Ref: APCO/CO/2022-23/ 102.9 3 28.12.2022
Qpuo
INFRATECH PVT.LTD.
‘CIN: US1432UP1992PTC013969
To,
Shashi Bhushan
General Manager
National Highways Authority of India,
G-5&6, Sector-10, Dwarka, New Delhi- 110075
Phone: +91-11-25074100/200 (Extn. 1280)
E-mail: shashibhushan@nhai.org
Sub: Construction of 6-lane Greenfield VaranasiRanchi-Kolkata Highway from junction
with Chandauli-Chainpur Road near Khainti village to junction with Bhabhua-
Adhaura road near Palka village (from Km. 27+000 to Km. 54000) under
Bharatmala Pariyojana in the state of Bihar on Hybrid Annuity Mode-Clarification
Sought.
Dear Sir,
With reference to the above captioned subject matter, we enclose herewith the Pre-bid queries for
necessary clarification to enable us to submit the competitive offer.
S. [GLNo./ Deseri Observation Remarks
No. | Section /
Page No.
1. | Schedule B - | B Connecting Roads / Service | whereas in Highway | Please clarify.
Appendix B- | Road Sr. No. 10 drawings- cross
MH (A) section BB & C-C
CH. 53+420 to 53+800
B Connecting | Length - 380 mtr. Width - | i@th of slip road
shown is 5.50 mtr.
Roads /| 7.50 mtr.
Service Road
Sr.No. 10
2. | Schedule B [In the case of grade separated | Cross road levels not | Please provide.
C149 ii structures, the type _ of | provided in P&P.
ture and
ject_Highway and_the
roads shall be as
ied in Appendixes given
and Appendix B-II of this
schedule.
3. | Schedule B - |Sr. No.5 CH.40+510-2x7 | Minor Bridge cum | Please clarify
Appendix B- Underpass (Over
XI1B (1) B Roads & —Nallas)
whereas in Structural
GAD drawings it is
rsa Trade Tower, 4th Fooy, Sector 48-49, Soha Road, Gurugram -122 01 (Haryana) Phone: *91-124-4417300, Fox 91-124-4817349
Heod office APCO House, 8-3, Vibhut and, Gomti Nagar, Lucknow -226 010 (UP)
f091522-4036111-20,2720520-21, Fax: +91-522-4036100, -Mall:admin@apcointa.com, Website: wwwapcointa.comshowing 2 x 10.
4. | General Land Acquisition Status, Please provided the
details of total Land
required, already
acquired and status of
remaining.
3. | Appendix B-IK | Utility Relocation Plan Tris not provided, | Please Provide.
Page 43
6 | General KMZ Please Provide,
7. |General DPR Please provide the
DPR for reference.
8. | General Forest Area. Ts the Project | Please Clarify.
Alignment crosses
any forest area.
‘Thanking your and assuring our best attention always.
‘Yours faithfully