You are on page 1of 33
farce i er the [poor eran areas 9 [naval Tes G0 wns wm) ar [sre vcs exten creer adn enn Cn) [Saracen Connon ers pering an cane Bry. ate 1 FAR, Bay. ale, Sng Cavite ery] amar | Tora eys2.2022 Tne #2444 2064) [romer nnd eric ot ‘ie poting cone cr reer (Orel) -OZN BEE Ho 11) [es Fonsi on Tapers) nein and Conergy Slt FR, Bry BAt Sang Cave stag cote oy | ow | AB May 12,2022 Time 12:44 PM, Opening and Concreting of Brgy. Balite 1 FMR, Brgy, Balte 1 Stang, Cavite Siang, cavite FORM POW-2015-018-00 TINIMOM EQUIPHENT REQUIREMENT Equipment Description Capacity | pumber of | | no. ‘Equipment Description Capacity ee [ache with Breaker (GE OCT) SOT Taam 7 Paviader (XB0-20) 1 50-cum., 10 FP sau, 2 [Buldozer, DoH SERIES 1 P3Ps/D, 1655 ish 28 Pte Compactor 200:500 Gasoine Engine) S HP 29 IMotorzed Road Greder, G7I0A/ 140 30 ratory Roti (10 me), SD1000c 3 Concrete Veratr Stick (Gas/Desel Ove 32 Concrete Screecer (5.5 33 [Concrete Sow (75 hp) 14” Bade da 34 Bor Cutter, Sile Phas, 25 mm 3 [One Booger Mixer 36 Welding Machine, (500 A) Gag] Diese Driven, 8 37 cater Machina Ea Kneading Machine 39 40 at az a3 aa co 46 a a8 2 30 [SUB-TOTAL praesof31 oy 23,2022 name 10 9m PRoorAy oF woRK/puDGE cost z ctore somiandiemasttei ha teste cete revo gag etm gene Frc ange 9 oe ae = Feyrsonoo —— ae “aa noe ute ae pein nanan ot Byte a Be, Sng ae star cite ma sue [cnt et en rn rer —eos Pret ites et 69 a fig Tie) engage FR, ey. ae, ti, Cave sna cote Opera and Contig fy Bate A,B, Sang Cave ay 23,2022 Time 12444 cy SCRIPTION wo Tora BET COST = mar ae Toor nara Tae cesT aT ae sa a BIR Tae is Sune = 68 a aust irae | oar ‘OER GENERAL REQUIREMENTS abate mn ae eRe deck —piiiae| carl eeraaiaes ag evatunreD a as seaase| sean Zraet aS EVALUATES ssroster | —se—|——-sutamear| ——aatetet | orate ei 5 ie aS SUBSE 3 = Stina jae] saan Sask PaRre ‘unvace counse ite | Se Suiasnee| ———pnseaae | ——zgoansca | —~"Sazava| aSauae| ao seis ae Sea maar ‘aseacouseTRUCTUREE eet — oe ee 2308 re 2230] = Tee Tas S780 ee Taare Seana ise Sansa = ieaeat Prmuton nd Subst ton peso c rh ori san sae ALO) cette rth eer Poet tea Sonn Say TE oa TS ‘TOTAL PERSORNEL/HAR-OAVS SES omen = a Seacrest 2 ee fase ‘ae Chota cost cen +143) stain tion / Duman po Sen = 0B; Ate 5 on up 2 20 Hn 1S Aare 20 Men 50 e200; Aone 0 Men 4p 10 en -25 C2 (ra Ave 100 iow 156 Non "39. Sees Rem No, /Descrpton Unico Measurement: ‘Opening and Concreting of roy Baie 1 FMR, Brgy. Bate 3, Stang, Cate Slang, Cote ‘DETAILED UNIT PRICE ANALYSIS (OUPA) 1 ALL(@) Construction of Field Offce for the Engnger the Output ner hour As Submitted: 1:00 Suit er hour Ae Evauated 10) FoRM-FOW-2015010-00 Designation [nowt Person/s] No.of Hour/s | Hourly Rate “Amount (Ph) Toga orem T SE aa 2 22 — 2 739 2086.08 I= Ae Submitted 5,505.88 onsracaa FoeaR T a T5670 la2| shes Labor 2 72 282.72 Unskled Labor 2 37.39 2066.08 [Sub-Total for A2= As Evaluated 5,605.46 "Name & Capacity No.of Unt/s | No.of Mour/s | Hourly Rate ‘Amount (Php) [Eauipment nor 135E 0 SSE z lo. [sub =Total for B.