Professional Documents
Culture Documents
Module 4 Case Study 1 DRAFT
Module 4 Case Study 1 DRAFT
COLLEGE OF ENGINEERING
MODULE 4
CASE STUDY
TECHNOPRENEURSHIP 101
Group members:
Lauglaug, Jefter
Mandreza, Jessicca Dannielle
De Jesus, John Cyle
BSCpE 4 – G
Submitted to:
Dyanne Brendalyn Mirasol-Cavero MEIE
Republic of the Philippines
CEBU TECHNOLOGICAL UNIVERSITY
MAIN CAMPUS
M. J. Cuenco Avenue Cor. R. Palma Street, Cebu City, Philippines
Website: http://www.ctu.edu.ph E-mail: coedean@ctu.edu.ph
Phone: +6332 402 4060 loc. 1135
COLLEGE OF ENGINEERING
1. Rate of Return
a. With the assumption of 70 units manufactured in the first 2 years and having the total cost of
275,450 PHP. The rate of return for the proposed product’s total cost would 15% annually.
2. Return of Investment
a. The proposed product’s total material cost for its design and fabrication of 70 units will be around
275,450 PHP. The company will see their ROI of the first units sold within 7 years.
3. Breakeven Point
Assumptions:
Fixed cost per unit: 3,935 PHP
Total estimated fixed cost per annum (70 units): 275,450 PHP
Variable cost per unit: 500 PHP
COLLEGE OF ENGINEERING
5. Investment
a. As per our estimation, the cost for building one product will cost approximately 3,935 PHP. In
order to produce our initial goal of at least 70 products, we will need 300,000 PHP as an initial
investment to achieve that goal in mind.