Professional Documents
Culture Documents
POLICY:
The purpose of this procedure is to govern the process by which physical moves, upgrades and other
physical changes to ____ computer assets are requested and performed.
This procedure is necessary to:
Facilitate the delivery of IMAC services within the larger technology support organization,
Ensure excellent customer service, and
Track asset changes for accounting and security purposes.
SCOPE:
This policy applies to a Move, Add or Change for a desktop computer system that does not involve the
installation of a new system, an installation of a pre-existing system or the decommissioning of an
existing system.
DEFINITIONS:
The following terms are used within this document.
IV. Image/Re-Image
The process of imaging or re-imaging a desktop computer system involves two steps:
image creation and image application. An image is a snapshot of a desktop computer
system’s software configuration that can, to a great extent, be copied to another desktop
computer system in lieu of loading each software component separately per the various
software installers. Use of an image reduces the time necessary for such a task to a
small fraction of the time necessary to build a configuration ‘from scratch’.
Image creation is performed by first building a system configuration with the installers for
the individual software components. This time investment is necessary to ensure that the
base system is configured properly. After configured and tested, the base system is
copied to a software file, hereafter referred to as the image, using the standard image
transfer software.
Image application involves copying the image to the new system using the appropriate
image transfer software. The system is then tested before deployment to the business.
V. Decommission
A desktop computer system that is decommissioned is either pulled from active service,
pending future redeployment to another end-user or function, or permanently retired from
service by being irretrievably disposed, destroyed or sold. In either case, a decommission
requires the appropriate changes to the Asset Management record(s) for the hardware in
question.
PROCEDURE:
RELATED PROCEDURES:
POLICY IDENTIFICATION:
Executive
Executive
REVIEW/REVISION HISTORY:
Description of Review/Revision
Review
Next
Changes Revision(s) approved by
Version Review Change (section by
Date (Y or N)
Date and description) Title Signature Title Signature