IRC:SP:73-2018
7.23 Design Report
The Concessionaire shall furnish the design roport including the following to the
Independent Engineer for his review and comments, (Far FPC, for approval of Authority
Engineer) if any.
i) Suh soil exploration report as per IRC:78 as specified in para 7.6 above
ii) Hydrological investigation report including design discharge calculation
for the bridges, in case of any change in the proposed waterway of any
bridge as specified in para 7.5 above.
Design and drawings of temporary works, foundations, sub-structure and
super structure of structures.
iv) Detailed report regarding the bridges whose width is less than the
roadway width and the proposal for their improvement.
v) Any other information relevant to the design report.
7.24 Responsibility for Design and Structural Adequacy
The Concessionaire shall be fully responsible for the design, structural adequacy and
detailing of bridge and culvert structures. Review by IE, (For EPC, approval by Authority
Engineer) shall not relieve the Concessionaire of this responsibility
os vs
150m °% 13,00m 4.50m ce)
1
'
1
i
i
Steel Steel
Crash Barrier
Darrier Ba
‘ootpath
|
Footpath
Crash Barrier
Fig 7.7 Typical cross section for ROB (All location -all terrain)
050m i 050m 050m 050m 0.50
\ team (280% 500m _usum 800m 150m
§ Crach Rarer Crash Banier z
Crash § Stool Steel 8 Crash
Barr 4] Bane j i Bari | @ j Barrier
Tig 7.0 Typical cross sevtion uf 4-laite Bridge (2X2 lane) with footpath
2-Lane Highway (Buill-up Area - Plain/rolling terrain)
70