Pre & Post-Construction Anti-termite treatment

September 12, 2020 by Sanjay Singh

In this article, we explained full procedure of anti-termite treatment in building, pre-treatment, and
post treatment. Chemicals used for anti-termite treatment

Table of Contents

 What is Anti termite treatment?

o 1. Dry wood termite

o 2. Subterranean termite

 Methods of Anti Termite treatments

o 1. Pre-construction Anti Termite treatment:

 1. Site Preparation:

 Chemicals Used for Anti Termite Treatment

 2. Soil treatment:

 1. Excavation for Foundation trenches, column pits, basement:

 2. Soil used in plinth filing:

 3. Near the junction of walls and floor:

 4. Treatment at the outer wall edges:

 5. Soil around the pipes:

 6. Soil around the expansion joint:

o 2. Post-construction Anti Termite treatment:

 1. Observation of the building:

 2. Soil treatment around the foundation:

 3. Floor bottom soil treatment:

 4. Treatment of cavities in masonry:

 5. Woodworking Treatment:

 Quesries solved in this article

What is Anti termite treatment?

The treatment done to prevent the growth of termites in the house is called anti-termite treatment. 

Termites are more common in tropical and subtropical countries.  It eats wood, leather, plastic,
paper, etc. 
There are two types of termites. 
1. Dry wood termite 
2.  Sub-terranean termite
1. Dry wood termite
Dry wood termite lives in wood and eats wood hollow.  It has nothing to do
with clay. 
2. Subterranean termite
Subterranean termite live in the ground and eat wood, leather, paper, etc. 
Methods of Anti Termite treatments
Anti termite treatment can be divided into two parts. 
1. Pre-construction Anti Termite treatment
2. Post-construction Anti Termite treatment
1. Pre-construction Anti Termite treatment:
This treatment is done in two stages. 
 Site Preparation
 Soil treatment
1. Site Preparation:
Wood pieces, tree roots etc. are removed from the place where construction is
to be done.  If a termite infection is found, it should be treated with chemical
drugs.  A hole is drilled in the raft and a disinfectant solution is poured into
the hole.
Chemicals Used for Anti Termite Treatment

Chemicals Concentration by Weight

1. DDT 5%

2. BHC 0.5%

3. ALDRIN 0.25%
Chemicals Concentration by Weight

4. HEPTACHLOR 0.25%

5. CHLORDANE 0.5%

CHEMICALS USED FOR ANTI TERMITE TREATMENT


2. Soil treatment:
In these phases the soil below and around the building is treated with a solution of disinfectant
chemicals, the chemicals used for anti termite treatment are as follows:

Chemicals Concentration

ALDRIN 0.5%

HEPTACHLOR 0.5%

CHLORDANE 1%

DIELDRIN 0.5%

CHEMICALS USED FOR ANTI TERMITE TREATMENT

Soil treatment is given in the following stages. 


1. Excavation for Foundation trenches, column pits, basement:
The bottom surface and vertical surfaces of excavation up to a height of 300
mm, should be treated using 5 liters of solution for 1 m2 area. 
The soil filling in the foundation work, columns, basements etc. should be
treated using 7.5 liters of solution for 1 m2 of vertical surface area. 
2. Soil used in plinth filing:
The topmost layer of soil used for filing in plinth needs to be treated with
suitable chemical solution. 
It has a 50 to 75 mm deep, 150 mm c/c hole in the soil filling between the four
walls.  The solution is poured into it at the rate of 5 liters per square meter
area. 
3. Near the junction of walls and floor:
In this way, a 30 mm wide and 30 mm deeper channel is made near the wall
and floor junction in the soil, above the plinth.  This channel has a hole
at 150mm c/c distance. The solution is then poured into this hole at the rate
of 7.5 liters for 1m2 of vertical surface area. 
4. Treatment at the outer wall edges:
In this treatment, 300 mm deep pits are made at a distance of 150 mm c/c  on
the outside adjacent to the outer wall.  The solution is then poured at the rate
of 2.25 liters for a length of 1 m.  The pit is then filled with clay. 
5. Soil around the pipes:
Where the pipe enters or exits the building, the soil should be treated with
termite resistant solution up to a distance of 150 mm on the outside and up
to 300 mm on the inside. 
6. Soil around the expansion joint:
The soil below the flooring should be treated with 2 liters of solution for 1 m
length of joint length. 
2. Post-construction Anti Termite treatment:
The various stages of post-construction termite resistant treatment are as
follows:
1. Observation of the building
2. Soil treatment around the foundation
3. Soil treatment under the floor
4. Treatment of cavities in masonry
5. Treatment of woodwork. 
1. Observation of the building:
The purpose of the observation is to know how much termite was brought into
the house and where it originated as well as which parts of the building were
damaged. 
2. Soil treatment around the foundation:
 In this stage the soil under the foundation and around the building is
treated. 
 A trench about 50 cm deep is dug on the outside of the outer wall of the
building. 
 Holes are drilled in this trench at a distance of 150 mm c/c with iron
rods. 
 This hole should be up to the top of the footing or at least 50 cm deep. 
 The soil is then treated with 1.5 liters of solution per 1 m2 of surface
area in contact with the soil. 
3. Floor bottom soil treatment:
Where there are cracks in the floor, A 12 mm diameter hole is made at a
distance of 300 mm c/c.  The disinfectant solution is poured into this hole until
the bottom soil is saturated. 
4. Treatment of cavities in masonry:
This treatment involves drilling holes of 12 mm diameter at an angle
of 45degree on the surface of both sides at the plinth level in the masonry wall
at a distance of 300 mm c/c.  An anti-termite disinfectant solution is poured
into these pores. 
5. Woodworking Treatment:
In this treatment, the wood is provided with a 6 mm diameter hole 130 mm
c/c at an angle of 45degree towards the bottom.  An oil based chemical
solution is pumped in this hole. 
Quesries solved in this article
How to do Anti termite treatment before foundation P.C.C?
For termite treatment in foundation before Construction of P.C.C, used pre-
construction anti termite treatment methods. we explain all procedure and
important information related to pre-construction anti termite treatment in
this article. read carefully. i hope your all doubts are clear but if your doubts
not clear then comment below.
What are the Anti termite treatments chemicals?
The chemicals used for termite process are given above in article.
What are the Methods of Anti termite treatment?
methods are explain above with full details. majorly two methods are used. pre
construction and post construction termite treatment.
Also read:
 Methods to Repair leakage of toilet and Bathrooms.

 How to Repair Dampness and Efflorescence in wall.

 5 Best Method To Repair Brick Wall Defects || Repair of Brick Wall Cracks etc.

 How many types of chemical admixture used for concrete.

 Special Types of Repair Material for Building Maintenance

Related

What is Building Maintenance | Pre and Post Monsoon Maintenance

March 24, 2020


STABILIZED MUD BLOCK OR BRICK

December 12, 2019

What is Corrosion of Reinforcement | Causes of corrosion of reinforcement

October 27, 2022

Categories ARTICLE, building maintenance Tags Anti termite treatment, chemicals for anti termite
treatment, post construction anti termite treatment, pre construction anti termite treatment

Mostly Used IS codes for bricks List || Download Pdf