Annex E - Equipment Utilization Schedule (DONE)
Annex E - Equipment Utilization Schedule (DONE)
Section IX
ANNEX E
The Bidder shall include all equipment and machineries which shall be intended for use
exclusively for the Project. If such equipment and machineries are being rented or leased,
duly executed Contract of Lease shall be furnished in this proposal.
2 0 1 7 TOTAL
EQUIPMENT WORKING WORKING
BRAND/MAKE/MODEL CAPACITY HOURS DAYS
MANUAL PIPE
3 3 3 3 5 5 5 5 3 3 3 3 2,536 317
THREADER