xv). CP Units with Serial Interface (Rs485) to be installed shall be provided with facilities for sending
and receiving digital and analogue input/ output signals for remote SCADA/ RTU monitoring/
controlling system. Supply, installation and termination of copper conductor PVC insulated
screened cable for sending analogue signals and copper conductor YFY cable for sending digital
signals between CPTR & SCADA system I/O rack shall be in the contractor‟s scope. Facility for
hardware communication (RS 485) for CPTR/ CPPSM data to SCADA shall be provided by CP
Contractor at CPTR/ CPPSM unit.
xvi). The CP system contractor shall include the services of Owner/ Consultant approved agency (if
contractor does not have the required field / modeling expertise) for carrying out AC/DC
interference survey and implementing mitigation measures against DC, AC interference on
pipeline due to proximity of foreign DC source, AC source/ HV line, etc. If any portion of pipeline
is under protected due to interference , CP contractor should consider providing additional linear
anode to overcome the under protected area including using of existing TRU or providing new
TRU of anode capacity without any extra cost to owner.
xvii). It shall be CP system contractors‟ responsibility to verify and ascertain the types of power
supply available at site at CP station location during detail engineering stage. No change in the
quoted price due to any change in the chainage location of CP Station / types of power
supply unit during the execution of the project shall be admissible.