Professional Documents
Culture Documents
C02 Installation
C02 Installation
2004
Contents
1 Technical data........................................................3
2.1Packing .............................................................4
5 Commissioning ....................................................10
5.2Connections .................................................... 11
failure..............................................................17
1. Technical data
Main machine
Overall size 1780x1350x2015 mm
Total weight 2100 Kg
Work tank size 1190x832x470 mm
Max. work-piece size 800x500x200 mm
Bed bottom to floor 130mm
Work table
Size 740x400mm
Max. work-piece weight 350 Kg
Table to floor 985mm
Coordinate axes
X、Y、Z travel 350/250/220mm
U、V travel 90mm
Max. taper angle ±15o/150mm
X、Y、U、V minimum resolution 0.5µm
Z minimum resolution 0.0020mm
Position accuracy ISO230-2
Bidirectional accuracy A 0.010mm
Unidirectional accuracy R↑or R↓ 0.005mm
Reversal value 0.003mm
Dielectric unit
Overall size 1190x690x1270mm
Volume 150L
Power of circulating pump 0.9KW
Power of flushing pump 1.5KW
Accuracy of filter cartridge 0.005mm
Number of filter cartridges 4
Cartridge size Φ144.5xΦ32x375mm (from outside to inside)
Deionizing resin 10L
Cabinet
Overall size 1040x650x1780mm
Weight 310Kg
Maximum output power 5KVA
Maximum machining current 25A
Standard power supply voltage 3×380V/3×400 V 5 KVA
Full load current 7.6A
Power supply frequency 50/60Hz
Memory 20G hard disk
Input mode MDI,3.5" floppy disk, DNC
CRT 15" color display
Number of controlled axes 5,four simultaneous
Command mode Incremental / absolute
Measure unit Metric / inch
2.1 Packing
Important:
During handling and transportation of
machine:
• The crate must be kept upright, according
to the arrow on the crate side
• Shock and vibration should be avoided.
Note: The local related requirements to power supply connection must be observed. Good
earthing must be secured with earth resistance no more than 1 Ω.
BAC has configured the generator for standard voltages: 380V/400V. If the user’s power supply is
380V/400V, please confirm the transformer connection way respectively and check the voltage
fluctuation, which should be less than 10%. If the user’s supply is not of standard voltages, an external
transformer (option) will be needed. For the connection way of the transformer, refer to labels on it.
• Machine installation plan
Note: 1. Dimensions around the machine in this figure are the minimum.
2.“▲’s in this figure are the locations of feet of machine.
3.The height of room for the machine should be more than 2.2m。
• Unlocking of X axis
• Unblocking of Y axis
• Unblocking of U, V-axes
[1] Unscrew 15 M5 screws (3) fixing the
upper and middle cover (1 and 2) and
remove the two covers to expose U
locking block (5) and V locking block (4),
5. Commissioning
5.1 Hardware layout
Legends:
KM1-Main contactor for TM1
KM2-Circulation Pump
FC1-Inverter
Main machine
Legends:
(1) Sheath for polarity cables
(2) Sheath for dielectric unit cables
(3) Sheath for main machine cables
- 10 - C2—Installation XENON
11.2004
5.2 Connections
• Connection of main machine and
generator
XENON C2—Installation - 11 -
11.2004
Legends:
(1) Sheath for polarity cables
(2) Sheath for dielectric unit cables
(3) Sheath for machine cables
[6] Connect the cables between main machine and the generator according to the following drawing.
- 12 - C2—Installation XENON
11.2004
XENON C2—Installation - 13 -
11.2004
(3)
(2)
(4)
Connect PE to terminal block first, then the U6, V6 and W6 to KM2 orderly.
- 14 - C2—Installation XENON
11.2004
•Connection of inverter
[1] Open the cabinet front door;
- +1 +2
R/L1 S/L2 T/L3 B1 B2 U/T1 V/T2 W/T2
XENON C2—Installation - 15 -
11.2004
fix lawyer
Caution: before switching on, it is necessary to confirm correct cables connection and
good boards installation.
(1)
- 16 - C2—Installation XENON
11.2004
Caution: before automatic-off program ends, don’t place the main switch in the OFF
position, otherwise the system will not be able to save system data that exist in the system
before power-off.
• Abnormally switching off
By abnormally switching off we mean switching off under urgent conditions. In that case, the system will
not save system data and exits from the current program directly to shut off.
[1] Press emergency stop button (5), the system will shut off.
[2] After shut-off, place the main switch (1) in the OFF position to cut off the mains supply.
Caution: Under special conditions, if the main switch (1) is directly placed in the OFF
position to switch the system off instead of pressing off button (3) or emergency stop button (5),
the data of the current program will lose completely and UPS power supply will not shut off
automatically with the indicator (4) on all the time. To shut off UPS power supply, manually
press B1 button (6) on SUS-B02 board.
If you don’t hope to go on with the interrupted operation after power recovery, proceed as follows:
[1] Place main switch (1) in the OFF position,
XENON C2—Installation - 17 -
11.2004
6. Unblocking of Z axis
[1] Open the work tank door
Wooden block
- 18 - C2—Installation XENON
11.2004
XENON C2—Installation - 19 -