-A Submited e055 Equipment anor Tost (0% Taba) ws Unit Ieba GRE REES Poe ‘opening and Concreting of rp. Bate 1 FM, Bray alte 2, Siang, Cavite Sion, Cte DETAILED UNIT PRICE ANALYSIS (UPA) FoRsPow-20 tem No. Bescon AL1(@) Construction of Feld Ofce forthe Engineer ‘cote 3 Ostet Engineering Ofice Item No. / Description Unt of Measurement ‘Output pr hour ~ Ae Subrated ‘Output pe hour” AS Evaluated ‘Opening and Concroting of Bray. Bait 1 FAR, Bray. Balt slang, Cavite sana, covte DETAILED UNIT PRICE ANALYSIS (DUPA) ALL) Provision of Progress Phetooraphs FoRS-POW-2015-010-00 Designation No.of Person/s| No. of Hour/s Hourly Rate ‘Amount (Php) [aber aa| [Sub-Total for Aa = As Submited Labor laa| [sub =Total for 2 As Evaluated [Name & Capacity No. oF Unity No. of Hour/s Hourly Rate ‘Amount (Php) ipment sub =Total for 6 ~ As Submitted [Equipment ‘Quantity | Unit cost ‘Amount (Php) a0 0} m0 6.00, To0 S00} —a Cavite 3rd Dist Engineering Office ‘Opening and Concreting of Bray. Balt 1 FMR, Brpy alte 1, Siang, Cavite Song, Cvte DETAILED UN PRICE ANALYSIS (OUPA) tem No, /Descrition : BS Projet slboard/ Sanboard nit of Measurement @. ‘Output per hour As Submited : 1.00, ‘Output per hour =A Evaluated: 1.00, FORM-POW-2015-010-00 No.of Person/s] No. of Hour/s “Amount (PhP) T To 1 £00 4 100 57.39 | [Sub =Total for A= As Submitted Iabor Consruceon Foreran T 705 Tass la.2| Stale aor 1 1.09 TAS Unsilled Labor 4 100 3738 [Sub - Total for A2= As Evaluated ‘Name & Capacity No.of Unit/s | Wo. of Hour/s | Hourly Rate arr 072 Oar 0.72 487.95 = aa 487.95 ‘£00 ‘L09 487.95 487.95 Unit Cost ‘Amount (Php) Biboara Marie (OSM 1.2m XZ) ‘Common Nas Assorted [sub Total forr2- As Ealated Total Unit Cost = As Evaluated AANMOMER Y-DETA TORRE IIT Cate 3rd District Engineering OMe agen tat IT PRICE ANALYSIS (OUPA) FoR POW-2015-010-00 em No, Deseroten 18.712) Ceaupatonal Safty and Heath Proaram Unto Measurement ts (utp per nour” As Submited | 100 (utput per heur-AS vaunted 100 Tare uine [sate enecesan ‘COW 19 Rap Anibody Te i S 1c) 7000 30. sepa aac [Sentara Sten i Ecol Ford aoa En acto ia 20.00 185.09 za Disnfetnt Sr an ‘co00| oan] ‘eo;0000 aw Hap Sean i 0.00 20.0) ac0000 [Sab = Teal For FA Ar SubriRa enn ‘opening and Conereting of roy Balite 1 FAR, Bray. Belts, Sang Cavite Stang, cate DETAILED UNIT PRICE ANALYSIS (OUPA FoRM-Pow-2015 010-00 er no Descrision : ‘cupatonal Safety ac