RINCIAN BIAYA UPAH KERJA TUKANG BOX CULVERT

BIAYA UPAH TUKANG


NO. ITEM PEKERJAAN BOX CULVERT VOLUME PEKERJAAN HARGA SATUAN JUMLAH HARGA
15%
1 Beton Struktur, fc’25 Mpa 358.50 2,395,986.75 858,970,833.34 128,845,625
2 Baja Tulangan Polos-BjTP 280 1,901.33 22,827.50 43,402,610.58 6,510,392
3 Baja Tulangan Sirip BjTS 420A 54,057.43 24,092.50 1,302,378,632.28 195,356,795
330,712,811.43