Professional Documents
Culture Documents
"
CØ6
"
TUB. - 204 PVC Ø 6" CØ6
205 PV
TUB. - 22.73m.
L= 2.89m. TUB. - 75.43m.
206 PV
L=
L=
ACC. - 98
REDUCCION 8"x6"
Ø 6"
VC
ACC. - 450 3P
B . - 20 .27m.
TEE 8"x4" TU L= 4 9
ACC. - 99
" CODO 11.25° Ø 6" ACC. - 453
Ø8 ACC. - 452
VC TEE 6"x4" TUB. - 212 PVC Ø 6"
02 P . TEE 6"x4" TUB. - 209 PVC Ø 6"
C Ø
U B8. "- 2 8.88m L= 33.91m. L= 4.48m.
V
P T L=
- 201
TUB. 12.22m. VAL. - 50.
6"
L= TUB. - 210 PVC Ø 6"
CØ
VALV. MARIPOSA Ø 2"/TEE 6"x2"
TUB. - 60.28m.
TUB. - 199 PVC Ø 8" L= 2.97m.
207 PV
ACC. -115 L= 1.74m.
Ø8"
L=
CODO 11.25° Ø 8" PVC
- 200 8m.
ACC. -115 TUB. 7 5 .8 TUB. - 211 PVC Ø 6"
L = L= 44.73m. TUB. - 213 PVC Ø 6"
CODO 11.25° Ø 8"
L= 249.85m.
ACC. - 114
TEE 6"x4" LEYENDA - LINEA DE
ACC. - 97 C Ø 6"
ACC. - 102
208 PV
CODO 11.25° Ø 8" TUB. -
L= 82.5
1m. CODO 11.25° Ø 6" ACC. - 455
TEE 6"x4"
CONDUCCION
"
Ø8
VC ACC. - 456
- 1 98 P 4m. Curva Mayor @ 5 m.
. .9 TEE 6"x4"
TUB L= 60 TUB. - 199 PVC Ø 8"
L= 1.74m.
VAL. - 34.
VALV. AIRE Ø 6" Curva Menor @ 1 m.
ACC. - 449 ACC. - 454
TEE 8"x4" TEE 6"x6"
" Punto de BMs
Ø8
Borde de Parcelas
PLANO CLAVE - SECTOR 6
ESC.: 1 / 25000
388 388
EJE DIAMETRO
E
H3
D
PROG
NOMINAL PULG. B1 B2 H1 H2 TC TR
387 387 (Minimo)
A
(MM)
1.5
630 24" 0.40 1.40 0.15 1.00 0.70 1:5 1.5:1
1.0 500 20" 0.40 1.40 0.15 0.80 0.70 1:5 1.5:1
386 386
450 18" 0.40 1.30 0.15 0.80 0.70 1:5 1.5:1
RELLENO CON 400 16" 0.40 1.30 0.15 0.70 0.70 1:5 1.5:1
MATERIAL
H3
ESTE PLANO ES PROPIEDAD DEL G.R.T.
385 385 5.0 PROPIO 355 14" 0.40 1.20 0.15 0.65 0.70 1:5 1.5:1
SELECCIONADO
315 12" 0.40 1.20 0.15 0.60 0.70 1:5 1.5:1
250 10" 0.40 1.10 0.15 0.55 1.00 1:5 1.5:1
384 384 1.0 RELLENO APISONADO 200 8" 0.40 1.00 0.15 0.50 0.80 1:5 1.5:1
CON MATERIAL DE
PRESTAMO 160 6" 0.40 0.90 0.15 0.50 0.70 1:5 1.5:1
H2
383 383 B1 140 5 1/2" 0.40 1.00 0.15 0.50 0.70 1:5 1.5:1
TERRENO NATURAL 110 4" 0.40 1.00 0.15 0.50 0.70 1:5 1.5:1
CAMA DE APOYO H1 90 3" 0.40 0.90 0.15 0.50 0.70 1:5 1.5:1
382 382 TUBERIA PROYECTADO 75 2 1/2" 1:5 1.5:1
COTA (msnm)
ACC. - 97 ACC. - 98
CODO 11.25° Ø 8" REDUCCION 8"x6" ACC. - 99 ACC. - 100
379 CODO 90° Ø 6" 379
TUB. - 200 PVC Ø
CODO 11.25° Ø 6"
8"
L= 75.88m.
Unidad
VAL. - 26. 1+388.51 393.400 336666.089 8024679.245 VALV. AIRE Ø 12" FIERRO FUNDIDO - ISO 7559
TUB. - 209
PVC Ø 6"
375 L= 33.91m. 375 VAL. - 27. 1+560 390.514 336709.561 8024515.726 VALV. AIRE Ø 12" FIERRO FUNDIDO - ISO 7559
Intel(R) Core(CT) i7-5500U CPU
TUB. - 211 PV
C Ø 6"