Heath Proaram S76 sea [a7 “em ee 32 320.0 500600 a 0.00 sean 18500 zn “oo. ‘saann00 ‘} aon c2lTotal Unit Cost = As Evaluatea w FORA TORRE mr gies (cave 3 Ostet Enpeerng Ofc Tem No, Desciton 2 nto Measurement: utp perhour” Ae Submited Output pereurASEvaated ls x x pening and Conreting of Bro. Bate 1 FAR, Bro. Halt , Sang, Cavite ‘Stang, Cate DETAILED UNIT PRICE ANALYSIS (OUPA) 19 Webilaten/Demetitzaton ‘0 0 FoRN-POW-2015-010-00 Designation Not Person/s No.of Hour/s ourly Rate ‘Amount (Pho) [aa|tabor =Total Tor A As Submited. [Sub Total Yor A= Ax Evaluated ‘Name & Capacity No. of Unit/s No of rp/= auipment Bed TRE TO, ESE Tol Gul wor Tae BHO | ioronrwens. 8.2 san 90 T97 = 2O,ROBao ad [Benedstan sob conte Bad on Opening and Concreting of Bray. Balite 1 FMR, Bray. Balite2, Slang, Cavite Sarg, Cavts FoRN-pow-2015.010-00 No.of Pereon/s| No.of Hour/s | Hourly Rate ‘Amount (Php) ‘No.of Unt/s | No.of Hour/s | Hourly Rate "amount (PhP) 2 Direct Unit Cost (C.1 + D.1)- As Evaluated ‘opening and Concretng of Brgy. Balite 1 FMR, Brgy. Ballte 4, Slang, Cavite Sang, cout DETAILED UNIT PRICE ANALYSIS (UPA) FORM-POW-2015-010-00 Rem No, | Desoriton 184 (8) Permanent Monuments and Markers Unit of Measurement @. Cutoxk ber hour As Submited : 1.00 Ounout ber hour - AS Evaluated: 1.00 Opening and Conersting of Bray. Balite FMR, Bray. Balite 1 Slang, Cavite Song, Cate DETAILED UNIT PRICE ANALYSIS (DUPA) FORM-POW-2015-010-00 1027(1) Cement Paster Fish |vo.of Person/4 No. of Hour/s] Hourly Rate] “Amount (Php) No, of Unit/s | No. RYDEN TORRE 1 Engineer Tr ‘cite 31d District Enaineering Office Balite 1 FMR, Bray. Balite 4 Slang, Cavite Cavite [DETAILED UNIT PRICE ANALYSIS (OUPA) FORU-FOW-2015 010-00 em No, Desroton Paving Works (Masonry Paint) Unt of Measurement san. ‘usp per hour" As Submited: 2.400 Stet ber hour-A vated: 2.100 Designation Jho.of Person/s No, of Hour/s] Hourly Rate| ‘Amount (Php) tabor 1 cers Frama iT | sas = 2 a aber 1 TB. for Ax = As Submitted Labor p.2| Carsten Fararan = me -2 Sed Labor 2 ae ‘Unsiled Labor 1 33. [Sub Total for A2=As Evaluated Name & Capacity No.of Units No.of Hour/s| Hour Rate Equipment por Too (IDE aber COS) = Tota for B= As Submited ea vt OH a2 30 9.08 08.0] 24.32 0.05 i 38.00 0.08 50.00] — $520 623 Cave 3d District Engineering Office age tof opening and Concreting of Brgy. Balte 1 FMR, Brgy. Balite 2, Silang, Cavite Slang, Cavite DETAILED UNIT PRICE ANALYSIS (DUPA) FORM-POW-2015-010-00 Tem No. f Desristion 404(1)2Relnforcng Stee! Bar, Grade 40 ko 180.00 No.of Person/s| No. of Hour/s ‘Amount (Php) No, of Unit/s | No. of Hour/s SCEET |E-2|pirect Unit Cost (C.1 + D.1)- As Evaluated ‘Name & Specification nit Quantity | Unit cost “Amount (Php) (2 