This contingency plan outlines potential problems and control measures for the filming of an iced coffee advert at multiple locations in Poole, UK. It identifies issues such as restricted access to filming locations, equipment damage from spills or electrical faults, missing props or cast, and injured crew members. Control measures include booking locations in advance, using protective equipment, replacing dangerous items, purchasing props ahead of time, maintaining contact with crew, and having first aid available on site. The plan aims to address issues that could affect production and find solutions to allow filming to continue as planned.
This contingency plan outlines potential problems and control measures for the filming of an iced coffee advert at multiple locations in Poole, UK. It identifies issues such as restricted access to filming locations, equipment damage from spills or electrical faults, missing props or cast, and injured crew members. Control measures include booking locations in advance, using protective equipment, replacing dangerous items, purchasing props ahead of time, maintaining contact with crew, and having first aid available on site. The plan aims to address issues that could affect production and find solutions to allow filming to continue as planned.
This contingency plan outlines potential problems and control measures for the filming of an iced coffee advert at multiple locations in Poole, UK. It identifies issues such as restricted access to filming locations, equipment damage from spills or electrical faults, missing props or cast, and injured crew members. Control measures include booking locations in advance, using protective equipment, replacing dangerous items, purchasing props ahead of time, maintaining contact with crew, and having first aid available on site. The plan aims to address issues that could affect production and find solutions to allow filming to continue as planned.
Name of Production: Iced coffee advert. Producers Name: Contact Number:
Location / Potential problem Effect on production Control Measure Existing measures
scene North Rd, Poole People may want access We may have to find a Book room in advance People made aware of filming BH14 0LS to our location new location to film North Rd, Poole Liquid spilled on Equipment may be Use items to protect the equipment. Protective equipment will be used. BH14 0LS equipment damaged North Rd, Poole Live electrical Could harm crew Dangerous equipment will be Equipment will be checked for BH14 0LS equipment members replaced damage. North Rd, Poole Missing props We will not be able to film Purchase props in advance Props will be purchased and kept in BH14 0LS using the props advance North Rd, Poole Missing cast members. We will have a more Always keep in contact with crew Multiple methods of contact BH14 0LS limited crew available. North Rd, Poole Injured crew member We will have a more First aid will be used First aid is available on site. BH14 0LS limited crew.