You are on page 1of 10

BORANG HIRARC (HIRARC FORM)

Faculty/Department/Unit/Laboratory/Workshop: Conducted By:


Fakulti/Jabatan/Unit/Makmal/Bengkel: (Name, Position)
Work Process/Location/Block: Disediakan Oleh:
Proses Kerja/Lokasi/Blok: (Nama, Jawatan)

Approved By: Prepared Date: (from)


(Name, Position, Signature) Tarikh Disediakan: (dari)
Disahkan Oleh:
(Nama, Jawatan, Review Date:
Tandatangan) Tarikh Disemak:

Approved Date: Second Review Date:


Tarikh Disahkan: Tarikh Semakan Semula:

1. Hazard Identification 2. Risk Analysis


Pengenalpastian Hazard Analisis Risiko
Which can cause/effect
Existing Risk Control (if any) Likelihood Severity Risk
No. Work Activity Hazard Yang Boleh
Kawalan Risiko Kebarangkalian Keterukan Tahap Risiko
Bil. Aktiviti Kerja Hazad Mengakibatkan/Kesan
(sedia ada) (A) (B) (AxB)
Likelihood Scale Severity Scale Preventive Measures (Control Scale)
Skala Kemungkinan / Kebarangkalian Skala Keterukan / Ketenatan Langkah Kawalan (Hierarki Kawalan)
5 - Almost Certain / Paling Mungkin (Setiap Jam) 5 - Catastrophic / Malapetaka 1 - Elimination / Penghapusan
4 - Likely / Mungkin (Setiap Hari) 4 - Fatal / Kematian 2 - Substitution / Penggantian
3 - Possible / Dapat Dijangka (Setiap Minggu) 3 - Serious / Serius (MC lebih 3 hari/Hilang Upaya Kekal) 3 - Engineering Control / Kawalan Kejuruteraan
2 - Unlikely / Jarang Sekali (Setiap Bulan) 2 - Minor / (MC kurang 3 hari/Kecederaan Tidak Kekal) 4 - Administrative Controls / Kawalan Pengurusan
5 - Personal Protective Equipment / Peralatan Perlindungan
1 - Rare / Tidak Mungkin (Setahun Sekali) 1 - Negligible/ Lelasan Kecil, Lebam, Luka Ringan, Kecederaan Ringan
Diri

Risk / Tahap Risiko


A risk identified as LOW may be considered as acceptable and further reduction may not be necessary. However, if the risk can be resolved quickly and
1-4 - Rendah (Low)
recorded.

5-12 - Sederhana (Medium) A MEDIUM risk requires a planned approach to controlling the hazard and applies temporary measure if required. Actions taken must be documented o

15-25 - Tinggi (High) A HIGH risk requires immediate action to control the hazard as detailed in the hierarchy of control. Actions taken must be documented on the risk asse
utm/oshe/hirarc/v01

(to)
(hingga)

3. Risk Control
Kawalan Risiko

Recommended Control Measures PIC (Due date/status)


Langkah Kawalan Yang Orang Bertanggungjawab
Disarankan (Tarikh Tamat/Status)
uickly and efficiently, control measures should be implemented and

umented on the risk assessment form including date for completion.