oF RSS) © 0a 30.0 Ts Bars Deformed Grade 40 ig. 108 85.00 68.25 = As Submitted Tosa 3.0 Tas PR ORSBL : 65.00 68.25 ‘Cavite 3a District Engineering Office ‘Opening and Concreting of Bray. Balite 1 FMR, Brgy. Balite 4, Silang, Cavite ‘Stang, Cavite DETAILED UNIT PRICE ANALYSIS (DUPA) FoRM-POW-2015-010-00, Item No. / Deseriston + A0S(x)a2 Structural Concrete (20.68 MPa - Class A) ~28 Days Unt of Measurement: :oum (Outpt per hour = As Submitted: 1.40 (Outut per hour -AS Evaluated = 1.40 Designation No.of Person/s| age200131 ‘opening and Concreting of Bray. Balite 1 FMR, Bray. Balite 4 Slang, Cavite Stang, Cavte DETAILED UNIT PRICE ANALYSIS (OUPA) FORM-POW-2015010-00 405128 Structural Concrete (20.68 MPa - Class A) -28 Days Lumber Good Tatas BEE | Piboard Marine (00125 X 1.2m X 2A) 3 Be Cases) 2} Common Nols sored | ‘| °2)~ pertand Cement | 359 ne Aggrenate aim 3s Gravel 3/4 eum. i [Sub - Total for F.2- As Evaluated [Ga birect Unit Cost (Et + F.1)~ As Submitted [6.2 [Direct Unit Cost (E.2 + F.2) ~ As Evaluated Thales Cavite 3d Dstt Engineering Office Page 210638 ‘opening and Concreting of Bray. Bate 1 FMR, Brgy. Bate 1, Silang, Cavite Fors-Pow-2015-010-00, i 00 No, of Hours Opening and Concreting of Bray. Balite 1 FMR, Bray. Balite 2, Silang, Cavite Stang, Cave DETAILED UNTT PRICE ANALYSIS (OUPA) FORM-POW-2015-010-00, Item No. / Description 100(3)82 Individual Removal of Trees (301 mm @-500:mm small 100 00 No.of Person/s| Hourly Rate Unit Cost Fa" Wire Rope OF bl Dia @S-amm) —Suses| Ta a 50m [Sub = Total for Fi ~ As Submitted 2.00 350. ‘Opening and Concreting of Bray alte FMR, Brgy. Bait 1, Silang, Cavite Slang, Cave ‘DETAILED UNIT PRICE ANALYSIS (UPA) ORS Pow-2015-010-00, Rem No. Description 10263) Surplus Unlasied Exavaon Hourly Rate T Tan z i ‘No.of Unit/s | No.of Hour/s T t z fea] le2} lba| lbal e4 5 —— 2 [Direc Unit Cost (C1 + D.1)- As Evaluated ‘Name & Specification Unit Quantity tera : Sub Total for Fa = As Submited Materats Fa| = {SubTotal OEE AS Elune ‘cote 3d Distt Enanering ice ‘opening and Concrating of Brgy. Balite 1 FMR, Bray. Balite 1, Silang, Cavite Siang, Cavite DETAILED UNIT PRICE ANALYSIS (DUPA) FORN-POW-2015-010-00 Wem No, / Description 104(2}2 Embankment from roadway excavation (Common Sol) Unit of Measurement um. (Output per hour= As Submitted: 50.00 (Output per hour As Evaluated: 50.00 Designation No.of Person/s| No. of Hour/s | Hourly Rate ‘Amount (Phe) T oa ‘SB 2 08s 9527 T 00 O35 2 £00 38 T oss “oss oo 57:39 T 00 is = 100 37:38 398.81 No. of Unit/s | No. of Hour/s | Hourly Rate ‘Amount (Php) z oss 5822.00 502452 —1 8s 5,676.00 4734.06 1 0s 81.00 206753 r 00 87.00 2787.00 | Tr 1100 2457.00 - (57.00 1 025 2,687.00 TLS 15,718.88 F