L= 44.73m. VAL. - 28. 1+599.66 390.542 336708.327 8024478.636 VALV. AIRE Ø 12" FIERRO FUNDIDO - ISO 7559
TUB. - 210 PVC Ø 6" VAL. - 29. 1+820 388.524 336550.065 8024326.352 VALV. AIRE Ø 12" FIERRO FUNDIDO - ISO 7559
374 L= 2.97m.
374
VAL. - 30. 2+086.18 385.229 336375.734 8024147.823 VALV. AIRE Ø 10" FIERRO FUNDIDO - ISO 7559
VAL. - 31. 2+499.76 381.220 336187.574 8023847.466 VALV. AIRE Ø 10" FIERRO FUNDIDO - ISO 7559
373 373
VAL. - 32. 2+870.51 377.993 336388.870 8023557.245 VALV. AIRE Ø 8" FIERRO FUNDIDO - ISO 7559
VAL. - 33. 3+340 380.380 336289.544 8023141.436 VALV. AIRE Ø 8" FIERRO FUNDIDO - ISO 7559
372 372
VAL. - 34. 3+864.10 375.321 335996.145 8022814.091 VALV. AIRE Ø 6" FIERRO FUNDIDO - ISO 7559
VAL. - 35. 4+352 370.159 335661.739 8022465.673 VALV. AIRE Ø 4" FIERRO FUNDIDO - ISO 7559
371 371 VAL. - 36. 1+424.84 392.098 336683.025 8024648.256 VALV. PURGA Ø 12" FIERRO FUNDIDO - ISO 7559
VAL. - 37. 1+580 390.423 336713.487 8024496.115 VALV. PURGA Ø 12" FIERRO FUNDIDO - ISO 7559
370 370 VAL. - 38. 1+893.20 385.197 336495.412 8024277.661 VALV. PURGA Ø 12" FIERRO FUNDIDO - ISO 7559
3+500 3+520 3+540 3+560 3+580 3+600 3+620 3+640 3+660 3+680 3+700 3+720 3+740 3+760 3+780 3+800 3+820 3+840 3+860 3+880 3+900 3+920 3+940 3+960 3+980 4+000
VAL. - 39. 2+067.54 384.035 336366.817 8024164.154 VALV. PURGA Ø 10" FIERRO FUNDIDO - ISO 7559
COTA TERRENO (m.s.n.m.) 380.08 379.76 379.65 379.86 379.68 379.21 379.10 379.19 378.69 378.30 378.27 378.43 378.14 378.08 377.86 377.49 377.34 377.13 376.97 376.81 376.63 376.32 375.91 375.75 375.60 375.48 VAL. - 40. 2+873.88 376.672 336390.939 8023554.590 VALV. PURGA Ø 8" FIERRO FUNDIDO - ISO 7559
COTA PERFILADO (m.s.n.m.) 380.08 379.76 379.65 379.86 379.68 379.21 379.10 379.19 378.69 378.30 378.27 378.43 378.14 378.08 377.86 377.49 377.34 377.13 376.97 376.81 376.63 376.32 375.91 375.75 375.60 375.48 VAL. - 42. ??? 410.000 337570.293 8025730.931 VALV. MARIPOSA Ø 4"/TEE 16"x 4" FIERRO FUNDIDO - ISO 7559
VAL. - 44. ??? 404.000 337123.436 8025215.268 VALV. MARIPOSA Ø 4"/TEE 12"x4" FIERRO FUNDIDO - ISO 7559
RASANTE (m.s.n.m.) 378.47 378.33 378.20 378.04 377.90 377.74 377.60 377.43 377.25 377.07 376.89 376.68 376.47 376.26 376.06 375.86 375.66 375.47 375.27 375.03 374.83 374.61 374.38 374.16 373.95 373.74
VAL. - 45. ??? 393.400 336666.046 8024678.649 VALV. COMPUERTA Ø 12" FIERRO FUNDIDO - ISO 7559
SUB RASANTE (m.s.n.m.) 378.32 378.18 378.05 377.89 377.75 377.59 377.45 377.28 377.10 376.92 376.74 376.53 376.32 376.11 375.91 375.71 375.51 375.32 375.12 374.88 374.68 374.46 374.23 374.01 373.80 373.59
CORTE (-) / RELLENO (+) (m) -1.757 -1.573 -1.606 -1.964 -1.934 -1.621 -1.650 -1.911 -1.594 -1.376 -1.528 -1.900 -1.821 -1.965 -1.952 -1.780 -1.829 -1.811 -1.845 -1.929 -1.944 -1.861 -1.679 -1.735 -1.801 -1.893
-0.6
-0.
-0.8
5%
-0
PENDIENTE (%) -0.68% 4% 8% -0.77% -0.89% -1.06% -1.03% -0.98% -1.23% -1.17% -1.05%
.99
38%
0.5
%
4m
DISTANCIA HORIZONTAL (ml.) L=76.00 m. L=12.36 m. L=8.98 m. L=49.32 m. L=3.00 m. L=75.63 m. L=22.87 m. L=60.45 m. L=82.75 m. L=34.07 m. L=44.97 m. L=4.60 m. L=249.99 m.
3.3
4m
DISTANCIA INCLINADA (ml.) L=76.00 m. L=12.36 m. L=8.98 m. L=49.32 m. L=3.00 m. L=75.63 m. L=22.87 m. L=60.46 m. L=82.75 m. L=34.07 m. L=44.97 m. L=4.60 m. L=250.00 m.
3.3
Coordinador del Proyecto: Gerente Regional de Infraestructura: Proyecto: Plano: Escala: Plano N°:
REVISIONES
ING. CARLOS VALENTIN MAMANI CONDORI INDICADA
GOBIERNO REGIONAL DE TACNA ING. HUGO CHAMBI CHOQUE
PLANTA Y PERFIL LONGITUDINAL DE RED
Profesional a Cargo de la Especialidad: Nº FECHA DESCRIPCION "MEJOREMIENTO DEL SISTEMA DE DISTRIBUCION DE LOS Fecha:
REGIÓN
TACNA GERENCIA REGIONAL DE ING. RENE WILLIAM COTRADO LLANOS
SECTORES DE RIEGO TOMASIRI, LAS YARAS - DISTRITO DE TERCIARIA 1 - LINEA DE CONDUCCION DE AGUA NOVIEMBRE 2022
S6-PPL-17
Sub-Gerente de Estudios:
EQUIPO TECNICO ING. JUAN F. MALDONADO DELMAS DISTRITO DE INCLAN, SAMA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA __ de ___