Professional Documents
Culture Documents
3rd Floor Power Layout - New
3rd Floor Power Layout - New
CCTV
Bullet CCTV camera
AS
Alarm Sounder
Consumer Unit
T
T.V Point
I
C
550
500
H H
1,000
MALE
500
800
500
800
500
1,100
12,060
500 2,098 500
E
FEMAL
9.38 %
200
C T
1,302
4,044
9.38 %
500
E
FEMAL
909
11
10
12
9
200
200
200
200
1,211
13
8
14
7 C T
BOARD ROOM
15
6
19G x 350
20R x 150
16
5 PRIVATE ROOM
T
17
PRIVATE ROOM PRIVATE ROOM
T
4
3,988
2,000
18
DIRECTORS OFFICE 3
19
PRIVATE ROOM
2
20
C
UP
DOWN
CCTV
200
200
20R x 150
UP
19G x 350
11,275
11,275
10
2,494
2,494
9
4,963
11
CCTV
20
19
18
17
16
15
14
13
12
CCTV
DOWN
200
200
C
T
PRESENTATION NURSING STATION
OFFICE
AUDITORIUM PEDOFFICE CHIEF PHYSICIAN
SPACE OFFICE
3,994
2,000
RECORDS ROOM
OFFICE COUNSELING
C
ROOM
200 CS 8,699 200 3,482C 200 5,852 C 200 C 6,924 200 5,375 C 200 T C 7,395 C 200 4,211 200 2,481 200 6,000 C 200
1,101
200
200
NOTES
1. All cables must be stranded.
2. All switches to be 1500mm high from
finished floor level.
3. All sockets to be 300mm high from finished
floor level.
4. All worktop switches and sockets are to be
250mm high from the finished worktop level
PROJECT: CLIENT: DRAWN BY: I.T.M DRAWING TITLE: ELECTRICAL INSTALLATIONS - REVISIONS DESCRIPTION
PROPOSED RE-DESIGN OF ST. LUKE'S HOSPITAL - SAN FRANCISCO FOR THE KYAMBOGO UNIVERSITY POWER LAY OUT AND SECURITY SYSTEMS, THIRD
STUDENTS OF KYAMBOGO UNIVERSITY CHECKED BY: A.N FLOOR LAY OUT 1. 6TH APRIL, 2022
2. 14TH MAY, 2022
APPROVED BY: SCALE: 1:150
DRAWING NO. GROUP 17/SP/005
SHEET NO: 5/5
DATE: 2OTH MAY, 2022