You are on page 1of 1

AGAKHAN MAIN HOSPITAL INSPECTION

14th June 2021


DEPT AREA/FINDINGS RECOMMENDATION TO BE CLOSED BY
RENAL Moldy entrance wall This is due to very powerful ac and require daily wiping 16th June 2021
Stained main door handle To be d` stained 15th June 2021
Cobweb at the staff room and shelves Cobweb removal to be done routinely 15th June 2021
Double stickers on detergent containers Old stickers to be checked at scrapped before the new 15th June 2021
Good waste segregation Good job, keep it up CLOSED
Good dusting in patient areas Good job keep it up CLOSED
CSSD Cobwebs along the CSSD corridor
Dusty windows at the CSSD corridor
Dirty floor along the CSSD towards waste collection area
Stained floor at the sterilization area
Stained mops and wrongly placed/hanged 20TH June 2021
Dirty working tools i.e dustpan
This area need constant checks
Expired detergent stickers
Dirty bins
Dirty door glass and moldy wall on the exit door
Wrong uniform, gloves and no nametag by staff (Mabia)
CHEMOTHERAP Stained chemotherapy sign This to be done immediately 14th June 2021
Y Window rail/sliding close nursing in charge dusty This should be daily job be provided with a checklist 20th June 2021
Cobweb and floor stained at the treatment room Team member to be allocated 17th June 2021
Cobweb in the preparation room To be removed asap 15th June 2021
Good waste segregation Good job keep it up CLOSED
Good hazmat observation (up to date stickers) Good job keep it up CLOSED
THEATRE Recovery area curtains not sticked To be sticked every time changed 15TH June 2021
Hazmat stickers not up to date To be observed always 15th June 2021
Power surge is on and off affecting operations Maintenance to check this always -
Opening of ceiling and leaving it open on the higher Maintenance to check on this -
Staff lounge okay Good job keep it up CLOSED
Doctor`s lounge okay Good job keep it up CLOSED