Professional Documents
Culture Documents
Notes :
1) Our scope is only for the supply of Panels.
2) Polythene stretch film Packing is Inclusive, Transportation shall be extra at actuals.
3) Civil works, lifting, installation, testing, comissioning and Erection etc not in our scope.
4) Supervision of commissiong charges if required : Shall be chargeable at 12,000/- per manday.
5) Boarding, Lodging, Air fare charges from Bangalore to Site & Local conveyance : Extra at actuals
6) Earth truck or Earth Switch (Bus and Line earthing) if required will be supplied at extra cost
7) 230V AC and 110V DC supply to be provided by the customer.
Hope the above offer is inline with your requirement. Looking forward for your valuable orders.
Thanking you
For SVG Control Systems Pvt Ltd.
Shankar Kashyap