You are on page 1of 1
IRC:SP:73-2018 7.23 Design Report The Concessionaire shall furnish the design roport including the following to the Independent Engineer for his review and comments, (Far FPC, for approval of Authority Engineer) if any. i) Suh soil exploration report as per IRC:78 as specified in para 7.6 above ii) Hydrological investigation report including design discharge calculation for the bridges, in case of any change in the proposed waterway of any bridge as specified in para 7.5 above. Design and drawings of temporary works, foundations, sub-structure and super structure of structures. iv) Detailed report regarding the bridges whose width is less than the roadway width and the proposal for their improvement. v) Any other information relevant to the design report. 7.24 Responsibility for Design and Structural Adequacy The Concessionaire shall be fully responsible for the design, structural adequacy and detailing of bridge and culvert structures. Review by IE, (For EPC, approval by Authority Engineer) shall not relieve the Concessionaire of this responsibility os vs 150m °% 13,00m 4.50m ce) 1 ' 1 i i Steel Steel Crash Barrier Darrier Ba ‘ootpath | Footpath Crash Barrier Fig 7.7 Typical cross section for ROB (All location -all terrain) 050m i 050m 050m 050m 0.50 \ team (280% 500m _usum 800m 150m § Crach Rarer Crash Banier z Crash § Stool Steel 8 Crash Barr 4] Bane j i Bari | @ j Barrier Tig 7.0 Typical cross sevtion uf 4-laite Bridge (2X2 lane) with footpath 2-Lane Highway (Buill-up Area - Plain/rolling terrain) 70

You might also like