Dump Truck, 12 yd, 2507p a 7a2700 amas —1 ‘088 5,676.00 4711.06 I 083 2,451.00 2,067.53 i 100 2,787.00 278700 i 100 457.00, 2:57.00 1 025 2,687.00 on 5718.08, 6,117.60-| : 16,117.69 — 50.00, 'D-2}Output per hour - As Evaluated [___ 50.00 | -1| Direct Unit Cost (C.1 + D.1) - As Submitte 322.35 E.2| Direct Unit Cost (C.1 = D.1) - As Evaluate 32235 ‘Name & Specification Unit Quantity | Unit cost ‘Amount (Php) a [Materia [Sub = Total for Fl- As Submitted = = = 1nd Concreting of Bray. Stang, Cavite -L FMR, Brgy. Bate 1, Slang, Cavite DETAILED UNIT PRICE ANALYSIS (OUPA) FORM-POW-2015-010-00 tem No. / Description 10K1}a Embankment fom roadway excavation (Common Sail) Cavite 3rd District Engineering Office rage260f51 Rem No, / Descrton Unit of Measurement : sam, Output per how A Submittes | 300.50 Sueput per hour As Evaluated: 300.00 Fonte7ow-2015.010-00 Designation ‘No.of Hour/s ‘Amount (Ph) To Cone Foreman ‘rst Labor 10 ub - Total for A = As Submited To 100 ‘No.of Hours ‘Quantity Hater Item Ne, / Description nit of Measurement: ‘Out. per hour= As Submited (usoat be hours Evauated ‘opening and Concreting of Brey Bate 1 FH, Bray. Balt, Stang, Cute Slang, Cavte DETAILED UNIT PRICE ANALYSIS (UPA) FoRMPOW-2015010-00, 206(1) _Pamer-Based Chea Sl Adobe No.of Hour/s 0 100 Ta 1.00 No, of Hour/s 7H ss 20 Quantity E 15 3m 215% Semone Facer 1d So Saat) E 1 [ove (er20 Oyram Li ‘opening and Concroting of Brgy. Balite 1 FMR, Brgy. Balite 1, Silang, Cavite Sang, Cave DETAILED UNT PRICE ANAL A) FORM-POW-2015-010-00 tem No, /Deseition + SLM(I}e1_ Portland Cement Concrete Pavement (Unrinforced) -0:23m thick @ 14 davs Unit of Measurement som. ‘utp per hour” As Submitted : 70.00, ‘Output pr hour= As Eveluated.: 70.00, Designation Hourly Rate ‘Amount (Ph 3,089.91 ‘Amount (Php) Opening and Concreting of Bray. Balite FMR, Brgy. Balite 1, Silang, Cavite ‘Stang, Cavite DETAILED UNIT PRICE ANALYSIS (OUPA) FORN-POW-2015-010-00 tem No, / Descrton {311(8}¢1 Portland Cement Concrete Pavement (Unrenforced) -0.23m thick @ 14 days ‘Opening and Concreting of Brgy. Ballte 1 FMR, Bray. Slang, Cavite DETAILED UNIT PRICE ANALYSI em Wo. / Description 611 (2)__Trees (Furnishing and Transplanting) Unit of Measurement ea, (Output per hour =As Submitted: 1.00 Output per hour = AS Evaluated: 1.00 , Silang, Cavite FORM-POW-2015-010-00 Designation No.of Person/s| No. of Hour/s | Hourly Rate ‘Amount (Php) Tabor laa| — Sub - Total for A.1 - As Submitted [Labor a2| [Sub = Total for A.2- As Evaluated — Name & Capacity No. of Unit/s | No. of Hour/s | Hourly Rate “Amount (Php) — 1.00, 100-] Quantity [Unit Cost ‘Amount (Php) 06. 00 00 35.00. 00. Cavite 3rd District Engineering Ofce Page 30131

You might also like