DAILY FIT UP WORK ORDER & REPORT Total DI Based On Drawing

WO No. :
Date : Status
Line No. : 143-6393-WFF-50-C1B-16-….. To 143-6393-WFF-50-C1B-16-….. Shop Field
Remarks : Area
Foreman : APW IRS
Fitter :: Sheeter Packaging
Page : Booster Pump

Spool Joint Size/DI Joint Actual Progress Total Total


No. Spool No. Tanggal Lokasi
Qty Qty (Inc) No. 1 2 3 4 5 6 7 Joint DI
1 Spool 1 53 53 2 3
2 Spool 1 53 53 2 3A
3 Spool 2 53 53 2 5
4 Spool 2 53 53 1 6
5 Spool 2 53 53 2 10
6 Spool 2 53 53 2 11
7 Spool 2 53 53 2 12
8 Spool 2 53 53 2 13
9 Spool 2 53 53 2 14
10 Spool 2 53 53 2 16
11 Spool 2 53 53 2 17
12 Spool 2 53 53 1 26
13 Spool 2 53 53 2 27
14 Spool 2 53 53 2 36
15 Spool 2 53 53 2 37
16 Spool 2 53 53 1 38
17 Spool 2 53 53 2 42
18 Spool 2 53 53 2 42A
19 Spool 3 53 53 2 43
20 Spool 3 53 53 2 43A
21 Spool 3 53 53 2 44
22 Spool 3 53 53 2 45
23 Spool 3 53 53 2 46
24 Spool 3 53 53 2 47
25 Spool 3 53 53 2 49
26 Spool 3 53 53 2 50
27 Spool 3 53 53 2 58
28 Spool 3 53 53 2 59
29 Spool 3 53 53 1 60
30 Spool 3 53 53 2 69
31 Spool 3 53 53 2 70
32 Spool 3 53 53 1 71
33 Spool 3 53 53 2 75
34 Spool 3 53 53 2 76
35 Spool 3 53 53 1 77
36 Spool 3 53 53 2 81
37 Spool 3 53 53 2 82
38 Spool 3 53 53 2 83
39 Spool 3 53 53 2 84
40 Spool 3 53 53 2 86
41 Spool 3 53 53 2 87
42 Spool 3 53 53 2 95
43 Spool 3 53 53 2 96
44 Spool 3 53 53 1 97
45 Spool 3 53 53 2 106
46 Spool 3 53 53 2 107
47 Spool 3 53 53 1 108
48 Spool 3 53 53 2 112
49 Spool 3 53 53 2 113
50 Spool 3 53 53 1 114
Terms & Conditions :
1 This sheet must be open/close by Eng. Dept. & fill by Foreman Leader
3 This sheet must be return to office every day after work & collect by Piping Spv. for recapitulation report
4 Work Order must be completed & checked by authorized PIC before open the new Work Order
Collected By, Checked By, Approved By,

Zaenal Arifin Lailatul Kodri Nofri Suhendra


Foreman Piping Spv. Q.C. Dept. Eng. Dept. Site Manager