BETANO REFINERY

PROJECT
Refinery & Petroleum Service Unit
Project Overview
The Betano complex will consist of an industrial park with refinery and petrochemical industries, along with a petroleum industry administration
city. The refinery will provide domestic fuel such as diesel, gasoline, jet-fuel, and LPG.

The Betano Refinery Complex with capacity 30.000 bpsd. plan in three phases at
approximate 2-3 years interval. The three phases are:
Phase - I: Condensate Splitter Unit
Phase - II: Adding NHT and Reformer unit Source of Feedstock from:
Phase - III: Adding Aromatics Units.
Phase I operation, the Naphtha Splitter is modeled to recover Benzene in Heavy - Bayu Undan & Greater
Naphtha in such a way that Benzene specification in final Reformate is met if Light
Naphtha is blended with imported reformate. Sunrise field when it
During Phase II operation, (addition of Naphtha Hydrotreater and Platforming Unit),
column is modeled to limit Benzene, Cyclohexane (CH), Methylcyclopentane (MCP) in
developed;
Heavy Naphtha feed for Platforming feed and thereby meeting final Benzene limit of
1.0 liq vol% in Reformate product from Platforming Unit.
- Timir-Leste’s onshore field
In Phase III operation (addition of Aromatic Fractionation), column is modeled to - Other crude from the region
maximize Benzene, CH, MCP in Heavy Naphtha to have desired Benzene yield from
Aromatic Fractionation. However recovery of Benzene precursors in Heavy Naphtha
is limited by RVP specification of Light Naphtha.
Conceptual Land Design
Land Development Concept Betano Refinery

EL.+17.0 m MSL

EL.+12.0 m MSL

EL.+7.0 m MSL
Project Description
 Feed : Bayu Undan condensate
 Capacity : 30,000 barrels/day
Critical equipment's (columns, fired heater) designed for 40,000 barrels/day
 Location & Plant Layout
a. Refinery Area = 230 Ha
b. Tank Farm & Jetty ( SSB ) = 42 Ha
Development Phases

Phase I

Phase I 2019
Phase II 2022
Phase III 2025
Refinery Production Rate
Product Distrubution
Product Logistics

DISTRIBUTION @ PRODUCTION @
Suai Tankfarm & Jetty Betano Refinery

Distance 78 KM

Underground
Pipeline
Product Logistic
 INTERNATIONAL SHIPMENT
 Tankers (loading by marine loading arms)

 DOMESTIC SHIPMENT
 Tank truck / ISO tank (loading by truck loading arm)
 Bottles
Project Costs

TOTAL INVESTMENT (MMUSD)

 Detailed Studies (FEED + EIA/HIA) = 5.0


 Land development = 40.0
 Process + tank farm + pipeline + jetty = 570.0
 Others = 35.0
TOTAL = 650 @ ± 20% (accuracy)