AD VIII-Group 4 –

Road mapping transportation and connectivity


Road Network &
Vehicular Mobility

Mobility modes
available :

Marking Main Spots


Near the Site
Road Network &
Vehicular Mobility

MORNING 9-10 AM

2 Wheeler
Road Network &
Vehicular Mobility

MORNING 9-10 AM

4 Wheeler
Road Network &
Vehicular Mobility

MORNING 9-10 AM

PMT Bus Stop


Road Network &
Vehicular Mobility

MORNING 9-10 AM

Auto Rickshaws
Road Network &
Vehicular Mobility

MORNING 9-10 AM
Traffic Congestion
Analysis

AFTERNOON 1-2 PM
Pedestrian Movement
Road
Study &
Signage
Study

PMC Boards Pune Metro No Parking Boards


Garware College

Pune Metro No Halting Boards Garware College Gate


Footpath

Footpath with Ramp

Footpath construction work

1. Footpath construction work is going since 3


months and might need more 2 months to
get completed.
2. 3M wide footpath in which 1.5M will be for
Cycle Track.
3. Also the PMT Bus halted on the road
Footpath with Coconut Tree Tactile Tiles because there was no any halting space
provided