You are on page 1of 1

2 2

A-3 A-3

A B C A B C A B C

RCD RCD RCD RD


F-01 W-2A C-03 F-06 W-2A C-03 AW
09
AW AW AW AW AW
08 05 9A 04 02
1 AW
DW
02
1 1
13 T&B TOOL STO.
AW
RECORDS 06
DW DW AW 0.6MM THK. PRE-PAINTED/ PREFORMED G.I. RIB
04 02 12 TYPE ROOFING; COLD ROLLED STEEL SUBSTRATE,
AW
11
COMMERCIAL QUALITY; OIL FREE POLYESTER
AW F-03 W-2A C-03 PAINT, OVEN BAKED W/ 10MM THK DOUBLE SIDED
12
DW FOAM INSULATION, USING U-BOLT ON EDGES; 3/16"
F-04 W-02 C-03 DW DW 02 THK 2"X2" ANGLE BAR ROOF AND FLASHING CLIP
A-3

A-3

A-3

A-3
AW SLOPE DOWN
1

1
GARAGE/ WORKING AREA 01 01 (TYPHOON-PROOFING) TEKSREWS ON CENTER
10 DN DW
01
AW
12 AW
AW DW MAINTENANCE HEAD
11 LOUNGE 03 03
DW
T&B 03
F-03 W-2A C-03 F-03 W-2A C-03

2 2 2
UP RAMP UP AW AW AW
14 07 01

F-06 W-2A C-03

2 2
A-3 A-3

GROUND FLOOR AREA= 56.70 SQ.M. SECOND FLOOR AREA= 56.70 SQ.M.

G R O U N D F L O O R (ENGINEERING OFFICE) SECOND FLOOR (ENGINEERING OFFICE) R O O F P L A N

A B C 1 2 C B A 2 1
2
S 6
100 MM CHB
W-05 W-05
C-02 W-03 W-01 C-02 W-02
W-02 W-05 W-05
W-02 W-02

ROOF BEAM LN.


EL. = + 6450
CEILING LINE W-01 W-03
100 MM CHB 100 MM CHB
W-03 W-01
AW AW W-01 AW AW AW
AW 07 01 02 04 06
W-01 AW AW AW W-02 W-02 W-02
14 AW
W-05 12 12 12 03
100 MM CHB 100 MM O.C.
2ND FLR. LN. AW W-01 W-03
W-02 W-03 09
EL. = + 3300
CEILING LINE W-05
W-01
W-01 W-07 W-07 W-01
AW AW AW
W-03 10 AW
11 11
AW 9A
W-02 05 AW
AW 08 100 MM O.C.
13 100 MM O.C.
W-02 W-03 W-03
GROUND FLR. LN.
EL. = ± 0.00
EL. = -250
ROAD CROWN
W-2A W-07 W-07 W-03 2X4 ANALOK ALUMINUM LOUVERS
W-03 W-02
SPACED AT 150 MM O.C.
100 MM CHB

F R O N T E L E V A T I O N LEFT-SIDE ELEVATION R E A R E L E V A T I O N RIGHT-SIDE ELEVATION


W-07