You are on page 1of 2
QOCO Ref: APCO/CO/2022-23/ 102.9 3 28.12.2022 Qpuo INFRATECH PVT.LTD. ‘CIN: US1432UP1992PTC013969 To, Shashi Bhushan General Manager National Highways Authority of India, G-5&6, Sector-10, Dwarka, New Delhi- 110075 Phone: +91-11-25074100/200 (Extn. 1280) E-mail: shashibhushan@nhai.org Sub: Construction of 6-lane Greenfield VaranasiRanchi-Kolkata Highway from junction with Chandauli-Chainpur Road near Khainti village to junction with Bhabhua- Adhaura road near Palka village (from Km. 27+000 to Km. 54000) under Bharatmala Pariyojana in the state of Bihar on Hybrid Annuity Mode-Clarification Sought. Dear Sir, With reference to the above captioned subject matter, we enclose herewith the Pre-bid queries for necessary clarification to enable us to submit the competitive offer. S. [GLNo./ Deseri Observation Remarks No. | Section / Page No. 1. | Schedule B - | B Connecting Roads / Service | whereas in Highway | Please clarify. Appendix B- | Road Sr. No. 10 drawings- cross MH (A) section BB & C-C CH. 53+420 to 53+800 B Connecting | Length - 380 mtr. Width - | i@th of slip road shown is 5.50 mtr. Roads /| 7.50 mtr. Service Road Sr.No. 10 2. | Schedule B [In the case of grade separated | Cross road levels not | Please provide. C149 ii structures, the type _ of | provided in P&P. ture and ject_Highway and_the roads shall be as ied in Appendixes given and Appendix B-II of this schedule. 3. | Schedule B - |Sr. No.5 CH.40+510-2x7 | Minor Bridge cum | Please clarify Appendix B- Underpass (Over XI1B (1) B Roads & —Nallas) whereas in Structural GAD drawings it is rsa Trade Tower, 4th Fooy, Sector 48-49, Soha Road, Gurugram -122 01 (Haryana) Phone: *91-124-4417300, Fox 91-124-4817349 Heod office APCO House, 8-3, Vibhut and, Gomti Nagar, Lucknow -226 010 (UP) f091522-4036111-20,2720520-21, Fax: +91-522-4036100, -Mall:admin@apcointa.com, Website: wwwapcointa.com showing 2 x 10. 4. | General Land Acquisition Status, Please provided the details of total Land required, already acquired and status of remaining. 3. | Appendix B-IK | Utility Relocation Plan Tris not provided, | Please Provide. Page 43 6 | General KMZ Please Provide, 7. |General DPR Please provide the DPR for reference. 8. | General Forest Area. Ts the Project | Please Clarify. Alignment crosses any forest area. ‘Thanking your and assuring our best attention always. ‘Yours faithfully

You might also like