116.25 CH.223.7m

5.5
IL 115.443 CH.36.6m CH. 0.0m CH =1 5.2

EXISTING
D 1.10m SUMP DR1-2-3

75
D 1.632m DR2-2-2 CH.0.0m IC-A-5 IL=121.200 CH. 70.0m TL 12
SIZE:700x900
LINKWAY TL 117.150 EXTG 750(W) DRAIN / CH. 94.0m CH. 82.0m TL 125.11 CH.54.0m IL= MK14-01388T
PROPOSED PHASE 2A NOTIONAL BOUNDARY
TL 119.100 SUMMIT DR2-0-1 TL 120.940 TL 124.665 IL 124.020

1:30
IL 115.940 TL 119.000 EXTG. IL119.630 CH. 137.0m CH. 98.0m CH. 61.0m CH.0.0m FOOTPATH TO REMAIN TL 123.33 TL 124.00 TL 125.575
IL 118.555 CH. 110.0m
IL 118.312 CH. 86.0m CH. 73.0m CH. 37.0m IL120.900 CH. 32.4m CH. 14.0m IL 123.560

450 DRAIN

45 TH ING
(TO BE CONFIRMED TL. 121.06 CH. 122.0m TL. 121.055 IL120.500 CH. 49.0m PROP 450 COVERED DRAIN 1200x900 SUMP IL 122.410 IL 123.100 IL 124.480
IL 118.700 TL. 121.085 TL. 121.065 1500x900 SUMP

WI AT
TL. 121.32 IL120.780 TL 122.10 TL 122.19 IL=

0
ON SITE) IL119.875 IL119.975 D 2.628m IL120.135 IL120.380 TL 121.67

GR
IL120.055 IL120.215 (1:150) ABOVE CBP WALL TL 122.440 IL=121.200 125

DR VEHI
IL120.300 IL120.580 IL120.700 IL120.935 IL121.055 TL 122.190 TA

G
CAPPING BEAM IL 121.300 GRAD. 1:20 450 DRAIN WITH CH. 3.5m .02 P

AIN CU
EXTG. SUMP

1:30
PROP 450 COVERED DRAIN IL 121.150 0
0.6m WIDE BOX DRAIN

CH. 141.0m PROP 450 COVERED DRAIN EXTG. 750(W)x900(D) 150mm CASCADES 175 HIGH K2 KERB WITH TL 125.275
TL 122.70

EXISTING 5.1M DRAINAGE


(1:150) ABOVE CBP WALL

(1: LA
TRC
IL 118.455 IL119.850 (1:150) ABOVE CBP WALL BOX DRAIN 250(W)x75 SCUPPER IL=124.650

IN
IL 120.955 AT 3.0m C/C

15 R
117.15 CAPPING BEAM
Ø1 CAPPING BEAM OPENINGS AT 6.0m

0)
EXTG TACTICAL 117.150 EXTG. 900 COVERED

0
IL=123.880
FALL

12 50 TOP OF EXTG. SUMP

24.77
BLOCK R2
FALL DRAIN/FOOTPATH .94 HD

NC
IC-A-4 TO BE LOWERED TO SUMMIT
(1: DIP

RANGE COMPLEX TO REMAIN m DI AIN


RC FLAT ROOF
D

(1: P MATCH ROAD LEVEL


)

TL 121.015 DR IL=124.670

IL=1
50
.9m HD

EXT'G SILT 50 & PROVIDE HEAVY DUTY 0 CH. 0.0m


(TRC) ) IL 118.377 30 CH.47.0m
(1:300)

INTERCEPTOR
HE

13 50

COVER IL=122.020

TL=1 66.0m
D 2.638m IL=122.180

IL=1 25.75
20
Ø1

FE
(3 COMPARTMENTS) CH. 137.3m

24.5
700x700 SUMP 1100x1000 SUMP CH. 100.9m
117.15

AIN
CH.
IC-A-15 IC-A-12A TL 122.875 TL 125.90 900x750 ACCESS 1100x1000 SUMP IL=124.120
Ø150 HDDIP CH. 12.0m

DR
TL 115.450 TL 117.350 IL 122.000 IL=123.830 TL 125.70
S

CHAMBER
IL 116.122 5.1m (1:80) TL 122.30

D
IL 112.877 PROP.750(W)x1200 IL=124.070

NG
RE
IC-TR2-2 IL 122.080

BLOCK H1 & H2
D 2.573m D 1.228m IC-TR2-1 BOX DRAIN

00 VE
TL 117.525 SILT SUMP
TG

SIZE:1050Ø SIZE:700x900 Ø1 TURF TO MATCH (GRAD. 1:200)

1:2 CO
RESERVE
TL 117.525 IL 116.246 27 50

)
IL 116.225 TL 118.630 750(W)x1200 BOX DRAIN
.32 HD EXISTING SLOPE

RA DE
D 1.279m IL 116.180 IC-A-6 (GRAD. 1:200)

