5 m
Cross-Sectional area of Penstock, A = 23.75829 m2
Static Head at this point, Hstatic = 34.55 m
Dynamic Head at this point including Water Hammer, Hdynamic = 42.85 m
Design flow throgh Penstock, q = 88 m3/s
Nos.ofPenstock = 1
Flow in each Penstock, Q = 88 m3/s
Unit weight of water, w = 9.81 KN/m3
Velocity through each Penstock, V = 3.70397 m/s
Accelaeration due to gravity,g = 9.81 m/s2
Thickness of Penstock, t = 25 mm
Length of thr Penstock from Anchor Uphill toExpansion Joint, L1 = 95 m
Length of thr Penstock from Anchor Downhill toExpansion Joint, L2 = 10 m
Assum, length between anchor to adjacent uphill pier = 5m
Assum, length between anchor to adjacent downhill pier = 5m
VerticalBend details
p=Weight of penstock & contained water from anchor to adjacent uphill pie= 2859.963 kN
p'=Weight of penstock & contained water from anchor to adjacent downhill = 2859.963 kN
0
0
FORCES IN THE ANCHOR BLOCK DURING NORMAL OPERATION
FOREC DESCRIPTION VALUE
Hydrostatic force acting along axis of
1/1' 8052.529 kN
Penstock on each side bend Fs=wAH
Dynamic force acting against outside of bend
2/2' 325.9493 kN
Fd= QwV/g
z
x
C.G. with respect to Toe point @C/L of penstock and converted to the axis shown above
Penstock Details
C.G (x) 5
C.G (y) 3.35
C.G (z) 3.35
Volume of penstock 237.4625 m3
Unit weight of water 9.81 kN/m3
Weight of water in Penstock 2329.507 kN
Length of penstock 10 m
Weight of penstock 338.9238 kN
Total combined weight (Penstock + water) 2668.431 kN
385.715472017537 0
32794.60524 28533.0643752675 0
794.6052415785 28533.0643752675
Base foundation plan area 112.1 m2
Longitudinal length ofbase along C.G. of basepla 15 m
Transverse length of Base along C.G of base plane 7.5 m
C.G. of foundation base plan
C.G. (x) 7.5 m
C.G. (z) 3.75 m
z
x
C.G. with respect to Toe point @C/L of penstock and converted to the axis shown above
Penstock Details