SERVICE: FIRE-FIGHTING
Cross Sectional drawings for the pumps shall be shared Noted and CSD attached
Diesel Fuel Tank details to be shared. Noted and drg attached
Engine shall be Heat Exchanger cooled type. Complied
WAREHOUSE
M/s. INSTAKART SERVICES
HARIGNATTA -
PVT.LTD
WESTBENGAL
INDEX
SR NO. DESCRIPTION
1. COMPLIANCE SHEET
2. CATALOGUE
3. DATA SHEET
WAREHOUSE
M/s. INSTAKART SERVICES
HARIGNATTA -
PVT.LTD
WESTBENGAL
PUMP COMPLIANCE
1 Design Intent
The fire system has been designed considering separate loop for sprinkler and hydrant system. All the fire
All the Fire pumps necessary, Motor Control Centers shall be supplied by Appointed Contractor,
Cabling and allied equipment within the pump house will also be provided by the Appointed
The scope of work includes, installation, testing and commissioning of equipment within the firefighting
pump house as follows:
Electrically operated Horizontal split case single stage type Centrifugal pumps with motors and diesel
engine driven pump with diesel engine, common base plate, coupling, coupling guard and Complied
accessories.
The pump performance curves shall be suitable for parallel operation of the pump sets. NA
Motor shall be suitable for the duty application and also suitable for 150% of discharge Complied
Pump shall be able to discharge 150% of its rated discharge with head not less than 65%. Complied
Automatic starting system with all accessories, wiring and connections and pressure switches. Contractor Scope
Power supply requirement for Motor control center. Contractor Scope
Annunciation system with all accessories writing and connections Contractor Scope
Pressure gauges with isolation valves and piping bleed and block valves Contractor Scope
Vibration eliminator pads and foundation bolts. Only foundation bolts to be supplied
Leak-off drain shall be led to the nearest floor drain. Contractor Scope
20mm/25mm Circulation relief valve shall be provided for the main electric pumps. Contractor Scope
Factory inspection and testing of pump before delivery is must. Appointed contractor to arrange for Complied
Main pumps ON/OFF status and Selector switch on Manual mode shall be hooked up & monitored on
Contractor Scope
Fire alarm panel with indication and hooter in 24X7 manned locations.
The rating and duty class of the motors selected shall be based on the load imposed by the
TS curve shall be submitted of pump and
equipment and the number of starts per hour. The speed torque characteristics of the motors shall be
motor seperately and not superimposed
matched with those of the coupled machine.
All the motors efficiency class shall be IE-2, if not specified in data sheet. Complied
Motor shall be designed for direct on line starting Complied
The motor terminal box shall be top mounted with adequate size for terminating the required number Need to check with CGL
As per KBL Std Fuel tank- Need GA
Fuel tank for diesel engine pumps shall be provided with all accessories like inlet, outlet, drain, level
drawing and scope to be clear in that
sensor/gauge, overflow, return, manhole and containment etc. drawing
Fuel tank shall be minimum 5mm thick and epoxy coated with proper supporting and shall be factory As per KBL Std Fuel tank - Need to
assembled and in cylindrically shape clarify the thickness
Fuel tank capacity of single tank shall be 750litrs. Complied
All civil foundation for pumps as per pump OEM shall be in Appointed contractor scope. Contractor Scope
All the pumps shall be factory assembled along with base frame and other accessories of pumps. Appointed
Complied
contractor to share all the test certificates of the pump as required by consultant.
d) Diesel Engine Driven Pump – Standby Pump for Sprinkler, Hydrant & Water Curtain System
SECTION-II: CATALOGUE
Vijay Engineering & Mech. Company
180 Power
120
60
15.0 100
Minimum Continuous Safe Flow (MCSF)
13.5 90
450 mm
12.0 80
10.5 70
427 mm
Head - kg/cm2
Efficiency - %
9.0 60
Efficiency
7.5 50
360 mm
6.0 40
4.5 30
3.0 20
1.5 10
0.0 0
NPSHr - m
12
NPSHr
6
0
0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800
Flow - m3/h
Vijay Engineering & Mech. Company · 74,Shariff House, · Shahid Bhagatsing Road, Fort · Mumbai, Maharashtra 851 101
Phone:
Version: 20.1.1
'
()*
' 2(+ & -00 2-+
$ $
)(+ '
"$" ,- ' .
"$"" /0,1
/
'
2"""$" /0,
$!
*,1 !
!!
!
*-- 20+ $%
"!
!
3
"!
&
4
& &%&& ! !
4
"" $$ !
$""
&'
" $$
" $""
-2- ' 2-0 .*, ** %
- &'
3
$
/04
$" /04
5
$ /04
$
/04
6 $
/04 $
/04
&'
3 2 $ 2""
$
.-0 5
2
$
2""
$
& 6
2
$
2""
$
0+&++
7 '
$""
$""
$"" !"$""
, , , ,
1(+ *++
!
-++ *,' *,'
,)+ %% ,8 %$ % , #
,-+ &' %% ,8 % , #
%
,8 %
,8
% & ,8
.0+ ,
!
.,
2
$ /0 ' 2
$ /0
*0+ %9
$ /0$
'
% ' # %
% *
)++ & +
./0-+
./)0+ $.0+520% $ ""$" /0
& + %& & $
2""$" /0
& %
$
$ /0
& * %
: $
#
, $ # #
%;<=>? @ ;51> 40$ ;$ A<
!"#$ %;<=>? @ ;51> 40$ ;$ A<
B + # %2 % B
%% & ' & &$
#
& %% ()( & % * $ & #
& %$ %$ & +$
!" #
' &' % %%$ ++& #
"2 $# % CD
% %
& % % %
!" # $ $
%
$
$
&
% $
#"
!
"#
! # # # #! "
#
$
% # # #!"&!'
)$
#
.. #
#!"&!'
#
%## ,
#, "
&, , " !, "
#! 01*23 - 0452 !67, 0, +1
01*23 - 0452 !67, 0, +1
8# ! )# " ##9 # 8#
## "
( "
SECTION-III: DATASHEET
M/S.INSTAKART SERVICES PVT.LTD.
2 MAKE KIRLOSKAR
OPERATING CONDITIONS
6 FREQUENCY 50 Hz
PERFORMANCE
9 EFFICIENCY 82 (67) %
LIQUID
MATERIAL
PRESSURE DATA