What is engineering change management?
SAP PP Tips
The Engineering Change Management (ECM) is used to track and control all the changes with reference to Material master, BOM, Work Center &
Routing.
The first step you need to do is to create a Change master thru CC01 T-code. The system will give you one change number. Using this number you can
change all the masters record. By default, you need to activate the change number, thru ABAP program, you need to activate this field as a mandatory.
Through authorisation we can control the access.
The following are SAP ECM transaction code activities in Engineering Change Management.
Change number
CC01 - Create change number
CC02 - Change change number
CC03 - Display change number
Como nunca notamos isso? As 30 cenas mais pausadas Animais enormes e reais Design e Inovação
See also
SAP PP Customizing Transaction Codes
SAP PP Tips
SAP PP Tips and Production Planning/Control Discussion Forum
Main Index
SAP ERP Modules, Basis, ABAP and Other IMG Stuff
All the site contents are Copyright © www.erpgreat.com and the content authors. All rights reserved.
All product names are trademarks of their respective companies. The site www.erpgreat.com is in no way affiliated with SAP AG.
Every effort is made to ensure the content integrity. Information used on this site is at your own risk.
The content on this site may not be reproduced or redistributed without the express written permission of
www.erpgreat.com or the content authors.