TI
D 1.300m m DI

(G 0 WI
SIZE:700x900 HINGED HEAVY DUTY (1: P IC-A-2 L=14.6m

D.
D 2.450m TL 121.184 VEHICULAR
EFH 6 PROP.900(W)x1200

4.4 .75
SIZE:700x900 GRATING 50 TL 121.150

60
20
IL 117.850
EX

mm
IL 118.375 ) GRATING

EXISTING BUILDING
BOX DRAIN

~7 C
12 25

IS
m m C/
CH.45.0m IL 119.337

OM G AN TH
D 3.334m IL 123.750

IL= =1
SUMP DR2-1-4 CH.19.7m

50
IL 115.855 (GRAD. 1:200) 250mm

60 AT 6.0D
FR ATIN UT WI
DR2-1-3

TL
TL 119.100 DR2-1-3 DR2-1-2 D 1.813m CH. 159.6m SUMMIT
TL 119.100 CASCADE

HO 0)
IL 116.650 IL 118.375 TL 119.000 1350x1350 SUMP CH. 151.6m D=550mm

EX
T.B. 119.495

RI GR UG (1:20
IC-TF-3

0m
Ø150 HDDIP

IL 118.415 TAP 1350x1000 SUMP


16.5m (1:72)

(1: P

IC-A-11 IL 118.620 TL 125.60 IL 123.650 450 DRAIN


)

TL 121.625
m DI
50

(Phase 1)
TOP 125.90

H RI ROAIN
TL 118.025 CH.273.0m IL=123.250
.54 HD

IL 118.520 IL 120.513 IL 123.700


IC-TF-4

PT ST TH DR
PROP.900(W)x1200
IL 114.901
UP
ING

D 1.112m
Ø150 HDDIP

SUMP DR2-1-5
20 50
12.5m (1:80)

D 3.124m CH.248.8m IL 116.500 TL 121.445 BOX DRAIN

DE DE AB )
BD IL 115.965

VA AN
ES
IL 115.750
Ø1

PE SL (W
TL 117.325 SUMP DR1-1-4
EFH 3 SIZE:1050Ø IL 115.725 IL 119.770 (GRAD. 1:200)

/
IL 118.560

PC 5m
TL 118.675 Ø150 HDDIP CH. 86.3m
D 1.675m

0.4
IL 115.830 900x900 ACCESS 1100x900 SUMP

NE
UP

IL 128.700

DF1-0-1
DRAIN SUMMIT
0.45m WIDE BOX

TL 129.175
3.5m (1:80)
CULVERT DRAIN Ø150 HDDIP IC-TF-1 CHAMBER TL 125.70
Ø150 HDDIP
EXISTING 5.1M DRAINAGE RESERVE EXTG
ILD

5.20m (1:90) IC-A-3 TL 121.625 600(W) BOX DRAIN IL=124.200


B/D IL 118.505 4.1m (1:30) SUMP
TL 121.055 Ø15 IL 120.625 TOP =127.80 TOP=128.87
20.6 0 HDD

LI
IL 118.920 (EXTG) IL 127.900
m (1:5 IP D 1.00m
Ø150 HDDIP Ø150 HDDIP Ø150 HDDIP Ø150 HDDIP Ø150 HDDIP
IC-A-14 17.0m (1:50) 47.82m (1:50)
PROPOSED PHASE 2A NOTIONAL BOUNDARY
32.18m (1:50) 35m (1:50)
IC-A-9
35m (1:50) Ø150 HDDIP
D 2.135m 7) EXTG SUMP TO
BU

IC-A-10 IC-A-8 CHAMBER

RY
TL 115.450 25.60m (1:48) BE RETAINED TL=128.87
IC-A-13 IC-A-12 TL 118.690 TL 119.330 TL 120.375 Ø150 HDDIP
IL 113.105 IC-A-1
ING

TL 117.050 TL 118.025 IL 115.535 IL 116.290 IL 116.954 16.0m (1:50) IL=125.970


D 2.345m TL 121.350 IC-TF-2 (EXTG.)
IL 113.445 IL 114.401 D 3.155m D 3.040m D 3.421m
SIZE:700x900 IL 119.650 EXTG. 1700(W) OPEN DRAIN TO BE
1)

DA
D 3.605m D 3.624m TL 121.625
D 1.700m SLABBED OVER
ha NG

SIZE:1050Ø IC-A-7 IL 120.831


DIP

TL 120.948 D 1.068m
0)
D
ILD

IL 117.433
se

IL 119.330
(1:9
8.9 50 HD

UN
D 3.515m
2m
HE
I

EFH 4
Ø1
IST

Existing HR Tanks

D E
1)

BO
IL 119.410
BU

MO AINAG
S
(P

VE
DR
Existing 44 Ton Rigid Pavement
EX

se

ING
TG

RE
EFH 5

IST
ING

BE
EX
ha

TO
GR
AD
EX

. 1:1
(P

2
DRAIN SUMMIT
IST

DF1-0-1
13 TL 129.175 TA
TL 50 P
IL= 12 x100 IL 128.150
12 9.1 0
6.0 75 SU
G
EX

00 MP
BL D

450 WIDE DRAIN (1:200)


TG e 1)

WITH VEHICULAR GRATING

BLOCK W1
600 OPEN
(1:200 DRAI
) N
s

TL 12
ha

IL=
=1 8.0
29 0
PROP. 900(W)x1000
MK14-00180T

.00
BOX DRAIN (1:200)
(P
EX

BOUNDARY LINE / EXISTING FENCING


EL 136.00 EL 135.00 EL 134.00
MK14-01283V
EL 133.00 EL 132.00

MK14-01284P

MK14-01283V

N
Ch ina Co nstruc tion (So uth Pacif ic) Deve lopm ent C o Pte L td

Work Timing

Name of Worker Please indicate a tick only


Start Time End Time if worker had carried out Signature
工人姓名
夜班时间 完工时间 normal day work 备注
白天如有施工请在格里打√